TED - Tenders Electronic Daily (Publications Office of the EU) verified 1 week ago Contract award

Polska - Roboty budowlane - Opracowanie dokumentacji projektowej i wykonanie robót budowlanych na odcinku Tunel - Kraków w ramach projektu inwestycyjnego pn.: „Poprawa infrastruktury linii kolejowej nr 8 Warszawa Zachodnia - Kraków Główny na odcinku Tunel - Kraków”

Awarded Poland Małopolskie Construction work

Buyer PKP Polskie Linie Kolejowe S.A.

€29.5M awarded value · €29,548,379

Key facts

Awarded
Procedure
Open procedure
  1. Awarded
  2. Published
View the official notice Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

Awarded to

PORR S.A.; Trakcja System Sp. z o.o.

Awarded value
€29,548,379
Award date
Record with this buyer
2 contracts from this buyer in the register, €159.1M in total

Description

Przedmiotem Zamówienia jest Opracowanie dokumentacji projektowej i wykonanie robót budowlanych na odcinku Tunel - Kraków w ramach projektu inwestycyjnego pn.: „Poprawa infrastruktury linii kolejowej nr 8 Warszawa - Zachodnia - Kraków Główny na odcinku Tunel - Kraków”. Przedmiotem Zakresu podstawowego jest opracowanie dokumentacji projektowej oraz wykonanie robót budowlanych na odcinku Tunel - Kraków: 1) dokumentacji projektowej niezbędnej do prawidłowego wykonania wszystkich robót budowlanych i uzyskania dla niej wszystkich wymaganych opinii, uzgodnień, dopuszczeń, warunków, decyzji i pozwoleń niezbędnych do realizacji przedmiotu zamówienia; 2) wszystkich robót budowlanych, zgodnie z Zakresem podstawowym zamówienia na podstawie opracowanej przez Wykonawcę i zatwierdzonej przez Zamawiającego dokumentacji projektowej, o której mowa w ww. pkt. 1) oraz wszystkich robót przygotowawczych niezbędnych do wykonania zakresu Umowy oraz wszelkich czynności wymaganych Prawem; 3) przeprowadzenie oceny zgodności podsystemu strukturalnego „Sterowanie - urządzenia przytorowe”, objętego zakresem zamówienia na każdym etapie (projektowania, budowy i końcowych prób podsystemu). Szczegółowy Zakres podstawowy robót: 1) odcinkowe mechaniczne podbicie toru nr 1 i 2 z uzupełnieniem podsypki na odcinku Tunel - Kraków Główny; 2) odcinkowa wymiana szyn na odcinku Tunel - Miechów, Miechów - Słomniki, stacji Słomniki, Słomniki - Niedźwiedź, Niedźwiedź - Zastów; 3) odcinkowe wzmocnienie podtorza; 4) przebudowa przejazdów - 6 szt. (km 271,185, km 280,570, km 282,649, km 293,726, km 294,076 i km 306,380); 5) wymiana rozjazdów w stacji Miechów 6 szt. i 1 szt. skrzyżowania torów, w stacji Słomniki 9 szt. i 2 szt. skrzyżowania torów, w stacji Zastów 4 szt. i 1 szt. skrzyżowania torów, na p.odg. Raciborowice 3 szt.; zabudowa urządzeń EOR na rozjazdach w st. Miechów, st. Zastów, p.odg. Raciborowice; 6) naprawa główna torów nr 3 i 4 w stacji Kraków Batowice; 7) przebudowa oświetlenia - st. Miechów, p.o. Kamieńczyce, p.o. Smroków, st. Słomniki, p.o. Słomniki Miasto p.o. Goszcza; p.odg. Raciborowice, st. Kraków Batowice, p.odg. Kraków Przedmieście; 8) odcinkowa wymiana sieci trakcyjnej: w stacji Tunel wraz z wyjazdem na szlak Tunel - Miechów, w stacji Miechów, stacji Słomniki, na odcinku Słomniki - Niedźwiedź, na odcinku Raciborowice - Kraków Batowice, w stacji Kraków Batowice, na odcinku Kraków Batowice - Kraków Przedmieście; 9) budowa/przebudowa 5 peronów - st. Miechów 1, p.o. Smroków 1, st. Kraków Batowice 1, oraz w stacji Kraków Główny 2 Prawo opcji Przedmiotem Prawa Opcji jest opracowanie dokumentacji projektowej oraz wykonanie robót budowlanych obejmujących budowę przystanku osobowego w Zastowie. Zamawiający może skorzystać z Prawa opcji w całości lub w części w okresie 2 miesięcy od dnia zawarcia Umowy. Za zgodą Wykonawcy, wyrażoną na piśmie, Zamawiający może skorzystać z Prawa opcji w późniejszym okresie, niż wskazany w poprzednim zdaniu. Szczegółowy Opis Przedmiotu Zamówienia przedstawiony został w Programie Funkcjonalno-Użytkowym (PFU) stanowiącym Tom III SWZ.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 week ago

What this buyer has paid before

Based on 85 comparable contracts this buyer awarded in this sector over the last 4 years.

This award
€29.5M
Median award
€24.1M
Middle half of past awards
€5.8M to €91.1M

The award sits inside the usual range.

Most recent awards

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

PKP Polskie Linie Kolejowe S.A.

Poland

notices in the register
885
awards
237
awarded in total
€24.5B

Who wins its contracts

Many suppliers
different companies won its awards
137
of the awards went to the three most frequent winners
7%
of its calls state an estimated value
2%

Based on 184 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
4.4
of those lots received a single tender
23%
of the awards went to companies based in another country
3%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Awards most often to

  1. Alstom Polska S.A. 5 awards €7.2B
  2. Agencja Reklamowa FORMIND Sp. z o.o.; Euvic Media sp. z o.o 4 awards €4.2M
  3. BBF Sp. z o.o. 4 awards €2.2M

30 open tenders right now

Market context

open now in Construction work
19,943
median open notice
€533,524

Who wins in this market

Many suppliers

Poland · Construction work

different companies won awards here
13,454
of the awards went to the three most frequent winners
2%
buyers awarded contracts here
6,146

Based on 28,089 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.0
of those lots received a single tender
12%
of the awards went to companies based in another country
1%
of the tenders came from another country
3%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

2,245 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Construction work: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language