Zum Inhalt springen
Aperlena

Rotherham Gateway Multi-Disciplinary Consultancy Support

Vergeben Vergabebekanntmachung
Ausschreibung beobachten

Wir mailen Ihnen, wenn sich die Frist ändert oder eine Berichtigung erscheint. Kostenlos. Anmelden

  1. Frist
  2. Vergeben Entscheidung in 2 Tagen
  3. Veröffentlicht

Beschreibung

The Rotherham Gateway project is a multi-phased scheme to bring mainline rail services back to the Borough. Alongside the transport elements which also includes a new tram/train stop the scheme also delivers 300 new homes and an industry ecosystem, similar to the Advanced Manufacturing Park, associated car parking and public realm. The scheme can be considered in phases: • Phase 1 - mainline station and tram train plus catalyst station building, public realm and car parking • Phase 1a - Effingham St corridor, active travel scheme, masterplan & outputs • Phase 2 & 3 Innovation Gateway • Phase 4 Residential Quarter Phase 1 is moving into FBC and therefore the priority for this commission alongside Phase 1a which is essential to connect the Gateway site to the town centre. The remaining phases will be brought forward as funding and acquisition opportunities become available. The Council are seeking a Multi-Disciplinary team to support this phased programme of work for just over a 3-year period (with appropriate options to extend). Consultants are expected to provide the following services: • Lead Consultant • Programme Director • Programme Management Office • Project Management • Architectural, Design and Masterplanning The Multi-Disciplinary consultancy will also provide: • Cost Consultancy • Construction Design & Management role • Technical and Site Investigation Phased Approach Due to the complex nature of the project requirements the appointment and contractual arrangements will be undertaken in two stages. Stage 1 - the first stage will involve the establishment of the core team. This will include Lead Consultant, Programme Director, PMO and Project Management support for the progression of the Effingham St Active Travel corridor. During Stage 1, preparations will be made to form the requirements for Stage 2. Stage 1 is expected to last for 8 weeks and move seamlessly, subject to a satisfactory proposal received into Stage 2. Stage 2 - will form the main body of the commission. Due to the complexity of the Gateway project the full requirements of this stage will evolve over the lifetime of the project but will be limited to the services described above. The Stage 1 works are awarded at a cost of £138,370.92 with a total estimated contract value across both stages of £3,138,370 (all figures quoted as net). The end date stated of 02/10/2026 is only to the completion of stage 1. This award was undertaken as a direct award via Lot 1 (Built Environment Consultancy) of the SCAPE Consultancy framework.

Amtliche Quelle

Quelle: Contracts Finder (UK Cabinet Office)

Prüfen Sie alle Angaben stets in der amtlichen Bekanntmachung.

Zuletzt mit Contracts Finder (UK Cabinet Office) abgeglichen vor 3 Wochen

Unterlagen auf Contracts Finder (UK Cabinet Office) (Englisch)

Mehr von diesem Auftraggeber

Vollständiges Auftraggeberprofil

Jüngste Vergaben

Ähnliche Ausschreibungen

Marktkontext

Ø offene Ausschreibung · Architektur- & Ingenieurdienste
9.179.097 €
14.875 aktuell offen in Europa 60% unter dem Branchenschnitt
Vergabehistorie auf Aperlena
7 erfasste Bekanntmachungen · 7 vergeben
496.403 € vergebenes Volumen

Verpassen Sie keine Ausschreibung wie diese

Erhalten Sie eine E-Mail zu neuen Ausschreibungen: Architektur- & Ingenieurdienste · Vereinigtes Königreich. Kostenlos.

Benachrichtigung einrichten