Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 3 days ago Contract notice

Romania - Solar installation - Supply, assembly, installation, testing and commissioning of the photovoltaic system for the project 'IMPLEMENTATION OF A NEW ELECTRICITY PRODUCTION CAPACITY FROM RENEWABLE SOURCES CEF 300KW - VALEA IAȘULUI, ARGEȘ COUNTY'

Original România - Instalaţie solară - Furnizare, montare, instalare, testare și punere în funcțiune a sistemului fotovoltaic aferent obiectivului „IMPLEMENTAREA UNEI NOI CAPACITĂȚI DE PRODUCȚIE DE ENERGIE ELECTRICĂ DIN SURSE REGENERABILE CEF 300KW-LOCALITATEA VALEA IAȘULUI, JUDEȚUL ARGEȘ’’

Open Romania Sud-Muntenia Petroleum, fuel & energy

Buyer COMUNA VALEA IASULUI (PRIMARIA COMUNEI VALEA IASULUI)

10 days left

Key facts

Closes
15:00 (UTC+3)
Estimated value
€214,637
converted from RON
Procedure
Open procedure
  1. Published
  2. Today
  3. Deadline open for 33 days
  4. Awarded pending

Bidding window

32 days from publication to deadline

Usual length

Notices of this kind (Romania, open procedure, above the EU threshold) give a median of 32 days, half of them between 22 and 35 days, based on 15,933 notices of the last two years.

View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

Summary

Machine-generated summary

The contract covers the supply, assembly, installation, testing and commissioning of a photovoltaic system in Valea Iașului, Argeș County, Romania. The system will consist of 480 photovoltaic panels, each with a nominal power of 625 W, mounted on a metal structure anchored in the ground and oriented to maximise solar radiation capture throughout the day. The total installed power at panel level will be 300.0 kWp. Three high-efficiency inverters of 100 kW each will convert the direct current produced into alternating current, giving 300.0 kW at inverter level. The smart inverters will monitor key system parameters and support safe, durable and economical operation.

Description

Sistemul fotovoltaic va fi compus din dintr-un total de 480 de panouri fotovoltaice, fiecare avand o putere nominala de 625W(watt). Panourile vor fi amplasate pe o strctura metalica ancorata in sol, orientate astfel incat sa maximizeze captarea radiatiei solare de-a lungul intregi zile. Configuratia aleasa asigrua o eficienta ridicata de conversie a energiei solare in energie electrica si o durabilitate crescuta in timp, panourile fiind proiectate sa reziste la conditii climatice diverse. Puterea instalata totala la nivelul campului fotovoltaic(nivelul panourilor) va fi de 300.0 kWp(kilowatt-peak), ceea ce reflecta capacitatea maxima de generare a energiei electrice in conditii standard de testare (STC). Pentru conversia energiei produse in curent continuu de catre panouri in curent alteranativ utilizabil in retea sau pentru autoconsum, sistemul va fi dotat cu trei(trei) invertoare de inalta eficienta, cu o putere de 100 kW. Prin urmare, puterea instalata totala la nivelul sistemului de invertoare va fi de 300.0kW, ceea ce asigura o capacitate adecvata de preluare si conversie a energiei generate de campul fotovoltaic, cu o rezerva tehnica ce permite operarea in conditii de varf si optimizarea perfomantei generale a centralei. Sistemul a fost proiectat astfel incat sa permita o integrare facila in reteaua electrica locala sis a sustina nevoile de autoconsum ale infrastructurii comunitare. Alegerea componentelor tehnice s-a realizat in baza unei analize de fezabilitate energetica si economica, luand in calcul specificul climatic al zonei, conditiile de radiatie solara, precum si obiectivul de eficienta maxima in exploatare. Aceasta configuratie tehnica va permite nu doar producerea constanta de energie verde, ci si un control eficient al fluxului energetic, prin intermediul invertoarelor inteligente, care monitorizeaza parametrii esentiali ai sistemului si contribuire la o funcionare sigura, durabila si economica a centralei electrice fotovoltaice. Evacuarea energiei electrice produse de centrala fotovoltaica se va realiza printr-un punct de racordare la reteaua electrica stabilit la nivelul de tensiune 20kV, in celula de linie 20 kV prevazuta in PC 20kV CEF Valea Iasului. Aceasta solutie tehnica a fost aprobata prin ATR nr.001500044662/29.04.2025. Lucrarile pentru realizarea instalatiei de racordare din avizului tehnic de racordare se realizeaza in cadrul altui proiect. Se vor respecta cerintele din PT. Capitolul bugetar din cadrul proiectului VALOARE (fără TV..A.) 4.1. Construcții și instalații 413.382,81 4.2. Montaj utilaje, echipamente tehnologice și functionale 154.667,19 4.3. Utilaje, echipamente tehnologice și funcționale cu montaj 561.950,00 TOTAL 1.130.000,00

Terms of the procedure

How tenders are scored
Pretul ofertei: 40 percent; Perioada de garanție de funcționare a panourilor dată de producător (de la data PIF conform garanției producătorului) - P2: 20 percent; Perioada de garanție acordată investiției - P3: 20 percent; Eficiența panourilor fotovoltaice - P4: 20 percent
Tenders go to
e-licitatie.ro

As the official notice states them.

Bid or no-bid?

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. In your favour:

    Do we meet every eligibility criterion?

    Open procedure: any interested supplier may submit a bid.

    Above the EU threshold: open to companies from any EU country.

  2. Your call:

    Can we deliver this with the team we have?

    Estimated at €214,637.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Petroleum, fuel & energy.

  4. In your favour:

    Is the deadline realistic for a proper offer?

    10 days left, 8 of them working days.

  5. Your call:

    Is there a margin at the likely winning price?

    In this country this kind of contract is usually awarded for between €97,648 and €855,235.

  6. Your call:

    Do we know this buyer?

    The buyer has 2 notices in the register and no pattern of winners yet.

Can I bid?

  • Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
  • The notice is written in Romanian.
  • Certificates from another EU country? Check the equivalents on eCertis

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 3 days ago

Expected award price

likely award for this notice, from its published estimate of €214,637
€173,856 to €214,637

Comparable awards in this country and sector came in at a median of 96% of their published estimate, half of them between 81% and 100%, based on 70 awards of the last 3 years.

Each award is compared with the estimate of the same lots, framework agreements excluded. A published estimate may include options and renewals, so an award under it is not always a discount.

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 645 awards for Petroleum, fuel & energy in Romania.

This notice
€214,637
Median award
€291,255
Middle half of past awards
€97,648 to €855,235

The estimate sits inside the usual range.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

COMUNA VALEA IASULUI (PRIMARIA COMUNEI VALEA IASULUI)

Romania

notices in the register
2

This buyer has no award history in this sector yet. Usual winners, Petroleum, fuel & energy - Romania

Company Wins Total awarded Last win
ROMPETROL DOWNSTREAM 100 €141.4M Oct 2026
OMV PETROM MARKETING 91 €88.1M Oct 2026
TINMAR ENERGY 78 €37.7M Sep 2026
ALMATAR TRANS 37 €10.8M Oct 2026
OMV PETROM S.A. 33 €16.2M Oct 2026

Based on 773 awards with a linked company profile over the last 2 years.

Market context

Larger than 36% of the open notices in Petroleum, fuel & energy across Europe.

open now in Petroleum, fuel & energy
3,750
median open notice
€375,620

Who wins in this market

Many suppliers

Romania · Petroleum, fuel & energy

different companies won awards here
130
of the awards went to the three most frequent winners
35%
buyers awarded contracts here
237

Based on 773 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
1.7
of those lots received a single tender
52%
of the awards went to companies based in another country
0%
of the tenders came from another country
8%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Open elsewhere in Europe

Matched by meaning across languages, from the notices' own words: the same kind of contract, open now in another country.

Awarded before

Never miss a tender like this

33 new notices in Petroleum, fuel & energy in Romania in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Solar installation: an email when new tenders arrive under it, no account needed.

10 days left

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language