River Culture Trail in Åmli: Earthworks, Carpentry and Electrical Works

Original Elvekultursti Åmli

Open Norway Construction work

Buyer Åmli kommune

16 days left

Key facts

Closes
12:00 (UTC+1)
View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

Summary

Machine-generated summary

Åmli Municipality invites tenders for the first phase of the River Culture Trail along the Nidelva river in central Åmli. The project involves establishing a universally designed recreational path approximately 1.5 km long. This tender covers land-based measures and lighting, organized as a general contract divided into three separate sub-contracts. Sub-contract 1 covers earthworks and gravel laying. Sub-contract 2 addresses wooden decking and carpentry work. Sub-contract 3 handles electrical installations and lighting. The municipality has secured funding for these land-based actions. Water-based structures like floating walkways and rest areas are excluded pending further financing decisions expected between 2027 and 2028. Contractors must follow NS 8407 general conditions. Detailed technical specifications are based on an existing feasibility study.

Timing

20 days from publication to deadline. Usual length in Norway: 25 days. Usual length

  1. Published
  2. Today
  3. Deadline
  4. Awarded pending
More figures

Notices of this kind (Norway, below the EU threshold) give a median of 25 days, half of them between 18 and 31 days, based on 1,082 notices of the last two years.

Description

Bakgrunn og formål Bakgrunn Å utvikle vestsiden av Nidelva i Åmli sentrum som et attraktivt friluftsområde har lenge stått høyt på den politiske agendaen i Åmli kommune. Åmli kommune gjennomførte derfor i perioden august til desember 2025 en mulighetsstudium av en elvekultursti i samarbeid med Trollvegg arkitekter og Agder Fylkeskommune. Mulighetsstudie er vedlagt anbudet. Elvekulturstien strekker seg over ca. 1,5 km. langs med og på Nidelva ref. mulighetsstudie. Åmli kommune har siden jobbet med å reise finansiering til prosjektet. Vi har nå reist delfinansiering og kan starte opp første etappe av elvekulturstien. Formål På bakgrunn av mulighetsstudium skal Åmli kommune etablere første etappe av sammenhengende universelt utformet elvekultursti. Vi deler elvekulturstien opp i tiltak på land (landbaserte tiltak) og tiltak på vann (vannbaserte tiltak). Elvekulturstien består av: gangsti av kombinert grus og tre (tiltak på land) gangsti av tre (tiltak på vann) Hvileplass/oppholdsareal av tre (tiltak på vann) Diverse tilretteleggingstiltak tilknyttet stien, herunder lyssetting Foreløpig har vi reist midler til tiltak på land og lyssetting. Tiltak på vann i form av gangsti og hvileplass/oppholdsareal er avhengig av ytterligere finansiering. Vi forventer avklaring på dette tidligst februar 2027, senest februar 2028. Entrepriseform Arbeidene inngår som del av en totalentreprise etter NS 8407 Alminnelige kontraktsbestemmelser for totalentrepriser. Elvekulturstien lyses ut som en samlet konkurranseutsettelse med 3 delkontrakter. Fast kontraktsomfang - tiltak på land (finansiert) Etablering av gangsti av kombinert grus og tre med tilhørende lyssetting Etableringen lyses ut som tre separate delkontrakter; Delkontrakt 1 gjeldende gruslag/gravearbeid, Delkontrakt 2 gjeldende treplatting/tømrerarbeid og Delkontrakt 3 elektro. Fysisk detaljprosjektering i Åmli. Åmli kommune har allerede detaljert mulighetsstudie som angir terrengtilpasset linjeføring av stien med GPS koordinater. Detaljprosjektering på papir ser vi derfor ikke er nødvendig. Den fysiske detaljprosjektering vil foregå i Åmli. Konkret i form av utstikking av stien før byggestart. En prosjektleder fra Åmli kommune deltar i den konkrete utstikking. Opsjonsomfang - tiltak på vann (foreløpig ufinansiert) Detaljprosjektering og etablering av gangsti på vann utført i tre med tilhørende lyssetting jfr. mulighetsstudie s. 10-12 og 15-17. Konkret er det snakk om to partier av tre ved henholdsvis Timmerodden Bofelleskap og Hegna industriområde. Detaljprosjektering og etablering av hvileplass/oppholdsareal utført i tre med tilhørende lyssetting jfr. mulighetsstudie s. 22-23. Supplerende info om etablering Vi må som nevnt etablere elvekulturstien i flere etapper da prosjekter per dags dato ikke er fullfinansiert. Første etappe Første etappe består konkret av strekningen fra Badeparken til Åmli kraftstasjon jfr. mulighetsstudie. Denne etappe består kun av tiltak på land og er derfor finansiert og klar for byggestart etter vinteren. Annen etappe Annen etappe består av strekningen fra Elvarheim til Hegna industriområde. Denne etappe består i hovedsak av tiltak på vann med enkelte gruspartier. Etappen er ikke full finansiert. Vi forventer avklaring på finansiering tidligst februar 2027, senest 2028. Oppstart forutsetter finansiering. Tredje etappe Tredje og siste etappe består av etablering av hvileplass/ oppholdsareal ved Åmli kraftstasjon. Dette tiltak er ikke finansiert. Vi forventer avklaring på finansiering tidligst februar 2027, senest februar 2028. Vi ber derfor om tilbudet (opsjon) gjelder frem til 1. mars 2028 (seneste dato for avklaring av finansiering).Tilbudet indeksreguleres.

Bid or no-bid?

1 of 6 answered from the register

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. Your call:

    Do we meet every eligibility criterion?

    The register holds nothing on this. The official documents will.

  2. Your call:

    Can we deliver this with the team we have?

    The register holds nothing on this. The official documents will.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Construction work.

  4. In your favour:

    Is the deadline realistic for a proper offer?

    16 days left, 12 of them working days.

  5. Your call:

    Is there a margin at the likely winning price?

    In this country this kind of contract is usually awarded for between €3.1M and €15.9M.

  6. Your call:

    Do we know this buyer?

    The buyer has 6 notices in the register and no pattern of winners yet.

Can I bid?

Official source

Source: Doffin - Database for offentlige innkjøp (DFØ)

Always verify details on the official notice.

Last verified against Doffin - Database for offentlige innkjøp (DFØ) 22 hours ago

Market

Construction work in Norway

median award in this market
€6.2M
tenders per lot in this market
4.0
More figures

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 296 awards for Construction work in Norway.

Median award
€6.2M
Middle half of past awards
€3.1M to €15.9M

Doffin - Database for offentlige innkjøp (DFØ) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Market context

Doffin - Database for offentlige innkjøp (DFØ) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.

open now in Construction work
19,551
median open notice
€566,742

Who wins in this market

Many suppliers

Norway · Construction work

different companies won awards here
238
of the awards went to the three most frequent winners
8%
buyers awarded contracts here
106

Based on 345 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
4.0
of those lots received a single tender
8%
of the awards went to companies based in another country
1%
of the tenders came from another country
0%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

The buyer in figures

Åmli kommune

notices in the register
6

Åmli kommune

Norway

This buyer has no award history in this sector yet. Usual winners, Construction work - Norway

Company Wins Total awarded Last win
Veidekke Industri AS 13 €54.3M Apr 2026
HENT AS 9 €448.9M Apr 2026
AF Gruppen Norge AS 7 €740.8M Sep 2026
NCC Industry 7 €26.2M Apr 2026
AF Energi AS 5 €75.4M Jul 2026

Based on 345 awards with a linked company profile over the last 2 years.

Similar tenders

Open now

Awarded before

Never miss a tender like this

80 new notices in Construction work in Norway in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Footpath construction work: an email when new tenders arrive under it, no account needed.

16 days left

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language