Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 1 day ago Contract award

Deutschland - Baustellenüberwachung - Bauüberwachung, Beratungs- und Projektmanagementtätigkeiten für Bauleistungen beim Lüftergebäude

Awarded Germany Braunschweig Architecture & engineering services

Buyer Bundesgesellschaft für Endlagerung mbH (BGE)

€426,000 awarded value

Key facts

Awarded
Procedure
Open procedure
  1. Awarded
  2. Published
  3. Contract ends, estimated April 2028
View the official notice Watch this tender

This contract runs about 20 months, so it is back on the market around April 2028. Log in

Awarded to

ibd Projektmanagement und Fabrikplanung GmbH & Co. KG

Awarded value
€426,000
Award date
Bid received
1 A single tender
Record with this buyer
1 first contract from this buyer in the register
Back on the market
Apr 2028 How we know

When this contract comes back

estimated from the stated duration

This contract runs about 20 months, so it is back on the market around April 2028.

Every contract expiring, on the radar

Description

Im Rahmen der Errichtung des Endlagers Konrad durch die Bundesgesellschaft für Endlagerung mbH (BGE) wird das Lüftergebäude (ZTE) errichtet. Für die Errichtung der übertägigen Anlagen innerhalb des ZTE sind zur Unterstützung des Auftraggebers fachtechnische Bauüberwachung- und Projektmanagementtätigkeiten für die Herstellung des Gebäudes und der Anlagentechnik auf Konrad 2 erforderlich.

Terms of the procedure

How tenders are scored
Preis 100% Zuschlagskriterium: 100 percent

As the official notice states them.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 day ago

What this buyer has paid before

Based on 10 comparable contracts this buyer awarded in this sector over the last 4 years.

This award
€426,000
Median award
€581,582
Middle half of past awards
€281,150 to €2.8M

The award sits inside the usual range.

Most recent awards

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Bundesgesellschaft für Endlagerung mbH (BGE)

Germany

notices in the register
169
awards
54
awarded in total
€98.6M

Who wins its contracts

Many suppliers
different companies won its awards
44
of the awards went to the three most frequent winners
9%
of its calls state an estimated value
1%

Based on 45 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

of the awards went to companies based in another country
5%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Awards most often to

  1. BPS International GmbH 2 awards €1.1M
  2. dechant hoch- und ingenieurbau gmbh 1 award €20.0M
  3. BEMO Tunnelling GmbH 1 award €17.4M

12 open tenders right now

Market context

open now in Architecture & engineering services
7,761
median open notice
€300,000

Who wins in this market

Many suppliers

Germany · Architecture & engineering services

different companies won awards here
6,839
of the awards went to the three most frequent winners
3%
buyers awarded contracts here
3,456

Based on 12,387 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.5
of those lots received a single tender
11%
of the awards went to companies based in another country
1%
of the tenders came from another country
5%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Procedure facts

  • A single tender was received (open procedure).

Facts that procurement researchers and journalists track across public records. None of them is evidence of wrongdoing: each has ordinary explanations, such as a specialised market, an urgent need or a short list of qualified suppliers.

Similar tenders

Open now

Awarded before

Never miss a tender like this

564 new notices in Architecture & engineering services in Germany in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Construction-site supervision services: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language