TED - Tenders Electronic Daily (Publications Office of the EU) verified 4 hours ago Contract notice

Norway - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork - Competition - Framework agreement for renovation no-dig, water pipelines including manholes.

Open Norway Trøndelag/Trööndelage Construction work

Buyer Trondheim kommune

41 days left

Key facts

Closes
12:00 (UTC+1)
Estimated value
€55.7M
€55,668,955 · converted from NOK
Competition
Open race
  1. Published
  2. Today
  3. Deadline open for 41 days
  4. Awarded pending

Bidding window

40 days from publication to deadline

Usual length

Notices of this kind (Norway, open procedure, above the EU threshold) give a median of 33 days, half of them between 29 and 38 days, based on 6,992 notices of the last two years.

This buyer usually gives 31 days (median of its last 84 calls for tender).

View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

The Aperlena Verdict

Open race

No supplier dominates: 5 different companies have won the last 6 comparable contracts from this buyer over 5 years. This is a genuinely open race.

Based on 6 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.

Summary

Machine-generated summary

The contracting authority is establishing a framework agreement for the renovation of water pipelines and manholes when using the blocking out method, together with re-connection of private service pipes. Where blocking out cannot be used, traditional trench excavation will be required for a limited amount of renovation work. Controlled drilling, pilot pipe drilling and hose renovation are excluded. Around 3,000 metres of pipeline are planned to be renovated per annum, potentially increasing to 4,000 metres, usually delivered through about two call-offs per year, each bundling several measures. Urgent orders may also arise. The estimated financial framework, including an extension option, is NOK 415 million with a maximum limit of NOK 600 million. The framework agreement runs for 2 + 1 + 1 + 1 + 1 years.

Description

The framework agreement is for the renovation of water pipelines and manholes when blocking out. Controlled drilling, pilot pipe drilling and hose renovation are not included in the framework agreement. The aim of the framework agreement is to cover the need for renovation of water pipelines, where blocking out can be used as a method, as well as renovation of manholes and re-connection of private service pipes. In addition to blocking out, there will be a limited need for renovation by using traditional trench excavation in cases where blocking out cannot be carried out. The contracting authority is planning for two call-offs per annum, with each call-off consisting of packing several measures. The contracting authority plans to renovate approx. 3,000 metres per annum and increase the number of metres during the contract period. The actual extent will vary, however, and the contracting authority is not obligated to the above mentioned estimate. In addition to planned measures, urgent orders may occur. The framework agreement ́s estimated financial framework, including an option for an extension, is NOK 415,000,000,-, while the maximum limit is NOK 600,000,000,-. This is based on a calculation of the estimated price of 3,000 metres per annum, which can be increased to 4,000 metres per annum. The framework agreement period is 2 + 1 + 1 + 1 + 1 years.

Bid or no-bid?

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. In your favour:

    Do we meet every eligibility criterion?

    Open procedure: any interested supplier may submit a bid.

    Above the EU threshold: open to companies from any EU country.

  2. Your call:

    Can we deliver this with the team we have?

    Estimated at €55.7M.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Construction work.

  4. In your favour:

    Is the deadline realistic for a proper offer?

    41 days left, 29 of them working days.

  5. Your call:

    Is there a margin at the likely winning price?

    This buyer usually awards this kind of contract for between €5.5M and €25.6M.

  6. In your favour:

    Do we know this buyer?

    5 different companies won the last 6 comparable contracts.

Can I bid?

  • Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
  • Certificates from another EU country? Check the equivalents on eCertis

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 4 hours ago

Expected award price

likely award for this notice, from its published estimate of €55,668,955
€44.0M to €57.9M

Comparable awards in this country and sector came in at a median of 89% of their published estimate, half of them between 79% and 104%, based on 55 awards of the last 3 years.

Each award is compared with the estimate of the same lots, framework agreements excluded. A published estimate may include options and renewals, so an award under it is not always a discount.

What this buyer has paid before

Based on 5 comparable contracts this buyer awarded in this sector over the last 4 years.

This notice
€55.7M
Median award
€12.6M
Middle half of past awards
€5.5M to €25.6M

The estimate is larger than three in four past awards.

Most recent awards

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Trondheim kommune

Norway

notices in the register
161
awards
32
awarded in total
€97.1M

Who wins its contracts

Many suppliers
different companies won its awards
20
of the awards went to the three most frequent winners
23%
of its calls state an estimated value
74%

Based on 22 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
4.7
of those lots received a single tender
8%
of the awards went to companies based in another country
6%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Who usually wins this buyer's contracts in this sector

Company Wins Total awarded Last win
Søbstad AS 2 €33.6M Aug 2026
HENT AS 1 €25.6M Apr 2026
Solberg Maskin AS 1 €12.6M Feb 2026
Dovre Entreprenør AS 1 €5.5M Sep 2026
NCC Industry AS (hovedenhet) 1 Feb 2026

Based on 6 awards with a linked company profile over the last 5 years.

27 open tenders right now

Market context

Larger than 93% of the open notices in Construction work across Europe.

open now in Construction work
29,149
median open notice
€850,000

Who wins in this market

Many suppliers

Norway · Construction work

different companies won awards here
234
of the awards went to the three most frequent winners
9%
buyers awarded contracts here
105

Based on 336 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
4.0
of those lots received a single tender
8%
of the awards went to companies based in another country
1%
of the tenders came from another country
0%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

610 new notices in Construction work in Norway in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

41 days left

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language