Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 3 hours ago Contract notice

Romania - Motorway and road construction works - DESIGN AND EXECUTION 'Craiova - Filiasi Motorway and Filiasi - Targu Jiu Express Road, Lot 4'

Original România - Lucrări de construcţii de autostrăzi şi de drumuri - PROIECTARE SI EXECUTIE “Autostrada Craiova - Filiasi si Drum Expres Filiasi - Targu Jiu - Lotul 4”

Open Romania Bucureşti-Ilfov Construction work

Buyer COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.

19 days left

Key facts

Closes
15:00 (UTC+2)
Estimated value
€465.9M
€465,861,192 · converted from RON
Competition
Open race
  1. Published
  2. Today
  3. Deadline open for 21 days
  4. Awarded pending

Bidding window

20 days from publication to deadline

Shorter than usual

Notices of this kind (Romania, open procedure, above the EU threshold) give a median of 33 days, half of them between 22 and 35 days, based on 15,695 notices of the last two years. Fewer days than three in four comparable notices. Check the documents early and ask questions before the clarification deadline.

This buyer usually gives 22 days (median of its last 579 calls for tender).

View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

The Aperlena Verdict

Open race

No supplier dominates: 95 different companies have won the last 160 comparable contracts from this buyer over 5 years. This is a genuinely open race.

Based on 160 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.

Summary

Machine-generated summary

The contract covers the design and execution of Lot 4 of the investment project 'Craiova - Filiasi Motorway and Filiasi - Targu Jiu Express Road' in Romania. The lot is approximately 22.925 km long, of which 5.103 km is built to motorway standard and 17.822 km to express road standard, in accordance with the works contract. Under Law no. 98/2016, interested economic operators may request clarifications on the award documentation up to 25 days before the bid submission deadline, with the contracting authority responding to all such requests 12 days before that deadline. Possible contract modifications during execution follow Government Decision no. 1/2018 and may include changes of the contracting parties, including replacement of the contractor.

Description

Obiectul contractului il reprezinta proiectarea si executia Lotului 4 al obiectivului de investitii „Autostrada Craiova - Filiasi si Drum Expres Filiasi - Targu Jiu”, in lungime de aproximativ 22,925 km, din care 5,103 km la profil de Autostrada si 17,822 km la profil de Drum Expres, in conformitate cu prevederile contractului de lucrari. In conformitate cu prevederile art. 160 alin. (1) din Legea nr. 98/2016 cu modificarile si completarile ulterioare, termenul limita pana la care orice operator economic interesat de participarea la procedura de achizitie publica are dreptul de a solicita clarificari sau informatii suplimentare in legatura cu documentatia de atribuire este cu 25 zile inainte de termenul limita de depunere a ofertelor. In conformitate cu prevederile art. 160 alin. (2) din Legea 98/2016 cu modificarile si completarile ulterioare, Autoritatea Contractanta stabileste un singur termen limita in care va raspunde tuturor solicitarilor de clarificare/ informatiilor suplimentare, dupa cum urmeaza: cu 12 zile inainte de termenul limita de depunere a ofertelor. Termenul de raspuns la clarificari a fost stabilit astfel incat operatorii economici sa aiba o perioada adecvata pentru analizarea documentatiei de atribuire si, ulterior, pentru elaborarea ofertelor prin prisma raspunsurilor oferite de Autoritatea Contractanta. Obiectul contractului il reprezinta proiectarea si executia Lotului 4 al obiectivului de investitii „Autostrada Craiova - Filiasi si Drum Expres Filiasi - Targu Jiu”, in lungime de aproximativ 22,925 km, din care 5,103 km la profil de Autostrada si 17,822 km la profil de Drum Expres, in conformitate cu prevederile contractului de lucrari. In conformitate cu prevederile contractuale, respectiv ale H.G. nr.1/2018, eventualele modificari care pot interveni in perioada de derulare a contractului, se refera la urmatoarele, fara a se limita la acestea: 1. Modificari ale partilor contractante, inclusiv inlocuirea contractantului cu un nou contractant in conditiile prevazute la art. 221 alin. (1) lit. d), punctul (ii); 2. Schimbarea denumirii si/sau a formei societatii, schimbari care nu atrag crearea unei persoane juridice noi; 3. Modificari care rezulta din adaptarea Proiectului Tehnic de Execuție la realitatea din teren, inclusiv schimbări de soluții tehnice punctuale; 4. Modificari care rezulta din modificări/adaptări ale cotelor, pozițiilor și/ sau dimensiunilor unor lucrari ca urmare a situatiei din teren; 5. Modificari generate de cerinte ale autoritatilor de mediu; 6. Modificari care rezulta din necesitatea mutarii/stramutarii unor obiecte aflate pe/in sol/subsol; 7. Modificari generate de includerea de noi subcontractanti/ furnizori/ subcontractanții subcontractanților/ orice alți operatori economici si/sau generate de inlocuirea subcontractantilor/ furnizorilor/ subcontractanții subcontractanților/ orice alți operatori economici initiali, care se vor realiza conform clauzei corespunzatoare din Conditiile Generale ale Contractului; 8. Modificari generate de schimbarea personalului cheie/alt personal, care se vor realiza conform clauzei corespunzatoare din Conditiile Generale ale Contractului; 9. Modificari ale culoarului/coridorului de expropriere care conduc la necesitatea realizarii de lucrari suplimentare si/sau la renuntarea realizarii unor lucrari existente in Contract; 10. Modificari generate de acorduri, conventii, intelegeri ale statului/autoritatilor locale cu alte state; 11. Modificari legislative sau de norme tehnice/ stasuri/ normative/ standarde, pe parcursul derularii contractului, care se vor realiza conform clauzei corespunzatoare din Conditiile Generale ale Contractului, cu respectarea prevederilor art. 221 din Legea nr. 98/2016, cu modificarile si completarile ulterioare; 12. Prelungirea Duratei de Executie in baza mecanismului contractual prevazut la Clauza 35 [Prelungirea Duratei de Execuţie] din Conditiile Generale fara a se aduce atingere dreptului Beneficiarului de a aplica Antreprenorului penalitatile si/sau sanctiunile prevazute in contract; 13. Modificari care rezulta din implementarea solicitarilor provenite de la diverse institutii/autoritati/entitati care au atributii in legatura cu obiectivul de investitie (de exemplu: Ministere, JASPERS, Autoritati/Institutii centrale si/sau locale, Verificatori atestati, organisme de control, etc.). 14. Modificari care rezulta din descarcarea de sarcini arheologice. 15. Modificari generate de modificari ale terenului, retelei hidrografice supraterane si subterane necunoscute la data elaborarii Proiectului Tehnic de Execuție; Modificarile vor fi realizate ulterior semnarii contractului, in conformitate cu prevederile contractuale, numai in conditiile in care acestea nu reprezinta modificari substantiale in sensul prevederilor art. 221 alin. (7) din Legea nr. 98/2016. Prelungirea Duratei de Executie se va realiza in conformitate cu prevederile Clauzei 35 [Prelungirea Duratei de Executie] din Conditiile Generale. Mai multe informatii se regasesc in Contract.

Bid or no-bid?

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. In your favour:

    Do we meet every eligibility criterion?

    Open procedure: any interested supplier may submit a bid.

    Above the EU threshold: open to companies from any EU country.

  2. Your call:

    Can we deliver this with the team we have?

    Estimated at €465.9M.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Construction work.

  4. In your favour:

    Is the deadline realistic for a proper offer?

    19 days left, 14 of them working days.

  5. Check this first:

    Is there a margin at the likely winning price?

    This buyer usually awards this kind of contract for between €867,747 and €5.4M.

    Contracts here close a median of 84.2% below their estimate.

  6. In your favour:

    Do we know this buyer?

    95 different companies won the last 160 comparable contracts.

Can I bid?

  • Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
  • The notice is written in Romanian.
  • Certificates from another EU country? Check the equivalents on eCertis

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 3 hours ago

Expected award price

likely award for this notice, from its published estimate of €465,861,192
€335.4M to €414.6M

This buyer's comparable awards in this sector came in at a median of 79% of their published estimate, half of them between 72% and 89%, based on 9 awards of the last 3 years.

Each award is compared with the estimate of the same lots, framework agreements excluded. A published estimate may include options and renewals, so an award under it is not always a discount.

What this buyer has paid before

Based on 149 comparable contracts this buyer awarded in this sector over the last 4 years.

This notice
€465.9M
Median award
€2.6M
Middle half of past awards
€867,747 to €5.4M

The estimate is larger than three in four past awards.

Most recent awards

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.

Romania

notices in the register
1,324
awards
536
awarded in total
€7.5B

Who wins its contracts

Many suppliers
different companies won its awards
233
of the awards went to the three most frequent winners
9%
of its calls state an estimated value
85%

Based on 515 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
2.8
of those lots received a single tender
25%
of the awards went to companies based in another country
1%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Who usually wins this buyer's contracts in this sector

Company Wins Total awarded Last win
OYL COMPANY HOLDING AG S.R.L. 12 €29.0M Oct 2026
PORR CONSTRUCT 7 €24.1M Dec 2025
OYL COMPANY HOLDING AG S.R.L.; AUTOPRIMA SERV S.R.L. 6 €17.6M Sep 2026
INVENT TRUST 5 €488,196 Sep 2026
RAD-TRANS; EKY-SAM 4 €11.1M May 2026

Based on 160 awards with a linked company profile over the last 5 years.

23 open tenders right now

Market context

Larger than 98% of the open notices in Construction work across Europe.

open now in Construction work
28,831
median open notice
€853,188

Who wins in this market

Many suppliers

Romania · Construction work

different companies won awards here
1,155
of the awards went to the three most frequent winners
6%
buyers awarded contracts here
404

Based on 1,663 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
3.5
of those lots received a single tender
19%
of the awards went to companies based in another country
2%
of the tenders came from another country
8%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

2,993 new notices in Construction work in Romania in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

19 days left

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language