Skip to content
Aperlena

Observatory Croatia

Public procurement in Croatia - July 2026

55.4% more notices than in June 2026.

1,771 Notices

  • 301 Awards
  • 381 Buyers
  • €348.7M Awarded value 77% carry a value

Croatia, July 2026: 1,771 notices from 381 public buyers. 301 contracts were awarded, worth €348.7M in all; 77% of them state a value.

Sector mix

Medical equipment & pharmaceuticals: 22% of the month's notices that carry a sector

Notices published in July 2026, by sector

Table
Medical equipment & pharmaceuticals: 22% of the month's notices that carry a sector
Sector Notices
Medical equipment & pharmaceuticals 392
Construction work 234
Architecture & engineering services 121
Repair & maintenance services 118
Transport equipment & vehicles 108
IT services 96
Petroleum, fuel & energy 78
Furniture & appliances 72

Source: Aperlena register, notices indexed as of October 16, 2026. See the data

Download the data (CSV)
Cite this figure

"Medical equipment & pharmaceuticals: 22% of the month's notices that carry a sector". Source: Aperlena register, notices indexed as of October 16, 2026. https://aperlena.com/en/stats/hr/2026-07#chart-sectors

Free to reuse with attribution, "Aperlena (aperlena.com)" and a link, under CC BY 4.0.

Embed

Paste this code where the chart should appear. It follows the figures as they are recounted and links back to this page.

<iframe src="https://aperlena.com/en/embed/stats/month-sectors?country=hr&amp;period=2026-07" title="Medical equipment &amp; pharmaceuticals: 22% of the month&#039;s notices that carry a sector - Aperlena" width="100%" height="620" style="border:0" loading="lazy"></iframe>

Free to reuse with attribution, "Aperlena (aperlena.com)" and a link, under CC BY 4.0.

Link to this figure

Largest published awards

  1. Hrvatska - Željezničke i tramvajske lokomotive i vagoni i pripadajući dijelovi - Nabava 6 (šest) baterijskih elektromotornih vlakova (BEMV) i puštanje u pogon 1... KONČAR - Električna vozila d.d. €53,599,800
  2. Hrvatska - Građevinski radovi, građevinski radovi na temelju i građevinski radovi na površinskom sloju autocesta, cesta - Izvođenje preostalih radova nad rekons... TEXO MOLIOR d.o.o. €19,396,833
  3. Breakwater construction works - Construction of the New Port of Korcula - Polaciste port POMGRAD INŽENJERING d.o.o. €16,089,339
  4. Hrvatska - Građevinski radovi na cjevovodu, komunikacijskim i energetskim vodovima - Izvođenje radova za projekt zamjene vrelovodne mreže 2026. €13,636,483
  5. Hrvatska - Sanacijski radovi - Sanacija kolnika na autocesti A3 Bregana - Zagreb - Lipovac, od km 166+000 do km 190+000 lijevo €12,187,525

Method: counts come from official procurement notices aggregated by Aperlena; a notice belongs to the month it was published and an award to the month it was decided. Value sums cover only awards whose official notice states a value - the coverage percentage says how many do. Nothing is estimated.

Amounts in rankings and totals: an award amount is printed as its source publishes it. From EUR 50 million up, an amount is left out of every sum, ranking and list of the largest when it is more than 20 times its own notice's estimate, when the same buyer has already stated the same amount on an earlier award (a contract restated by later notices, or a ceiling shared by several lots, is counted once, on the earliest), or when it is above EUR 500 million and more than 100 times the 99th percentile of three years of awards in the same country and sector. The award still counts as an award, and its own page shows the published amount.

Reuse: the aggregate statistics computed by Aperlena (figures, charts and the downloadable tables) may be reused with attribution under CC BY 4.0. Attribution: "Aperlena (aperlena.com)", with a link. The underlying notices remain subject to the terms of their official sources.

Coverage: a country or a sector is covered from the first month since which its monthly notices hold steady up to today. Walking back from the last complete month, a month counts while it holds at least a third of the median of the three months after it. Earlier months are drawn hatched and labelled partial. No change is printed across them, nor when a month is more than double or less than half the one before: in this register that is a source being loaded, not a market moving.

Figures as of October 16, 2026, 04:40 UTC.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language