Open raceNo supplier dominates: 33 different companies have won the last 37 comparable contracts from this buyer over 5 years. This is a genuinely open race.
- Expected final price vs the published estimate
- -29.9%
Based on 37 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryThe contract covers the design and execution of works on Polish railway line no. 101, between km 65.700 and km 69.200 in Werchrata, as part of a project improving the quality and safety of cross-border rail connections with works on line 101 in Werchrata and at the Lviv railway station. The works include design documentation (building design, obtaining building permits and other administrative decisions, detailed design, as-built documentation including surveying records) and construction works covering track surface and subgrade, railway traffic control systems, telecommunications, non-traction power engineering, engineering structures, railway level crossings, surveying, geotechnics, geology, environment and other works such as tree removal, demolitions, pavements and fencing, plus construction of environmental protection facilities. The Functional and Operational Programme (PFU, Volume III) describes the subject in detail.
Description
Can I bid?
- Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
- The notice is written in Polish.
- Certificates from another EU country? Check the equivalents on eCertis
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 day ago
More from this buyer
Full buyer profile29 open tenders right now
- Construction works - Design and execution of works for the task 'Works on the railway line C-E 20 on the section Pilawa - Lukow' 2 days left
- Usługi środowiska naturalnego - Zawarcie Umowy Ramowej dla projektu pn. „Dokumentacja środowiskowa na potrzeby realizowanych inwestycji kolejowych”. 5 days left
- Laptop computers - Purchase of computer sets 6 days left
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| ZUE S.A. | 2 | €927.0M | Jun 2026 |
| TORPOL S.A. | 2 | €850.5M | Apr 2026 |
| DOMOST Sp. z o.o. | 2 | €29.7M | Apr 2026 |
| Przedsiębiorstwo Napraw i Utrzymania Infrastruktury Kolejowej w Krakowie Sp. z o.o.; Trakcja S.A. | 2 | €1.3M | Jul 2026 |
| TRACK TEC CONSTRUCTION Spółka z ograniczoną odpowiedzialnością; INTOP INFRASTRUKTURA Spółka Akcyjna; INTOP Spółka Akcyjna; UNIBEP Spółka Akcyjna; Pomorskie Przedsiębiorstwo Mechaniczno-Torowe Spółka z ograniczoną odpowiedzialnością | 1 | €969.7M | Sep 2026 |
Based on 37 awards with a linked company profile over the last 5 years.
What this buyer has paid before
Based on 57 comparable contracts this buyer awarded in this sector over the last 4 years.
- Lower quartile
- €6.1M
- Median award
- €11.3M
- Upper quartile
- €91.1M
Most recent awards
- Roboty budowlane - „Zaprojektowanie i wykonanie robót w ramach zadania pn.:” Prace na linii kolejowej numer 404 na odcinku Białogard - Kołobrzeg wraz z robotami towarzyszącymi realizowanego w ramach projektu „poprawa bezpieczeństwa i likwidacja zagrożeń eksploatacyjnych na sieci kolejowej -ETAP II” €7,922,984
- Roboty budowlane - Remont sieci trakcyjnej w dwóch lokalizacjach: 1. Remont sieci trakcyjnej poprawa stanu infrastruktury kolejowej na linii kolejowej nr 714 w km 0,000 - 4,323 w wybranych lokalizacjach wraz z robotami towarzyszącymi; 2. Poprawa parametrów eksploatacyjnych sieci trakcyjnej na linii kolejowej nr 139 odcinek Czechowice Dziedzice - Bielsko-Biała €638,136
- Roboty budowlane - Remont sieci trakcyjnej w dwóch lokalizacjach: 1. Remont sieci trakcyjnej poprawa stanu infrastruktury kolejowej na linii kolejowej nr 714 w km 0,000 - 4,323 w wybranych lokalizacjach wraz z robotami towarzyszącymi; 2. Poprawa parametrów eksploatacyjnych sieci trakcyjnej na linii kolejowej nr 139 odcinek Czechowice Dziedzice - Bielsko-Biała €638,136
- Roboty budowlane - Wymiana szyn z ciągłą wymianą podkładów na odcinku Jabłonowo Pomorskie - Mełno w km 79,085-101,400 linii kolejowej nr 208 Działdowo-Chojnice wraz z robotami towarzyszącymi. €9,241,715
- Building works - Development of design documentation and execution of construction works for the task 'Modernisation of section of railway line no. 16 Leczyca - Kutno', part of the project 'Selected works in railway junction areas' €70,213,238
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
Similar tenders
Market context
- Avg. open tender · Construction work
- €32,781,542
- Buyer track record on Aperlena
- 557 notices tracked · 159 awarded
- €18,705,875,384 in awarded contracts
Never miss a tender like this
2,117 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.
Set up my alert