Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 2 days ago Modification

Poland - Construction works - Construction of a second railway track with a second bridge over the Warta river on line no. 354 from Oborniki Wielkopolskie Most junction to Oborniki Wielkopolskie station

Original Polska - Roboty budowlane - „Wykonanie robót dla zadania pn.: „Budowa drugiego toru kolejowego wraz z drugą przeprawą mostową na rzece Warcie na odcinku linii kolejowej nr 354 od posterunku odgałęźnego Oborniki Wielkopolskie Most do stacji Oborniki Wielkopolskie” realizowanego w ramach Krajowego Planu Odbudowy i Zwiększenia Odporności”

Awarded Poland Wielkopolskie Construction work

Buyer PKP Polskie Linie Kolejowe S.A.

€28.3M awarded value · €28,260,886

Key facts

Awarded
  1. Awarded
  2. Published
  3. Contract ends, estimated October 2026
View the official notice Watch this tender

This contract runs about 20 months, so it is back on the market around October 2026. Log in

Awarded to

Awarded value
€28,260,886
Award date
Back on the market
Oct 2026 How we know

When this contract comes back

estimated from the stated duration

This contract runs about 20 months, so it is back on the market around October 2026.

Every contract expiring, on the radar

Summary

Machine-generated summary

PKP Polskie Linie Kolejowe S.A. awarded a construction contract for building a second railway track with a second bridge crossing over the Warta river on railway line no. 354, from the Oborniki Wielkopolskie Most junction to Oborniki Wielkopolskie station, under the National Recovery and Resilience Plan. The works cover track surface and subgrade, railway traffic control systems, telecommunications, catenary and power supply, low-voltage electrical systems, engineering structures, platforms and buildings, crossings, environmental protection facilities, and as-built documentation. The contract was awarded on 2025-02-28 for EUR 28,260,886.07.

Description

Przedmiotem Zamówienia jest wykonanie robót dla zadania pn.: „Budowa drugiego toru kolejowego wraz z drugą przeprawą mostową na rzece Warcie na odcinku linii kolejowej nr 354 od posterunku odgałęźnego Oborniki Wielkopolskie Most do stacji Oborniki Wielkopolskie” realizowanego w ramach Krajowego Planu Odbudowy i Zwiększenia Odporności” w tym wykonanie następujących elementów: Całość przedmiotu Zamówienia obejmuje wykonanie następujących elementów: 2.1.1. Realizacji robót w zakresach: 1) nawierzchnia i podtorze, 2) urządzenia sterowania ruchem kolejowym (srk), 3) urządzenia i systemy telekomunikacyjne, 4) sieć trakcyjna wraz z zasilaniem, 5) urządzenia i układy elektroenergetyki do 1 kV, 6) obiekty inżynieryjne, 7) perony i obiekty kubaturowe, 8) przejścia i przejazdy, 2.1.2. Realizacji robót polegających na budowie obiektów służących ochronie środowiska. 2.1.3. Dokumentacji powykonawczej, w tym: • opracowanie regulaminów technicznych, we współpracy z Zamawiającym, na podstawie Instrukcji Ir-3, po zakończeniu robót budowlanych, w zakresie wszystkich branż, • opracowanie geodezyjnej dokumentacji powykonawczej: - pikietażu linii i profilu podłużnego linii kolejowej, - protokołów zdawczo-odbiorczych znaków regulacji osi toru, - numerycznej mapy sytuacyjno-wysokościowej z geodezyjną inwentaryzacją powykonawczą, • opracowanie dokumentacji z założenia oraz pomiaru Kolejowej podstawowej osnowy geodezyjnej oraz Kolejowej osnowy specjalnej, • opracowanie nowych schematów posterunków ruchu oraz punktów ekspedycyjnych. Szczegółowy Opis Przedmiotu Zamówienia przedstawiony został w Specyfikacjach Technicznych Wykonania i Odbioru Robót Budowlanych (STWIORB) oraz Części opisowej i rysunkowej Dokumentacji Projektowej, stanowiących Tom III SWZ oraz w Przedmiarze Robót stanowiącym odrębny Tom IV SWZ.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 2 days ago

What this buyer has paid before

Based on 85 comparable contracts this buyer awarded in this sector over the last 4 years.

This award
€28.3M
Median award
€24.1M
Middle half of past awards
€5.8M to €91.1M

The award sits inside the usual range.

Most recent awards

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

PKP Polskie Linie Kolejowe S.A.

Poland

notices in the register
891
awards
238
awarded in total
€24.5B

Who wins its contracts

Many suppliers
different companies won its awards
138
of the awards went to the three most frequent winners
7%
of its calls state an estimated value
1%

Based on 185 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
4.4
of those lots received a single tender
23%
of the awards went to companies based in another country
3%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Awards most often to

  1. Alstom Polska S.A. 5 awards €7.2B
  2. Agencja Reklamowa FORMIND Sp. z o.o.; Euvic Media sp. z o.o 4 awards €4.2M
  3. BBF Sp. z o.o. 4 awards €2.2M

33 open tenders right now

Market context

open now in Construction work
20,149
median open notice
€559,898

Who wins in this market

Many suppliers

Poland · Construction work

different companies won awards here
13,606
of the awards went to the three most frequent winners
2%
buyers awarded contracts here
6,176

Based on 28,474 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.0
of those lots received a single tender
12%
of the awards went to companies based in another country
1%
of the tenders came from another country
3%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

2,240 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Construction work: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language