Skip to content
Aperlena

Riigihangete register (RHR, Rahandusministeerium) verified 9 hours ago Contract notice

Harju county, Tallinn, Lasnamäe, Mustakivi 7: changes to electricity producer conditions and medium-voltage connection (LC5781)

Original Harju maakond, Tallinn, Lasnamäe LO, Mustakivi 7 elektritootja tingimuste muutmine ning keskpingel liitumine (LC5781)

Open Estonia Eesti Construction work

Buyer Elektrilevi OÜ

11:00 closes 13 Oct (UTC+3)

Key facts

Closes
18:31 hours left
Competition
Open race
  1. Published
  2. Today
  3. Deadline open for 11 days
  4. Awarded pending

Bidding window

10 days from publication to deadline

Usual length

Notices of this kind (Estonia, below the EU threshold) give a median of 14 days, half of them between 10 and 19 days, based on 743 notices of the last two years.

This buyer usually gives 12 days (median of its last 182 calls for tender). It extended the deadline on 13 of the 105 calls we followed from publication (12%).

View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

The Aperlena Verdict

Open race

No supplier dominates: 7 different companies have won the last 7 comparable contracts from this buyer over 5 years. This is a genuinely open race.

Based on 7 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.

Summary

Machine-generated summary

This public procurement covers construction works at Mustakivi 7 in the Lasnamäe district of Tallinn, Harju county. The works consist of modifying the conditions for an electricity producer and connecting the site to the medium-voltage network, to be carried out in accordance with the project design and additional conditions stated in the procurement documents. The final deadline for completing the works is 15 January 2027. The medium-voltage cable is ordered by ELV. Where possible and necessary, the contract may be signed and the works started before the expected contract validity start date, or after it if the procedure takes longer. Eligibility grounds and qualification requirements are set out in the procurement basis documents.

Description

Hange on välja kuulutatud: Harju maakond, Tallinn, Lasnamäe LO, Mustakivi 7 elektritootja tingimuste muutmine ning keskpingel liitumine (LC5781). Ehitada vastavalt projektile ja lisatingimustele. Tööde teostamise lõpptähtaeg on 15.01.2027. NB! KP kaabli tellib ELV. Võimalusel ja vajadusel võib lepingu sõlmida ja tööde teostamise/teenuste tellimisega alustada enne hanke kohta üldandmetes avaldatud lepingu kehtivuse eeldatavat algusaega. Hankemenetluse kulgemise pikenemisel üle selle aja võib lepingu sõlmida ja selle täitmisega alustada ka peale üldandmetes avaldatud lepingu kehtivuse eeldatavat algusaega. / Kõrvaldamise alused ja kvalifitseerimistingimused: Vaata hanke alusdokumentidest

Bid or no-bid?

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. Your call:

    Do we meet every eligibility criterion?

    The register holds nothing on this. The official documents will.

  2. Your call:

    Can we deliver this with the team we have?

    The register holds nothing on this. The official documents will.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Construction work.

  4. Check this first:

    Is the deadline realistic for a proper offer?

    1 day left.

  5. Your call:

    Is there a margin at the likely winning price?

    In this country this kind of contract is usually awarded for between €2.2M and €10.8M.

  6. In your favour:

    Do we know this buyer?

    7 different companies won the last 7 comparable contracts.

Can I bid?

Official source

Source: Riigihangete register (RHR, Rahandusministeerium)

Always verify details on the official notice.

Report an error in this notice

Last verified against Riigihangete register (RHR, Rahandusministeerium) 9 hours ago

The official portal may ask for a free registration before downloading.

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 103 awards for Construction work in Estonia.

Median award
€6.1M
Middle half of past awards
€2.2M to €10.8M

Riigihangete register (RHR, Rahandusministeerium) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Elektrilevi OÜ

Estonia

notices in the register
390
awards
195
awarded in total
€46.2M

Who wins its contracts

Many suppliers
different companies won its awards
62
of the awards went to the three most frequent winners
24%
of its calls state an estimated value
13%

Based on 189 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.6
of those lots received a single tender
5%
of the awards went to companies based in another country
5%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Who usually wins this buyer's contracts in this sector

Based on 7 awards with a linked company profile over the last 5 years.

33 open tenders right now

Market context

Riigihangete register (RHR, Rahandusministeerium) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.

open now in Construction work
20,053
median open notice
€531,153

Who wins in this market

Moderately concentrated

Estonia · Construction work

different companies won awards here
90
of the awards went to the three most frequent winners
38%
buyers awarded contracts here
42

Based on 218 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
7.1
of those lots received a single tender
1%
of the awards went to companies based in another country
1%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

35 new notices in Construction work in Estonia in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Electrical installation work: an email when new tenders arrive under it, no account needed.

18:31 hours left

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language