Kitchen Replacement Programme

Open United Kingdom Construction work

Buyer Vico homes limited

43 days left

Key facts

Closes
12:00 (UTC)
Estimated value
€132.0M
€132,015,337 · converted from GBP
Procedure
Open procedure Anyone may submit a bid, in one step, with no pre-selection. Full entry
View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

Summary

Machine-generated summary

Vico Homes is procuring a planned kitchen replacement programme across its housing properties. The works consist mainly of like-for-like kitchen replacement, subject to statutory compliance, safety, resident need and approved design changes. Properties are grouped into geographical lots, with one contractor appointed per lot, and volumes are expected to rise each year. The contractor will act as Principal Contractor, discharging CDM duties and Building Regulations requirements, and will manage the full delivery programme: customer appointments, asbestos and kitchen surveys, tenant choice capture, kitchen manufacture and ordering through the Jewson Partnership Solutions arrangement, installation dates, resource planning and geographical batching. Contractor responsibilities cover survey sequencing, scheduling and backfill arrangements within the allocated area.

Timing

43 days from publication to deadline. Usual length in United Kingdom: 30 days. Longer than usual

  1. Published
  2. Today
  3. Deadline
  4. Awarded pending
More figures

Notices of this kind (United Kingdom, open procedure, above the EU threshold) give a median of 30 days, half of them between 26 and 36 days, based on 2,112 notices of the last two years.

Description

The specifications support the planned replacement of kitchens in Vico Homes properties and are intended to form schedules to the contract. The base requirement is a like-for-like replacement of existing kitchens ('kitchen out, kitchen in'), subject always to statutory compliance, safety, resident need and any approved design change. The specifications shall be read together with the Schedule of Rates, contract documents, product schedules and any other schedules forming part of the contract. The Contractor shall act as Principal Contractor for the works and shall discharge all associated duties under CDM and applicable Building Regulations requirements. Vico Homes shall identify the appointed CDM Principal Designer and any duties expressly retained by Vico Homes within the contract documents. The Contractor shall be responsible for coordinating and completing the works required to deliver a complete, safe, compliant and habitable kitchen replacement, except where this specification expressly states that a duty, approval, decision or risk is retained by Vico Homes. 1.1 Programme Delivery and Model Properties are grouped into defined geographical areas (Lots) and a contractor will be appointed to each Lot. Vico Homes will provide the successful Contractors with the initial property address lists of their Lot during the first year of the contract. The volume of each Lot is anticipated to increase per annum as indicated in Appendix B Specification The Contractor shall be responsible for using the address list to develop, maintain and manage its own delivery programme for the allocated geographical area, including but not limited to; Customer appointments, Survey sequencing, Asbestos surveys/ removals, Kitchen surveys, Agreeing Tenant choice capture, Arrange kitchens manufacture and order via Jewson partnership Solutions (JPS), installation dates, resource planning, geographical batching and backfill arrangements. Vico Homes shall provide sufficient validated backfill properties where available to support continuity of delivery. Where properties are refused, unavailable or delayed, the Contractor shall re sequence its programme and use the agreed backfill process to minimise impact on the annual target, monthly delivery profile and weekly delivery targets. For year 1 kitchen and asbestos surveys have been completed for the majority of properties and will be provided to the contractor, Year 2 onwards will follow the above model. i.e the Contractor will be responsible for the full process. Materials All kitchen orders, including kitchen packs and associated components shall be processed through Symphony via Vico Homes Stores function. The contractor shall be responsible for ensuring that orders are placed in sufficient time to meet program requirements. All materials ordered through Stores shall be delivered to and stored within the contractors' own facilities. The contractor shall be responsible for the receipt, inspection, security, storage and stock management of all materials upon delivery. Kitchen packs, inclusive of base, sink, wall units and worktop materials shall be ordered through Stores, however all other items required to complete the works shall be supplied by the contractor at their own cost and be deemed to be included within the tendered rates. The Stores function is operated and managed by Jewson Partnership Solutions (JPS). As a condition of participation in this contract, Contractors must hold and maintain an approved credit facility with JPS sufficient to support the ongoing delivery of the services and works required under the contract. The work will be split up into the following geographical LOT's LOT 1 - Wakefield South - WF1, WF2, WF4 LOT 2 - Wakefield North - WF3, WF5, WF6, WF10, WF11 LOT 3 - Wakefield East - WF7, WF8, WF9 For clarity Vico will maintain an in-house delivery team operating in the WF7, WF8 and WF10 postcodes, the kitchen volumes for internal delivery have already been removed from the anticipated volumes of Lot 2 and Lot 3.

Bid or no-bid?

2 of 6 answered from the register

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. In your favour:

    Do we meet every eligibility criterion?

    Open procedure: any interested supplier may submit a bid.

  2. Your call:

    Can we deliver this with the team we have?

    Estimated at €132.0M.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Construction work.

  4. In your favour:

    Is the deadline realistic for a proper offer?

    43 days left, 32 of them working days.

  5. Your call:

    Is there a margin at the likely winning price?

    In this country this kind of contract is usually awarded for between €97,455 and €1.1M.

  6. Your call:

    Do we know this buyer?

    The buyer has 9 notices in the register and no pattern of winners yet.

Can I bid?

  • Open procedure: any interested supplier may submit a bid.
  • Documents in English.

Official source

Source: Find a Tender Service (UK Cabinet Office / Crown Commercial Service)

Always verify details on the official notice.

Last verified against Find a Tender Service (UK Cabinet Office / Crown Commercial Service) 2 hours ago

Documents on Find a Tender Service (UK Cabinet Office / Crown Commercial Service) (English)

Market

Construction work in United Kingdom

median award in this market
€289,927
More figures

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 1,451 awards for Construction work in United Kingdom.

This notice
€132.0M
Median award
€289,927
Middle half of past awards
€97,455 to €1.1M

The estimate is larger than three in four past awards.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Market context

Larger than 98% of the open notices in Construction work across Europe.

open now in Construction work
18,810
median open notice
€575,846

Who wins in this market

Many suppliers

United Kingdom · Construction work

different companies won awards here
933
of the awards went to the three most frequent winners
6%
buyers awarded contracts here
423

Based on 1,719 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

The buyer in figures

Vico homes limited

notices in the register
9
awards
5

Vico homes limited

United Kingdom

This buyer has no award history in this sector yet. Usual winners, Construction work - United Kingdom

Company Wins Total awarded Last win
Holcim uk limited 41 €50.9M Oct 2026
Tarmac Trading Limited 36 €57.6M Oct 2026
FM Conway Ltd 18 €26.8M Sep 2026
Thomas bow LTD 18 €5.3M Sep 2026
Lindum group limited 17 €31.7M Sep 2026

Based on 1737 awards with a linked company profile over the last 2 years.

2 open tenders right now

Similar tenders

Open now

Awarded before

Never miss a tender like this

185 new notices in Construction work in United Kingdom in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Installation of fitted kitchens: an email when new tenders arrive under it, no account needed.

43 days left

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language