TED - Tenders Electronic Daily (Publications Office of the EU) verified 1 week ago Contract notice

Germany - Services of architecture, engineering and testing offices - New central hospital, phase 2 medical technology planning

Original Deutschland - Dienstleistungen von Architektur-, Konstruktions- und Ingenieurbüros und Prüfstellen - Neubau Zentralklinikum - 2. Bauabschnitt Medizintechnikplanung

Closed Germany Köln Architecture & engineering services

Buyer Universitätsklinikum Bonn AöR

Key facts

Published
Procedure
Negotiated procedure
  1. Published
View the official notice Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

Summary

Machine-generated summary

University Hospital Bonn (UKB) is procuring specialist technical planning services for medical technology, cost groups 473 and 620, for phase 2 of its new central hospital on the Venusberg campus. The project is a replacement building for the surgical centre (B 22) with about 17,789 m2 of usable floor area, comprising 21 operating theatres, 48 intensive care beds, 130 general care beds, outpatient and doctor service areas, and an extension of central radiology (CT/MRI). The structure includes a ground floor, four upper floors and one basement. The construction cost ceiling is 235 million euros, with at least 10 percent better energy efficiency than the nearly zero-energy building standard, BNB Silver certification, and BIM-based planning coordinated by the object planner.

Description

Neubau Zentralklinikum 2. BA - Universitätsklinikum Bonn (UKB) Das UKB erstreckt sich auf 43 ha auf dem Venusberg und besitzt einen campusartigen Charakter. Im Zentrum des Campus entsteht das neue Zentralklinikum, bestehend aus dem bereits im Bau befindlichen Herzzentrum (1. BA) und dem 2. Bauabschnitt (Operatives Zentrum B 22). Projektumfang Ersatzneubau für das Operative Zentrum (B 22) auf dem Baufeld des heutigen B 26 (vorheriger Rückbau erforderlich). Nutzfläche: 17.789 m² Hauptfunktionen: Zentral-OP (21 OP-Säle) Intensivpflege (48 Betten) Allgemeinpflege (130 Betten) Ambulanz & Arztdienstflächen Erweiterung der zentralen Radiologie (CT/MRT) Gebäudestruktur: EG, 4 OG, 1 UG KO-Kriterien für die Planung Kostenobergrenze: Die Baukosten (KG 100-600) sind auf maximal 235 Mio. Euro festgelegt. Diese Obergrenze ist zwingend einzuhalten, da die Finanzierung sonst nicht gesichert ist. Nachhaltigkeit & Energieeffizienz: Mindestens 10 % bessere Energieeffizienz als Niedrigstenergiegebäude-Standard. BNB-Zertifizierung mindestens "Silber". BIM-Planungsmethode: Das gesamte Bauvorhaben wird nach der BIM-Methode geplant. Die BIM-Gesamtkoordination liegt bei der Objektplanung. Die hier ausgeschriebene Planungsaufgabe besteht aus der Fachplanung der technischen Ausrüstung für die Medizintechnik KG 473 und KG 620 für den Neubau Zentralklinikum 2. Bauabschnitt. Näher Angaben zu den Anforderungen an das zu planende Gebäude können dem Raum- und Funktionsprogramm mitsamt Erläuterungsbericht entnommen werden. Das gesamte Projektteam bestehend aus Objektplanung und spezifischen Fachplanungen wird koordiniert durch die Objektplanung (Architekt). Ergänzend beauftragt der AG eine Projektsteuerung. Zeitplan Planungsbeginn: Oktober 2025 Vorplanung: Q4/Q1 2025/2026 Entwurfsplanung: Q1/Q3 2026 Einreichung HU-Bau: September 2026 Bauantrag: Oktober 2026 Abbruch B 26: Mitte-Ende 2027 Baubeginn: Anfang 2028 Vergabe & Beauftragung Das beauftragte Planungsunternehmen soll unmittelbar nach Vergabe starten. Der Auftraggeber plant eine stufenweise Beauftragung mit fünf Leistungsstufen: LS 1: LPh 1-2 LS 2: LPh 3-4 LS 3: LPh 5 LS 4: LPh 6-7 LS 5: LPh 8 Das gesamte Projektteam wird durch die Objektplanung koordiniert. Ergänzend wird eine Projektsteuerung beauftragt.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 week ago

Universitätsklinikum Bonn AöR

Germany

notices in the register
206
awards
53
awarded in total
€18.7M

Who wins its contracts

Many suppliers
different companies won its awards
36
of the awards went to the three most frequent winners
15%
of its calls state an estimated value
17%

Based on 40 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.3
of those lots received a single tender
8%
of the awards went to companies based in another country
0%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Awards most often to

  1. Münch GmbH 2 awards €399,452
  2. Datennetzbau Theurich 2 awards €231,622
  3. SVA System Vertrieb Alexander GmbH 2 awards

10 open tenders right now

Market context

open now in Architecture & engineering services
7,713
median open notice
€300,000

Who wins in this market

Many suppliers

Germany · Architecture & engineering services

different companies won awards here
6,874
of the awards went to the three most frequent winners
3%
buyers awarded contracts here
3,470

Based on 12,481 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.5
of those lots received a single tender
11%
of the awards went to companies based in another country
1%
of the tenders came from another country
5%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

539 new notices in Architecture & engineering services in Germany in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Architectural, construction, engineering and inspection services: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language