Romania - High voltage installations - Construction of a 110 kV overhead power line between the 110/6 kV Medgidia Nord substation and the 400/110 kV Medgidia Sud substation

Original România - Instalaţii de înaltă tensiune - Constructie LES 110 kV între statia electrică de transformare 110/6 kV Medgidia Nord si statia electrică de transformare 400/110 kV Medgidia Sud

Open Romania Sud-Est Construction work

Buyer RETELE ELECTRICE ROMANIA S.A.

33 days left

Key facts

Closes
15:00 (UTC+2)
Estimated value
€9.7M
€9,726,642 · converted from RON
Procedure
Open procedure
  1. Published
  2. Today
  3. Deadline open for 36 days
  4. Awarded pending

Bidding window

35 days from publication to deadline

Usual length

Notices of this kind (Romania, open procedure, above the EU threshold) give a median of 33 days, half of them between 22 and 35 days, based on 15,695 notices of the last two years.

This buyer usually gives 32 days (median of its last 76 calls for tender).

View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

Summary

Machine-generated summary

The contract covers construction works for a new 110 kV overhead power line, 8.4 km long, between the 110/6 kV Medgidia Nord substation and the 400/110 kV Medgidia Sud substation. The works aim to strengthen the existing electricity network owned by the network operator upstream of the connection point and to reinforce the 110 kV RET in the RER area to meet the N-1 criterion with one element out of service. Medgidia Nord, located in Constanta County, is managed by Retele Electrice Romania SA and is an outdoor type substation; Medgidia Sud is managed by the transmission operator CN Transelectrica. Works take place within the Medgidia Nord substation and in the intra-urban and extra-urban area of Medgidia, mostly on non-carriageway public domain.

Description

Sunt necesare lucrări pentru întărirea rețelei electrice existente deținute de operatorul de rețea în amonte de punctul de racordare și pentru realizarea lucrărilor de întărire cu caracter general pentru respectarea criteriului cu N-1 elemente în funcțiune în RED 110 kV din zona RER, se va construi o LES nouă 110 kV intre stațiile Medgidia Nord-Medgidia Sud, în lungime de 8,4km. Stația electrică de transformare 110/6 kV Medgidia Nord se află în gestiunea Rețele Electrice Romania SA. Stația de transformare 400/110 kV Medgidia Sud se află în gestiunea Operatorului de Transport CN Transelectrica. Stația electrică de transformare 110/6 kV Medgidia Nord, la nivel tensiune 110 kV este de tip exterior, cu echipament montat la semiînălțime, cu suporți pentru echipamente. Stația a fost dimensionată pentru plafonul de scurtcircuit de: 6000 MVA pe partea de 110 kV. Stația electrică de transformare 110/6 kV Medgidia Nord este amplasată în Județul Constanța, în intravilanul și extravilanul orașului Medgidia. Lucrările se vor executa în incinta stației electrice de transformare Medgidia Nord precum și în zona extravilan și intravilan a orașului Medgidia, în cea mai mare parte domeniul public necarosabil și pe alocuri în zona carosabilă a orașului. Operatorii economici interesați pot solicita clarificări sau informații suplimentare până cel târziu în a 20-a zi înainte de termenul limită de depunere a solicitărilor de participare/ofertelor, iar Entitatea Contractanta va raspunde in mod clar si complet tuturor solicitarilor de clarificari adresate de operatorii economici până la termenul-limită stabilit - conform art. 29 alin. (3) din HG 394/2016. Entitatea contractantă își rezervă dreptul de a transmite două răspunsuri consolidate, în conformitate cu prevederile art. 172 alin. (2) și art. 173 alin. (1) din Legea nr. 99/2016, după cum urmează: - un prim răspuns consolidat, transmis cel tarziu în a 11-a zi înainte de data-limită inițială de depunere a ofertelor; - un al doilea răspuns consolidat, transmis cel tarziu în a 11-a zi înainte de data-limită modificată de depunere a ofertelor, în situația în care termenul de depunere a ofertelor este prelungit, în condițiile art. 163 din Legea nr. 99/2016. Entitatea contractanta va raspunde doar la solicitarile de clarificari adresate de operatorii economici pana la termenul-limita stabilit, conform art. 29 alin. (3) din HG 394/2016. Valoarea estimata a contractului este de: 52.025.864,98 RON si nu include cheltuieli diverse și neprevăzute (in procent de 4,509908%). Pentru întărirea rețelei de distribuție a energiei electrice din zona Dobrogea, pentru asigurarea evacuării energiei produsă din surse regenerabile, este necesară o nouă linie electrică, în cablu 110 kV de racordare la SEN a rețelei de distribuție. Noua linie electrică se va realiza între 2 stații electrice de transformare, respectiv, stația de transformare 110/6 kV Medgidia Nord și stația de transformare 400/110 kV Medgidia Sud. Pentru realizarea obiectivului se propun următoarele lucrări, structurate, după cum urmează: - Construire Celulă 110 kV în Stația de Transformare 110/6 kV Medgidia Nord; - Construire Linie Electrică în cablu Subteran 110 kV între Stația de Transformare 110/6 kV Medgidia Nord și Stația de Transformare 400/100 kV Medgidia Sud; Având în vedere scopul acestei noi linii electrice, în conformitate cu cerințele precizate în Studiul de Soluție și Avizul Tehnic de Racordare, s-a proiectat o linie electrică în cablu cu o capacitate de transport de 800 A. Linia electrică în cablu LES 110 kV Medgidia Nord - Medgidia Sud va fi o linie de buclă a Sistemului Energetic, racordată în ambele capete prin celule de comandă și control precum și dispozitive digitale pentru două grupe de protecție.

Bid or no-bid?

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. In your favour:

    Do we meet every eligibility criterion?

    Open procedure: any interested supplier may submit a bid.

    Above the EU threshold: open to companies from any EU country.

  2. Your call:

    Can we deliver this with the team we have?

    Estimated at €9.7M.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Construction work.

  4. In your favour:

    Is the deadline realistic for a proper offer?

    33 days left, 24 of them working days.

  5. Your call:

    Is there a margin at the likely winning price?

    In this country this kind of contract is usually awarded for between €1.9M and €11.3M.

  6. Your call:

    Do we know this buyer?

    The buyer has 168 notices in the register and no pattern of winners yet.

Can I bid?

  • Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
  • The notice is written in Romanian.
  • Certificates from another EU country? Check the equivalents on eCertis

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 10 hours ago

Expected award price

likely award for this notice, from its published estimate of €9,726,642
€8.0M to €9.5M

Comparable awards in this country and sector came in at a median of 90% of their published estimate, half of them between 82% and 98%, based on 346 awards of the last 3 years.

Each award is compared with the estimate of the same lots, framework agreements excluded. A published estimate may include options and renewals, so an award under it is not always a discount.

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 1,580 awards for Construction work in Romania.

This notice
€9.7M
Median award
€5.5M
Middle half of past awards
€1.9M to €11.3M

The estimate sits inside the usual range.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

RETELE ELECTRICE ROMANIA S.A.

Romania

notices in the register
168
awards
53
awarded in total
€28.3M

Who wins its contracts

Many suppliers
different companies won its awards
40
of the awards went to the three most frequent winners
12%
of its calls state an estimated value
42%

Based on 42 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
2.2
of those lots received a single tender
24%
of the awards went to companies based in another country
18%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

This buyer has no award history in this sector yet. Usual winners, Construction work - Romania

Company Wins Total awarded Last win
AG SERV CONSTRUCT 37 €241.0M Oct 2026
PORR CONSTRUCT 33 €2.5B Sep 2026
Ascendent 23 €52.6M Oct 2026
MEGA EDIL 20 €35.0M Sep 2026
OYL COMPANY HOLDING AG S.R.L. 14 €89.5M Oct 2026

Based on 1663 awards with a linked company profile over the last 2 years.

40 open tenders right now

Market context

Larger than 78% of the open notices in Construction work across Europe.

open now in Construction work
28,831
median open notice
€853,188

Who wins in this market

Many suppliers

Romania · Construction work

different companies won awards here
1,155
of the awards went to the three most frequent winners
6%
buyers awarded contracts here
404

Based on 1,663 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
3.5
of those lots received a single tender
19%
of the awards went to companies based in another country
2%
of the tenders came from another country
8%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

2,993 new notices in Construction work in Romania in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

33 days left

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language