Zum Inhalt springen
Aperlena

Digarbon Contractor (Main Contract)

Vergeben Vergabebekanntmachung Keine Frist veröffentlicht
Ausschreibung beobachten

Wir mailen Ihnen, wenn sich die Frist ändert oder eine Berichtigung erscheint. Kostenlos. Anmelden

  1. Vergeben
  2. Veröffentlicht

Beschreibung

The appointment of a contractor to complete the retrofit of the Law (LAWPL) and Tower (PSYCH) 1/6 https://www.find-tender.service.gov.uk/Notice/011462-2026?origin=Dashboard 2/9/26, 3:09 PM Digarbon Contractor (PCSA) - Find a Tender origin=Dashboard#con tract_0) Information about tenders (https://www.find tender.service.gov.uk/ Notice/011462-2026? origin=Dashboard#mai n_heading_anchor_2) Submission (https://www.find tender.service.gov.uk/ Notice/011462-2026? origin=Dashboard#mai n_heading_anchor_3) Procedure (https://www.find tender.service.gov.uk/ Notice/011462-2026? origin=Dashboard#mai n_heading_anchor_4) Supplier (https://www.find tender.service.gov.uk/ Notice/011462-2026? origin=Dashboard#mai n_heading_anchor_5) Contracting authority (https://www.find tender.service.gov.uk/ Notice/011462-2026? origin=Dashboard#mai n_heading_anchor_6) Download PDF version (/Notice/011462 2026/PDF) OCDS release (/Notice/011462 2026/OCDS/ReleasePack age) OCDS record (/Notice/011462 2026/OCDS/Record) Report concerns about this procurement buildings. Scope of works required at Law Building include: • Asbestos Removals. • Replacement of existing flat roof systems on both the main section of the building (including the lift motor/plant room) and the lower-level extension built in the 1990s. To facilitate these works roof top PV cells and MEP systems will need to be removed and re-installed (including recommissioning). • Removal of all existing windows and curtain walling (frames & windows) and replacement with new double-glazed units and associated making good (except for the existing double glazed units on the ground floor of the 1990's courtyard extension). • FF&E - installation of new replacement windows blinds. Scope of works required at Tower Building included: • Asbestos removals. • Replacement of existing flat roof systems on the no.2 lower-level extensions only (not including the main roof which has recently been replaced). To facilitate these works roof top MEP systems will need to be removed and re-installed (including recommissioning). • Removal of all existing windows and curtain walling (frames & windows) and replacement with new double-glazed units and associated making good (except for the windows in the extension built in 2008 which are to be retained). • FF&E - installation of new replacement windows blinds. • Implementation of plans for phasing, sequencing and building user decanting to deliver the works. Stage 2 appointment - The Award of the Main Contract following stage 1 appoint (PCSA)

Amtliche Quelle

Quelle: Find a Tender Service (UK Cabinet Office / Crown Commercial Service)

Prüfen Sie alle Angaben stets in der amtlichen Bekanntmachung.

Zuletzt mit Find a Tender Service (UK Cabinet Office / Crown Commercial Service) abgeglichen vor 2 Stunden

Unterlagen auf Find a Tender Service (UK Cabinet Office / Crown Commercial Service) (Englisch)

Mehr von diesem Auftraggeber

Vollständiges Auftraggeberprofil

1 offene Ausschreibung derzeit

Jüngste Vergaben

Ähnliche Ausschreibungen

Marktkontext

Vergabehistorie auf Aperlena
15 erfasste Bekanntmachungen · 10 vergeben

Verpassen Sie keine Ausschreibung wie diese

Erhalten Sie eine E-Mail zu neuen Ausschreibungen: Vereinigtes Königreich. Kostenlos.

Benachrichtigung einrichten