Awarded to
Pomorskie Przedsiębiorstwo Mechaniczno - Torowe Sp. z o.o.; TRANSKOL Sp. z o.o.
- Awarded value
- €92,601,083
- Award date
- Bids received
- 14
- Record with this buyer
- 1 first contract from this buyer in the register
- Back on the market
- Oct 2029 How we know
When this contract comes back
estimated from the stated durationThis contract runs about 41 months, so it is back on the market around October 2029.
Every contract expiring, on the radarSummary
Machine-generated summaryPKP Polskie Linie Kolejowe S.A. awarded a contract for the design and execution of construction works on a double-track section of railway line no. 8, from km 196.095 to km 218.129, between Sitkowka Nowiny and Miasowa. The works cover track, platform, road, building, bridge, sanitary, traction, non-traction power supply, railway traffic control, teletechnical, geotechnical, hydrotechnical and environmental design, plus an optional interface scope. The contract was awarded to Pomorskie Przedsiębiorstwo Mechaniczno-Torowe Sp. z o.o. and TRANSKOL Sp. z o.o. for EUR 92,601,082.57, with the award date 22 May 2026.
Description
Terms of the procedure
- How tenders are scored
- Price
As the official notice states them.
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 day ago
What this buyer has paid before
Based on 85 comparable contracts this buyer awarded in this sector over the last 4 years.
- This award
- €92.6M
- Median award
- €24.1M
- Middle half of past awards
- €5.8M to €91.1M
The award is larger than three in four past awards.
Most recent awards
- Roboty budowlane - „Zaprojektowanie i wykonanie robót w ramach zadania pn.:” Prace na linii kolejowej numer 404 na odcinku Białogard - Kołobrzeg wraz z robotami towarzyszącymi realizowanego w ramach projektu „poprawa bezpieczeństwa i likwidacja zagrożeń eksploatacyjnych na sieci kolejowej -ETAP II” €7,922,984
- Roboty budowlane - Remont sieci trakcyjnej w dwóch lokalizacjach: 1. Remont sieci trakcyjnej poprawa stanu infrastruktury kolejowej na linii kolejowej nr 714 w km 0,000 - 4,323 w wybranych lokalizacjach wraz z robotami towarzyszącymi; 2. Poprawa parametrów eksploatacyjnych sieci trakcyjnej na linii kolejowej nr 139 odcinek Czechowice Dziedzice - Bielsko-Biała €638,136
- Roboty budowlane - Remont sieci trakcyjnej w dwóch lokalizacjach: 1. Remont sieci trakcyjnej poprawa stanu infrastruktury kolejowej na linii kolejowej nr 714 w km 0,000 - 4,323 w wybranych lokalizacjach wraz z robotami towarzyszącymi; 2. Poprawa parametrów eksploatacyjnych sieci trakcyjnej na linii kolejowej nr 139 odcinek Czechowice Dziedzice - Bielsko-Biała €638,136
- Roboty budowlane - Wymiana szyn z ciągłą wymianą podkładów na odcinku Jabłonowo Pomorskie - Mełno w km 79,085-101,400 linii kolejowej nr 208 Działdowo-Chojnice wraz z robotami towarzyszącymi. €9,241,715
- Construction works - Design documentation and construction works for the modernisation of railway line no. 16 Łęczyca - Kutno €70,213,238
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profilePKP Polskie Linie Kolejowe S.A.
- notices in the register
- 885
- awards
- 237
- awarded in total
- €24.5B
Who wins its contracts
Many suppliers- different companies won its awards
- 137
- of the awards went to the three most frequent winners
- 7%
- of its calls state an estimated value
- 2%
Based on 184 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 4.4
- of those lots received a single tender
- 23%
- of the awards went to companies based in another country
- 3%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Awards most often to
30 open tenders right now
- Architectural, construction, engineering and inspection services - Engineering supervision of executive design and comprehensive construction works on railway lines no. 623 and 628, section Fornale - Szczyrzyc and Porąbka - Stróża, within the project 'Construction of the new railway line Podłęże - Szczyrzyc - Tymbark/Mszana Dolna and modernisation of existing line no. 104 Chabówka - Nowy Sącz - Stage II' 1 day left
- Meeting and conference hotel services: comprehensive hotel, conference and catering services for qualification courses and training of PKP Polskie Linie Kolejowe S.A. staff in 2027-2028 1 day left
- Construction works - Design and execution of works on railway line no. 101 under the project 'Improving the quality and safety of cross-border rail connections through works on line no. 101 in Werchrata and at the railway station in Lviv' 2 days left
Market context
- open now in Construction work
- 19,943
- median open notice
- €533,524
Who wins in this market
Many suppliersPoland · Construction work
- different companies won awards here
- 13,454
- of the awards went to the three most frequent winners
- 2%
- buyers awarded contracts here
- 6,146
Based on 28,089 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 5.0
- of those lots received a single tender
- 12%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 3%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Awarded before
-
Roboty budowlane - Otwarta €37.4M
Never miss a tender like this
2,249 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Construction work: an email when new tenders arrive under it, no account needed.