Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 2 days ago Contract notice

Finland - Civil engineering, road and water works and other construction, main or subcontract - Call for participation: Improvement of Highway 21 between Kuttanen and Jatuni ST, Enontekiö

Original Suomi - Maa-, tie- ja vesirakennustöiden ja muiden rakennustöiden kokonais- tai osaurakat - Osallistumispyyntö: Valtatien 21 parantaminen välillä Kuttanen-Jatuni ST, Enontekiö

Open Finland Pohjois- ja Itä-Suomi Construction work

Buyer Väylävirasto

21 days to request

Key facts

Requests to participate by
13:00 (UTC+2)
Competition
Open race
  1. Published
  2. Today
  3. Deadline open for 34 days
  4. Awarded pending

Bidding window

33 days from publication to deadline

Usual length

Notices of this kind (Finland, restricted procedure, above the EU threshold) give a median of 30 days, half of them between 18 and 33 days, based on 50 notices of the last two years.

This buyer usually gives 31 days (median of its last 185 calls for tender).

View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

The Aperlena Verdict

Open race

No supplier dominates: 9 different companies have won the last 17 comparable contracts from this buyer over 5 years. This is a genuinely open race.

Expected final price vs the published estimate
-13%

Based on 17 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.

Summary

Machine-generated summary

This is a design and build (ST) contract for the improvement of Highway 21 (Vt 21) between Palojoensuu and Maunu in Enontekiö, Finland. The scope covers producing the construction design for road plan areas plv. 600-3040 and 19000-29060 and carrying out the construction works in the extent required, complying with all contract documents so that the end result, structures, technical systems and building materials meet the set requirements. The contractor acts as principal contractor and site safety coordinator, performs quality control, information, reporting and warranty-period works, and obtains ground investigation data including borehole soundings, 3D ground penetrating radar surveys of the existing highway and road structure surveys for the design stage.

Description

Urakka on kokonaisperusteinen Suunnittele ja toteuta -urakka (ST). Tarjoukseen ei edellytä liitettäväksi alustavaa rakentamissuunnitelmaa. Kuitenkin urakoitsija vastaa tarjousratkaisujensa tuotevaatimusten mukaisuudesta. Urakkaan sisältyy Vt 21 parantaminen välillä Palojoensuu - Maunu, Enontekiö, tiesuunnitelma plv. 600-3040 sekä 19000-29060 hankkeen rakentamissuunnitelman tuottaminen ja rakennustyön toteuttaminen kohdassa 3.4 edellytetyssä laajuudessa kaikkien urakka-asiakirjojen mukaisesti siten, että työn lopputulos, rakenteet ja tekniset järjestelmät, niiden osat ja käytetyt rakennusaineet täyttävät niille asetetut vaatimukset. Urakoitsijan tulee suorittaa kaikki ne työt ja niihin liittyvät hankinnat, jotka asiakirjojen mukaisen työsuorituksen valmiiksi saattaminen edellyttää ja joista ei nimenomaan asiakirjoissa mainita, etteivät ne kuulu urakoitsijan suoritusvelvollisuuteen. Allekirjoittanut urakoitsija sitoutuu jäljempänä määriteltyä urakkahintaa vastaan suorittamaan sopimusasiakirjoissa määritellyn urakan ja toimimaan ra-kennuskohteessa pääurakoitsijana sekä työmaan turvallisuuden johdosta vastaavana urakoitsijana (päätoteuttajana). Lisäksi urakkaan kuuluu laadunvalvonta-, tiedotus-, raportointi-, takuuaikaisia töitä ja päätoteuttajan rooliin kuuluvia yhteensovittamisvelvoitteita urak-kaohjelman mukaisesti. Lisäksi urakkaan kuuluu myös seuraavat rakentamissuunnittelun lähtötietohankinnat: - Tilaajan laadituttaman pohjatutkimusohjelman tekeminen, tulkinnat sekä aineistojen viennit suunnittelutietokantaan - Vt 21 levennyskohdissa suojaputken avulla tiepenkereen läpi tehtävät siipikairaukset - Nykyisen valtatien 21 3D-maatutkaus tulkittuna - Urakka-alueen väylärakenteiden sis. päällystekerrokset maatutkauksen ja sen tulkinnan tekeminen urakan rakentamissuunnittelun lähtötiedoksi sekä aineistojen viennit suunnittelutietokantaan Urakkaan kuuluu töiden osalta suunnittelun ja rakentamisen toteuttaminen sopimusasiakirjojen vaatimukset täyttäen siten, että se myös tekniseltä toimivuudeltaan vastaa sille sopimusasiakirjoissa asetettuja vaatimuksia. Urakkaan kuuluu myös tiedotus-, raportointi- sekä takuuaikaisia töitä ja päätoteuttajan rooliin kuuluvia yhteensovittamisvelvoitteita tarjouspyyntöasiakirjojen mukaisesti. Urakkaan kuuluu työt siinä laajuudessa, kuin ne on tarjouspyynnön liitteenä olevissa asiakirjoissa määritelty kaikkine tiejärjestelyineen, varusteineen ja laitteineen. Urakan sisältö on määritetty tarkemmin tarjouspyyntöasiakirjoissa.

Terms of the procedure

How tenders are scored
Halvin hinta
Small firms
The buyer marks this procedure as suitable for small and medium-sized firms.

As the official notice states them.

Bid or no-bid?

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. Check this first:

    Do we meet every eligibility criterion?

    Restricted procedure: suppliers first ask to take part, and only those the buyer selects are invited to bid.

    Above the EU threshold: open to companies from any EU country.

  2. Your call:

    Can we deliver this with the team we have?

    The register holds nothing on this. The official documents will.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Construction work.

  4. In your favour:

    Is the deadline realistic for a proper offer?

    21 days left, 15 of them working days.

  5. Check this first:

    Is there a margin at the likely winning price?

    This buyer usually awards this kind of contract for between €3.5M and €24.8M.

    Contracts here close a median of 13% below their estimate.

  6. In your favour:

    Do we know this buyer?

    9 different companies won the last 17 comparable contracts.

Can I bid?

  • Restricted procedure: suppliers first ask to take part, and only those the buyer selects are invited to bid. Above the EU threshold: open to companies from any EU country.
  • The notice is written in Finnish.
  • Certificates from another EU country? Check the equivalents on eCertis

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 2 days ago

What this buyer has paid before

Based on 17 comparable contracts this buyer awarded in this sector over the last 4 years.

Median award
€7.9M
Middle half of past awards
€3.5M to €24.8M

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.

Most recent awards

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Väylävirasto

Finland

notices in the register
491
awards
155
awarded in total
€691.9M

Who wins its contracts

Many suppliers
different companies won its awards
76
of the awards went to the three most frequent winners
20%
of its calls state an estimated value
12%

Based on 116 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
3.4
of those lots received a single tender
8%
of the awards went to companies based in another country
1%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Who usually wins this buyer's contracts in this sector

Company Wins Total awarded Last win
GRK Suomi Oy 5 €95.4M Apr 2026
Sundström Infra Ab Oy 3 €22.0M Oct 2026
Kreate Oy 2 €40.2M Jan 2026
NRC Group Finland Oy 2 €14.0M May 2026
Suorsa Group Oy; NRC Group Finland Oy 1 €30.0M Aug 2025

Based on 17 awards with a linked company profile over the last 5 years.

16 open tenders right now

Market context

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.

open now in Construction work
20,149
median open notice
€559,898

Who wins in this market

Many suppliers

Finland · Construction work

different companies won awards here
340
of the awards went to the three most frequent winners
7%
buyers awarded contracts here
203

Based on 529 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.5
of those lots received a single tender
5%
of the awards went to companies based in another country
1%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

64 new notices in Construction work in Finland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Works for complete or part construction and civil engineering work: an email when new tenders arrive under it, no account needed.

21 days to request

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language