Harju County, Kiili Parish, Vaela Village, Priidu tee 6 property medium-voltage electricity grid connection (LC5951, LC5952)

Original Harju maakond, Kiili vald, Vaela küla, Priidu tee 6 kinnistu keskpinge liitumine elektrivõrguga (LC5951, LC5952)

Open Estonia Eesti Construction work

Buyer Elektrilevi OÜ

4 days left

Key facts

Closes
10:00 (UTC+3)
Competition
Open race
  1. Published
  2. Today
  3. Deadline open for 9 days
  4. Awarded pending

Bidding window

8 days from publication to deadline

Shorter than usual

Notices of this kind (Estonia, below the EU threshold) give a median of 14 days, half of them between 10 and 19 days, based on 743 notices of the last two years. Fewer days than three in four comparable notices. Check the documents early and ask questions before the clarification deadline.

This buyer usually gives 12 days (median of its last 182 calls for tender). It extended the deadline on 13 of the 105 calls we followed from publication (12%).

View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

The Aperlena Verdict

Open race

No supplier dominates: 7 different companies have won the last 7 comparable contracts from this buyer over 5 years. This is a genuinely open race.

Based on 7 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.

Summary

Machine-generated summary

This procurement covers construction work to connect the property at Priidu tee 6 in Vaela village, Kiili parish, Harju county, to the medium-voltage electricity network. The works must be carried out according to the project design and the special conditions of the tender. The deadline for completing the works is 19 February 2027. The substation, transformer and meters will be supplied by Elektrilevi, with their expected delivery on 30 November 2026. Where possible and necessary, the contract may be signed and work begun earlier. The standard contract terms document 'P135' applicable from June 2024 applies.

Description

Hange on välja kuulutatud: Harju maakond, Kiili vald, Vaela küla, Priidu tee 6 kinnistu keskpinge liitumine elektrivõrguga (LC5951, LC5952) Ehitada vastavalt projektile ja hanke lisatingimustele. Tööde teostamise tähtaeg on 19.02.2027. Alajaama, trafo ja arvestid tarnib Elektrilevi. AJ eeldatav tarne 30.11.26. Võimalusel ja vajadusel võib lepingu sõlmida ja tööde teostamisega alustada enne hanke kohta üldandmetes avaldatud lepingu kehtivuse eeldatavat algusaega. Hankemenetluse kulgemise pikenemisel üle selle aja võib lepingu sõlmida ja selle täitmisega alustada ka peale üldandmetes avaldatud lepingu kehtivuse eeldatavat algusaega. NB! Palume tähelepanu pöörata 18.06.2024 kehtima hakanud dokumendile „P135 Elektripaigaldise ehitustööde töövõtulepingu tüüptingimused ver. 23". / Kõrvaldamise alused ja kvalifitseerimistingimused: Vaata hanke alusdokumentidest

Bid or no-bid?

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. Your call:

    Do we meet every eligibility criterion?

    The register holds nothing on this. The official documents will.

  2. Your call:

    Can we deliver this with the team we have?

    The register holds nothing on this. The official documents will.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Construction work.

  4. Check this first:

    Is the deadline realistic for a proper offer?

    4 days left.

  5. Your call:

    Is there a margin at the likely winning price?

    In this country this kind of contract is usually awarded for between €2.2M and €11.2M.

  6. In your favour:

    Do we know this buyer?

    7 different companies won the last 7 comparable contracts.

Can I bid?

Official source

Source: Riigihangete register (RHR, Rahandusministeerium)

Always verify details on the official notice.

Report an error in this notice

Last verified against Riigihangete register (RHR, Rahandusministeerium) 3 hours ago

The official portal may ask for a free registration before downloading.

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 102 awards for Construction work in Estonia.

Median award
€6.2M
Middle half of past awards
€2.2M to €11.2M

Riigihangete register (RHR, Rahandusministeerium) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Elektrilevi OÜ

Estonia

notices in the register
385
awards
190
awarded in total
€45.7M

Who wins its contracts

Many suppliers
different companies won its awards
62
of the awards went to the three most frequent winners
23%
of its calls state an estimated value
12%

Based on 184 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.7
of those lots received a single tender
5%
of the awards went to companies based in another country
5%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Who usually wins this buyer's contracts in this sector

Based on 7 awards with a linked company profile over the last 5 years.

37 open tenders right now

Market context

Riigihangete register (RHR, Rahandusministeerium) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.

open now in Construction work
20,923
median open notice
€559,747

Who wins in this market

Moderately concentrated

Estonia · Construction work

different companies won awards here
90
of the awards went to the three most frequent winners
38%
buyers awarded contracts here
41

Based on 216 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
7.1
of those lots received a single tender
1%
of the awards went to companies based in another country
1%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

34 new notices in Construction work in Estonia in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Electrical installation work: an email when new tenders arrive under it, no account needed.

4 days left

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language