Machine-generated summary

Electrical network works in the Jägala network area in Harju County, Estonia, converting the network from 10kV to 20kV, phase III. The works must be carried out according to the design documentation and additional conditions. Bidders must review the project documentation and visit the site before submitting tenders. Substations, transformers, 240mm2 medium voltage cable and meters are procured by Elektrilevi and handed over to the contractor for installation; transport of these devices and materials from Elektrilevi's supply partner to the site is included in the contractor's scope. Work completion deadline: 28 October 2027. Handover of completed works is permitted from the beginning of 2027 unless the parties agree otherwise in writing.

Description

Harju maakonnas Jägala võrgupiirkonna üleviimine 10kV-lt 20kV-le, III etapp. Ehitada vastavalt projektile ja lisatingimustele. Enne pakkumiste esitamist tutvuda projektdokumentatsiooniga ning käia kohapeal. Tööde teostamise tähtaeg 28.10.2027. NB: Lepingu alusel teostatud tööde akteerimine on lubatud alates 2027. aasta algusest, kui lepingu pooled ei ole kirjalikult kokku leppinud teisiti. Alajaamad, trafod, keskpingekaabel 240mm2 ja arvestid hangib Elektrilevi ja annab töövõtjale paigaldamiseks üle. Elektrilevi poolt hangitavate seadmete ja materjalide transport ning sellega kaasnevad kulud Elektrilevi tarnepartnerilt objektile kuuluvad töövõtja töö mahtu. Hankija võib hankelepingu sõlmida enne või peale üldandmetes avaldatud lepingu kestuse eeldatavat alguskuupäeva. Lepingu täitmise tähtaeg sellest ei muutu. / Kõrvaldamise alused ja kvalifitseerimistingimused: Vaata hanke alusdokumentidest

Official source

Source: Riigihangete register (RHR, Rahandusministeerium)

Always verify details on the official notice.

Last verified against Riigihangete register (RHR, Rahandusministeerium) 16 hours ago

The official portal may ask for a free registration before downloading.

More from this buyer

Full buyer profile

47 open tenders right now

This buyer has no award history in this sector yet. Usual winners, Construction work - Estonia

Company Wins Total awarded Last win
Aktsiaselts Viimsi Keevitus 22 n/a Sep 2026
Watercom OÜ 12 €20,900 Sep 2026
Osaühing Megido 4 n/a Sep 2026
Osaühing Mapri Ehitus 3 €58.4M Aug 2026
AS Tariston 3 €12.9M Apr 2026

Based on 105 awards with a linked company profile over the last 2 years.

Similar tenders

Market context

Avg. open tender · Construction work
€31,565,900
25,890 open across Europe right now
Buyer track record on Aperlena
254 notices tracked · 103 awarded
€33,881,323 in awarded contracts

Never miss a tender like this

43 new notices in Construction work in Estonia in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close