The Aperlena Verdict
Open raceNo supplier dominates: 14 different companies have won the last 14 comparable contracts from this buyer over 5 years. This is a genuinely open race.
Based on 14 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryThe town of Ennigerloh intends to build a replacement for the Olympic pool at the Stavernbusch site, where the natural open-air pool is already located. This contract covers dry construction works. The scope includes around 650 m2 of suspended ceilings in various designs: about 107 m2 of mineral fibre grid ceilings in the staff area, around 224 m2 of cement-bound wet-room ceilings, mostly with C5 substructures, about 190 m2 of silver fir acoustic panel ceilings in the changing and sanitary area, around 59 m2 of larch wooden slat ceilings with acoustic lining in the foyer, about 71 m2 of wood wool acoustic ceilings plus roughly 9 m2 of ceiling valances, some 91 m2 of cement-bound板 linings (Q3) and about 270 m2 of gypsum board panelling on existing interior walls (Q3). Numerous cut-outs, reinforcements and access openings for lighting and building services are included, plus one round HPL cladding about 2.10 m in diameter, substructures, edge connections, work and installation planning and documentation. Substructures in the pool, entrance and changing areas require increased C5 corrosion protection.
Description
Terms of the procedure
- How tenders are scored
- Niedrigster Angebotspreis
- Small firms
- The buyer does not mark this procedure as suitable for small and medium-sized firms.
- Tenders go to
- dtvp.de/Satellite/notice/CXP4Y62MWRB
As the official notice states them.
Bid or no-bid?
Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.
Can I bid?
- Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
- The notice is written in German.
- Certificates from another EU country? Check the equivalents on eCertis
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 13 hours ago
What this buyer has paid before
Based on 14 comparable contracts this buyer awarded in this sector over the last 4 years.
- Median award
- €525,072
- Middle half of past awards
- €208,323 to €663,649
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.
Most recent awards
- Bauarbeiten für Schwimmbäder - Technische Dämmung / Ersatzneubau Hallenbad Ennigerloh €101,406
- Bauarbeiten für Schwimmbäder - Gebäudeleittechnik, MSR-Anlagen / Ersatzneubau Hallenbad Ennigerloh €669,843
- Bauarbeiten für Schwimmbäder - Wärmeversorgung, Wärmeerzeugung / Ersatzneubau Hallenbad Ennigerloh €620,878
- Bauarbeiten für Schwimmbäder - Elektroinstallation, Beleuchtung, Informationstechnik / Ersatzneubau Hallenbad Ennigerloh €1,147,591
- Bauarbeiten für Schwimmbäder - Alu-Glasfassade, Innenfass., Fensterbau / Ersatzneubau Hallenbad Ennigerloh €367,860
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileStadt Ennigerloh
- notices in the register
- 40
- awards
- 15
- awarded in total
- €8.7M
Who wins its contracts
Many suppliers- different companies won its awards
- 14
- of the awards went to the three most frequent winners
- 21%
- of its calls state an estimated value
- 0%
Based on 14 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 5.3
- of those lots received a single tender
- 9%
- of the awards went to companies based in another country
- 0%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| Fechtelkord & Eggersmann GmbH | 1 | €2.4M | Aug 2025 |
| Elektro Beckhoff GmbH | 1 | €1.1M | Jan 2026 |
| Zimmerei Heggemann GmbH | 1 | €1.1M | Dec 2025 |
| HERMES Systeme GmbH | 1 | €669,843 | Feb 2026 |
| Bernemann GmbH | 1 | €645,066 | Aug 2025 |
Based on 14 awards with a linked company profile over the last 5 years.
6 open tenders right now
- Swimming pool construction works - Screed, sealing, tiling and interior plastering works / Replacement construction of the Ennigerloh indoor pool 28 days left
- Swimming pool construction works - Locksmith and metal construction works / Replacement indoor pool Ennigerloh 28 days left
- Bauarbeiten für Schwimmbäder - Edelstahlarbeiten / Ersatzneubau Hallenbad Ennigerloh 28 days left
Market context
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.
- open now in Construction work
- 20,053
- median open notice
- €531,153
Who wins in this market
Many suppliersGermany · Construction work
- different companies won awards here
- 12,328
- of the awards went to the three most frequent winners
- 1%
- buyers awarded contracts here
- 2,985
Based on 27,178 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 6.3
- of those lots received a single tender
- 7%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 1%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Open elsewhere in Europe
Matched by meaning across languages, from the notices' own words: the same kind of contract, open now in another country.
Awarded before
Never miss a tender like this
1,841 new notices in Construction work in Germany in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Construction work for swimming pool: an email when new tenders arrive under it, no account needed.