Open raceNo supplier dominates: 36 different companies have won the last 66 comparable contracts from this buyer over 5 years. This is a genuinely open race.
Based on 66 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryConstruction of the eastern section of the S1 Vienna outer ring expressway between Gross-Enzersdorf and Süssenbrunn. Lot 1.1, the main construction lot, covers the S1 carriageway between km 25.425 and km 35.550, including earthworks, road construction, drainage and noise protection. The works also include construction and ancillary roads with earthworks and drainage, eight pumping and lifting stations with switchgear buildings and a discharge channel into the Russbach, eight pump distributor buildings, 17 bridge structures, two trough structures, and electrical and mechanical services such as cable ducts, medium-voltage installations, site power supply, foundations and access routes. Optional works include a roundabout L3019/L11a and a link bridge over the S1.
Description
Terms of the procedure
- How tenders are scored
- Quality
As the official notice states them.
Bid or no-bid?
Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.
Can I bid?
- Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
- The notice is written in German.
- Certificates from another EU country? Check the equivalents on eCertis
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 7 hours ago
What this buyer has paid before
Based on 66 comparable contracts this buyer awarded in this sector over the last 4 years.
- Median award
- €156,131
- Middle half of past awards
- €99,992 to €340,695
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.
Most recent awards
- ABM Klagenfurt, Neubau Carport, Sanierung Asphaltfläche u. Sanierung Außenhülle Verwaltung und Sanitäranlagen - ABM Klagenfurt, Neubau Carport, San. Asphaltfläche u. San. Außenhülle Verwaltung u. Sanitäranlagen €735,450
- S33 INS Setzung Fahrbahn km 12,41 - 17,77 - S33 INS Setzung Fahrbahn km 12,41 - 17,77, Bauleistung (DVmB) €121,868
- S10 Mühlviertler Schnellstraße- Unterweitersdorf - Freistadt Nord - Rückbau Pegel €155,414
- A02 INSB Ast. Mödling - Hauptbauleistung Bau + EM €2,712,620
- A14 NBSB V101 Überführung L190 KM 30,2 - ÖBB Leistungen / Bereich Bahnstrecke €282,071
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileAutobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft
- notices in the register
- 267
- awards
- 228
- awarded in total
- €157.1M
Who wins its contracts
Many suppliers- different companies won its awards
- 131
- of the awards went to the three most frequent winners
- 15%
- of its calls state an estimated value
- 0%
Based on 222 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- of the awards went to companies based in another country
- 9%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| SPIE KEM GmbH, Zentrale | 13 | €2.0M | Sep 2026 |
| HABAU Hoch- und Tiefbaugesellschaft m.b.H. Tiefbau Ost (W,NÖ, Bgld) | 7 | €2.6M | Sep 2026 |
| PORR Bau GmbH Tiefbau Tirol | 3 | €1.4M | Sep 2026 |
| Bauunternehmung Granit Gesellschaft m.b.H., Zentrale Kalkulation | 3 | €761,818 | Aug 2026 |
| Jos. Ertl GmbH Kalkulation | 3 | €477,265 | Sep 2026 |
Based on 66 awards with a linked company profile over the last 5 years.
16 open tenders right now
- Construction supervision - 4921 A01 GEN Kn. Linz-Kn. Haid + 0005 A01 ASt Traun/Haid - Local construction supervision EM 22 days left
- Services of architecture, engineering and testing offices - Framework agreement - Construction site traffic safety audits Bau WEST 25 days left
- Construction works - A10 INB Obj. Z33.1+2, Z28, Z29, access Oberweißburg - A10, bridge rehabilitation Z28, Z29 and Z33 - construction works 25 days left
Market context
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.
- open now in Construction work
- 20,254
- median open notice
- €500,000
Who wins in this market
Many suppliersAustria · Construction work
- different companies won awards here
- 1,263
- of the awards went to the three most frequent winners
- 8%
- winners of the last 12 months were new here
- 1,006 of 1,127
- buyers awarded contracts here
- 327
Based on 2,522 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners. New: no award from the same buyer or market in the two years before.
Competition
- tenders per lot on average (open and restricted procedures)
- 5.4
- of those lots received a single tender
- 10%
- of the awards went to companies based in another country
- 2%
- of the tenders came from another country
- 0%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Awarded before
-
GU-Leistungen €183,000
Never miss a tender like this
170 new notices in Construction work in Austria in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Construction work: an email when new tenders arrive under it, no account needed.