Summary
Machine-generated summaryThe purpose of this procurement is the construction of a filtration system on the reject water line of the sludge dewatering process at the Elva wastewater treatment plant. The contract covers civil and installation works needed to build a microfiltration unit that treats the reject water generated when dewatering sludge. The works include delivering, installing and commissioning the filtration equipment and integrating it with the existing treatment plant infrastructure. Detailed grounds for exclusion and qualification requirements are set out in the tender documents, which interested suppliers should consult for the full technical specifications and conditions of participation.
Timing
17 days from publication to deadline.
- Published
- Deadline
- Awarded pending
Description
Official source
Source: Riigihangete register (RHR, Rahandusministeerium)
Always verify details on the official notice.
Last verified against Riigihangete register (RHR, Rahandusministeerium) 1 month ago
- Tender documents The official portal may ask for a free registration before downloading.
- Certificate equivalence across the EU (eCertis)
- Report an error in this notice
Market
Construction work in Estonia
- median open notice
- €552,313
- tenders per lot in this market
- 6.8
More figures
Market context
- open now in Construction work
- 18,760
- median open notice
- €552,313
Who wins in this market
Moderately concentratedEstonia · Construction work
- different companies won awards here
- 93
- of the awards went to the three most frequent winners
- 38%
- buyers awarded contracts here
- 45
Based on 229 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 6.8
- of those lots received a single tender
- 2%
- of the awards went to companies based in another country
- 1%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
The buyer in figures
AS Emajõe Veevärk
The buyer
Full buyer profileAS Emajõe Veevärk
Similar tenders
Open now
18
days left
Design and construction works to improve the energy efficiency of the Põlva wastewater treatment plant
aktsiaselts PÕLVA VESI
22
days left
Design and build works for the reconstruction of the Rummu wastewater treatment plant
Aktsiaselts Lahevesi
5
days left
4
days left
Roof repair works for the archive library of the SA Saaremaa Museum
Sihtasutus Saaremaa Muuseum
€80,000 est. value
7
days left
Construction works for the storage yard, shelter and storage containers at the RMK Purila nursery
Riigimetsa Majandamise Keskus
€35,000 est. value
Awarded before
Never miss a tender like this
39 new notices in Construction work in Estonia in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Sewage plant equipment: an email when new tenders arrive under it, no account needed.