Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 1 day ago Contract notice

Germany - Railway construction works - Cable civil works for the electronic interlocking, new construction of Track 5 including overhead line, track and switch renewal at Schönefeld

Original Deutschland - Bauarbeiten für Eisenbahnlinien - Kabeltiefbau ESTW, Neubau Gleis 5 inkl. OLA, Gleis- und Weichenerneuerung Schönefeld

Open Germany Brandenburg Construction work

Buyer DB InfraGO AG - Geschäftsbereich Fahrweg (Bukr 16)

21 days left

Key facts

Closes
11:00 (UTC+1)
Competition
Open race
  1. Published
  2. Today
  3. Deadline open for 40 days
  4. Awarded pending

Bidding window

39 days from publication to deadline

Usual length

Notices of this kind (Germany, open procedure, above the EU threshold) give a median of 31 days, half of them between 28 and 34 days, based on 84,922 notices of the last two years.

This buyer usually gives 29 days (median of its last 1,185 calls for tender).

View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

The Aperlena Verdict

Open race

No supplier dominates: 241 different companies have won the last 608 comparable contracts from this buyer over 5 years. This is a genuinely open race.

Based on 608 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.

Summary

Machine-generated summary

Construction works for the Schönefeld 2027/28 project, comprising the new electronic interlocking ESTW-A Schönefeld (BFHS), a new Track 5, and track and switch renewal. The works are split into three lots: Lot 1 track construction and cable civil works; Lot 2 interlocking equipment and Track 5; Lot 3 overhead line. The new Track 5 has a usable length of 740 m and 4 new switches, and will be reactivated and commissioned together with the interlocking. At the same time, 8 switches and around 2.5 km of track will be renewed at Schönefeld station. The scope also includes insulated joint removal, platform edge adjustment, interlocking cabling, power supply, low-level track-area lighting, extension of the electric switch heating system and overhead line works. The interlocking is a prerequisite for the ETCS equipment of the Erkner-Seddin corridor, which is not part of this construction measure.

Description

Bauleistung für den Komplex Schönefeld 2027/28 bestehend aus dem Neubau ESTW-A Schönefeld (BFHS), Neubau Gleis 5, Gleis- und Weichenerneuerung. Los 1: Oberbau & Kabeltiefbau Los 2: Ausrüstungstechnik ESTW & Gleis 5 Los 3: OLA Das ESTW Schönefeld ist Voraussetzung für die ETCS-Ausrüstung im Korridor Erkner-Seddin. Die ETCS-Ausrüstung ist jedoch NICHT Bestandteil dieser Baumaßnahme. Das Gleis 5 (740m Nutzlänge, 4 neue Weichen) wird reaktiviert und gemeinsam mit dem ESTW in Betrieb genommen. Zeitgleich werden im Bahnhof Schönefeld 8 Weichen und ca. 2,5km Gleis erneuert. 2,5km Gleiserneuerung, 8 Weichenerneuerungen, 4 Neubau-Weichen, ein Neubau-Gleis 740m Nutzlänge, Ausbau Iso-Stöße, Anpassung Bahnsteigkante; Kabelarbeiten ESTW, Stromversorgung ESTW, Neubau niedrige Gleisgassenbeleuchtung, Erweiterung elektr. Weichenheizanlage; Erweiterung OLA für Neubau Gleis 5, NEA-OLA für ESTW

3 lots

Lot 1
Oberbau & Kabeltiefbau
Lot 2
Ausrüstungstechnik ESTW & Gleis 5
Lot 3
Oberleitung
How tenders are scored
Preis: 100 percent
Small firms
The buyer does not mark this procedure as suitable for small and medium-sized firms.

As the official notice states them.

Bid or no-bid?

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. In your favour:

    Do we meet every eligibility criterion?

    Open procedure: any interested supplier may submit a bid.

    Above the EU threshold: open to companies from any EU country.

  2. Your call:

    Can we deliver this with the team we have?

    The register holds nothing on this. The official documents will.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Construction work.

  4. In your favour:

    Is the deadline realistic for a proper offer?

    21 days left, 15 of them working days.

  5. Your call:

    Is there a margin at the likely winning price?

    This buyer usually awards this kind of contract for between €704,025 and €8.1M.

  6. In your favour:

    Do we know this buyer?

    241 different companies won the last 608 comparable contracts.

Can I bid?

  • Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
  • The notice is written in German.
  • Certificates from another EU country? Check the equivalents on eCertis

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 day ago

What this buyer has paid before

Based on 106 comparable contracts this buyer awarded in this sector over the last 4 years.

Median award
€4.4M
Middle half of past awards
€704,025 to €8.1M

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.

Most recent awards

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

DB InfraGO AG - Geschäftsbereich Fahrweg (Bukr 16)

Germany

notices in the register
6,263
awards
4,282
awarded in total
€3.8B

Who wins its contracts

Many suppliers
different companies won its awards
697
of the awards went to the three most frequent winners
22%
of its calls state an estimated value
1%

Based on 1,712 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
3.8
of those lots received a single tender
15%
of the awards went to companies based in another country
3%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Who usually wins this buyer's contracts in this sector

Company Wins Total awarded Last win
DB Bahnbau Gruppe GmbH 37 €704,025 Sep 2026
LEONHARD WEISS GmbH & Co. KG 21 Aug 2026
SPITZKE SE 20 Oct 2026
STRABAG Rail GmbH 18 Aug 2026
Eiffage Infra-Rail GmbH 16 Aug 2026

Based on 608 awards with a linked company profile over the last 5 years.

193 open tenders right now

Market context

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.

open now in Construction work
19,935
median open notice
€547,553

Who wins in this market

Many suppliers

Germany · Construction work

different companies won awards here
12,328
of the awards went to the three most frequent winners
1%
buyers awarded contracts here
2,985

Based on 27,178 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
6.3
of those lots received a single tender
7%
of the awards went to companies based in another country
1%
of the tenders came from another country
1%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

1,819 new notices in Construction work in Germany in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Railway construction works: an email when new tenders arrive under it, no account needed.

21 days left

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language