TED - Tenders Electronic Daily (Publications Office of the EU) verified 1 week ago Contract notice

Germany - Electronic equipment - Renewal of 400 Hz systems H2, H6, H7, T1 and T2

Original Deutschland - Elektronische Ausstattung - Erneuerung 400 Hz Anlagen H2, H6, H7, T1 und T2

Closed Germany Köln Electrical machinery

Buyer Flughafen Köln/Bonn GmbH

Key facts

Published
Procedure
Negotiated procedure
  1. Published
View the official notice Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

Summary

Machine-generated summary

The existing 400 Hz installations at Terminal 1, Terminal 2 and Hangars 2, 6 and 7 are to be replaced with new rotating and static 400 Hz systems. Each bidder carries out commissioning and training of operating staff. Required capacity is 90 kVA with an output voltage of 200/115 V at 400 Hz. To minimize grid feedback (harmonics), the converter must use an active rectifier without an input transformer, ensuring soft start without high inrush current. Harmonic content must not exceed 5% at full load, the input power factor must be 1.0, and the inverter must include an isolating transformer. Two 90 kVA outputs with full GPU functionality and interlock capability are required.

Description

Die bestehenden 400-Hz-Anlagen an Terminal 1, Terminal 2 sowie in den Hangar 2, 6 und 7 sollen durch neue rotierende und statische 400-Hz-Systeme ersetzt werden. Die Inbetriebnahme sowie die Einweisung des Bedienpersonals erfolgen durch den jeweiligen Bieter. Die bestehenden 400-Hz-Anlagen an Terminal 1, Terminal 2 sowie in den Hangars 2, 6 und 7 sollen durch neue rotierende und statische 400-Hz-Systeme ersetzt werden. Die Inbetriebnahme sowie die Einweisung des Bedienpersonals erfolgen durch den jeweiligen Bieter. Die erforderliche Leistung beträgt 90 kVA, bei einer Ausgangsspannung von 200/115V, 400Hz. Um die Netzrückwirkungen (Oberwellen) so gering wie möglich zu halten, muss der Umformer mit einem aktiven Gleichrichter, ohne Eingangstransformator, ausgestattet sein. Durch diese Technik ist ein Sanftanlauf, ohne hohen Einschaltstrom, gewährleistet. Der maximal auftretende Oberwellenanteil darf bei Volllast 5% nicht überschreiten. Der zum Eingangsnetz auftretende cos phi muss bei 1.0 liegen (sinusförmiger Eingangsstrom). Sollten während des Betriebes Netzunregelmäßigkeiten auftreten (Spannungs- und Frequenzschwankungen bzw. Micro-Ausfälle), so sind diese durch den Gleichrichter auszugleichen. Damit während des Standby-Betriebs die Leistungsaufnahme auf ein Minimum reduziert werden kann, ist ein Leistungsschütz vor den Leistungskomponenten des Gleichrichters vorzusehen. Zusätzlich muss ein von außen bedienbarer Eingangstrenner integriert sein, der ein Abschalten aller internen Spannungen, vor dem Öffnen des Umformerschrankes, sicherstellt. Der Wechselrichter ist mit Trenntransformator zur galvanischen Trennung der Last aufzubauen. Der Umformer verfügt über zwei 90 kVA Abgänge die jeweils bis cos phi 1.0, d.h. 90 kW belastet werden können und sind standardmäßig mit vollständiger GPU-Funktionalität vorzusehen. Die Abgänge müssen gegeneinander verriegelt werden können. Sind die Abgänge nicht gegeneinander verriegelt beträgt die maximal kombinierbare Abgangsleistung beider Abgänge 90kW. Weiterhin muss der Wechselrichter des Umformers über einen automatischen Kompensationsregler für den Spannungsabfall von bis zu 12%, auf dem 400Hz Kabel vom Umformer bis zum Flugzeugstecker, verfügen. Die Spannung am Flugzeugstecker ist in Abhängigkeit vom Laststrom und Leistungsfaktor auf den Nennwert zu regeln. Für den Abgleich des Kompensationsreglers muss, für die einmalige Parametrierung bei der Inbetriebnahme, eine automatisierte Routine vorgesehen werden.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 week ago

Flughafen Köln/Bonn GmbH

Germany

notices in the register
79
awards
23

Who wins its contracts

Many suppliers
different companies won its awards
17
of the awards went to the three most frequent winners
22%
of its calls state an estimated value
28%

Based on 18 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

of the awards went to companies based in another country
6%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Awards most often to

  1. DEKRA Automobil GmbH, Niederlassung Köln 2 awards
  2. Schüßler-Plan Ingenieurgesellschaft mbH 1 award
  3. Peter Gross Infrastruktur GmbH & Co. KG 1 award

7 open tenders right now

Market context

open now in Electrical machinery
2,380
median open notice
€143,332

Who wins in this market

Many suppliers

Germany · Electrical machinery

different companies won awards here
475
of the awards went to the three most frequent winners
5%
buyers awarded contracts here
304

Based on 594 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
3.3
of those lots received a single tender
34%
of the awards went to companies based in another country
13%
of the tenders came from another country
10%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

41 new notices in Electrical machinery in Germany in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Electronic equipment: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language