Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 6 days ago Contract notice

Germany - Technical planning services - Extension of the Dermatology Clinic - Annex - Specialist planning HVAC and medical systems

Original Deutschland - Technische Planungsleistungen - Erweiterung der Klinik für Dermatologie - Anbau _ Fachplanung HLSK

Closed Germany Freiburg Architecture & engineering services

Buyer Universitätsklinikum Freiburg

Key facts

Published
Procedure
Negotiated procedure
  1. Published
View the official notice Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

Summary

Machine-generated summary

Planning services for the extension of a dermatology clinic, commissioned in stages according to service phases 1 to 8 based on the HOAI fee structure. The scope covers specialist planning for wastewater, drinking water and gas installations integrated into the existing building's network, heat supply systems connected to the existing heating distribution, ventilation and cooling systems including a central ventilation system for the seminar area and separate systems for WC areas, medical gas installations, and building automation. Planning must address fire protection requirements for timber hybrid construction, including tested fire seals and smoke extraction concepts. No basement is planned for ventilation plant rooms, requiring an alternative concept.

Description

Fachplanung, stufenweise beauftragt, die sich insgesamt auf die Leistungsphasen 1 - 8 in Anlehnung der HOAI beziehen. ALG 1 - Abwasser-, Wasser- und Gasanlagen ALG 2 - Wärmeversorgungsanlagen ALG 3 - Lufttechnische Anlagen ALG 7 - Nutzungsspezifische Anlagen (Medizinische Gase) ALG 8 - Gebäudeautomation ALG 1 - Abwasser-, Wasser- und Gasanlagen (HOAI § 53 Abs.2 Nr. 1) - Anbindung: Integration in bestehendes Trinkwassernetz des Bestandsgebäudes. - Hausanschluss: Planung HA-SW oder Einbindung in Bestandsleitungen. - Versorgung: TWK/TWW/SW-Versorgung für alle Verbraucher, inkl. Druckhaltung und Zirkulation. - Brandschutzbezug: Leitungsdurchführungen in Holzhybridwänden mit brandschutztechnisch geprüften Abschottungen (z.B. F30/F90, gemäß M-HolzBauRL und DIN?4102). ________________________________________ ALG 2 - Wärmeversorgungsanlagen (HOAI § 53 Abs. 2 Nr. 2) - Anbindung: Anschluss an bestehende Heizungsverteilung. - Verteilung: Heizkörperversorgung und Anbindung Lüftungsanlage. - Brandschutzbezug: Abschottungen an Wand-/Deckendurchführungen im Holzhybridbau gemäß Feuerwiderstandsklasse der Bauteile. ________________________________________ ALG 3 - Lufttechnische Anlagen (HOAI § 53 Abs. 2 Nr. 3) Kälte - Anbindung: Verbindung mit Kälteverteilung Bestand. - Versorgung: Kälte für definierte Räume und Lüftungsanlagen. - Brandschutzbezug: Durchdringungen der Holzbaukonstruktion mit feuerwiderstandsfähigen Kanaldurchführungen (Brandschutzklappen nach EN 15650). Lüftung - Seminarbereich: Zentrale Lüftungsanlage für Seminarbereich und Nebenräume. - AG-Vorgabe: Keine Unterkellerung für LüAR-Technikräume, alternatives Konzept erforderlich. - WC-Bereiche: Eigene Lüftungsanlage mit separatem Strang. - Brandschutzbezug: Lüftungssystem mit erhöhter Brand- und Rauchschutzanforderung wegen Holzhybridbau; Entrauchung und Brandabschnitte nach LüAR und M-HolzBauRL. ________________________________________ ALG 7 - Nutzungsspezifische Anlagen (Medizinische Gase) (HOAI § 53 Abs.2 Nr.7) - Anbindung: Integration in bestehendes O2-Netz. - Tank: Verlegung und Ertüchtigung des O2-Tanks. - Verbraucher: Versorgung Endverbraucher O2 gem. DIN EN ISO 7396-1. - Brandschutzbezug: Besondere Beachtung der Brandlastminimierung bei Leitungsführung im Holzhybridbau. ________________________________________ ALG 8 - Gebäudeautomation (HOAI § 53 Abs.2 Nr.8) - Anbindung: Integration in bestehende GLT. - Funktion: Steuerung/Regelung der Gewerke (Lüftung, Heizung, Kälte). - Integration: Bedienoberfläche, Energiemanagement, Betriebsdatenerfassung. - Brandschutzbezug: Automatisierte Brandfallsteuerung (z.B. Entrauchung, Abschaltung Lüftung, Meldung an BMA) im Kontext Holzhybridbau.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 6 days ago

Universitätsklinikum Freiburg

Germany

notices in the register
94
awards
38
awarded in total
€10.4M

Who wins its contracts

Many suppliers
different companies won its awards
27
of the awards went to the three most frequent winners
26%
of its calls state an estimated value
16%

Based on 34 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
3.9
of those lots received a single tender
18%
of the awards went to companies based in another country
3%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Awards most often to

  1. Philips GmbH 4 awards
  2. Siemens Healthineers AG 3 awards
  3. Ingenieurbüro Wörtz Part mbB 2 awards €46,687

3 open tenders right now

Market context

open now in Architecture & engineering services
7,868
median open notice
€292,316

Who wins in this market

Many suppliers

Germany · Architecture & engineering services

different companies won awards here
6,986
of the awards went to the three most frequent winners
3%
buyers awarded contracts here
3,448

Based on 12,358 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.5
of those lots received a single tender
11%
of the awards went to companies based in another country
1%
of the tenders came from another country
5%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

590 new notices in Architecture & engineering services in Germany in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Technical planning services: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language