The Aperlena Verdict
Open raceNo supplier dominates: 12 different companies have won the last 14 comparable contracts from this buyer over 5 years. This is a genuinely open race.
Based on 14 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryThe buyer is tendering trade 410, covering gas, water and wastewater installation systems, for construction work at the AKK facility at Bleickenallee 38 in Hamburg Altona. The existing 'Reha Aufstockung' building, partly with a basement and housing technical rooms, changing rooms and a rehabilitation facility on the ground floor, will be extended by three storeys. The first upper floor of the extension will house a partially stationary day clinic with diagnostic examination rooms, infusion rooms, a waiting area and supporting rooms. The extension is built in reinforced concrete with precast ceilings, an insulated facade and a green flat roof with photovoltaic modules. The work must proceed while hospital operations continue, with access via Lisztstrasse kept clear for emergency vehicles.
Description
Terms of the procedure
- How tenders are scored
- Preis: 100 percent
- Small firms
- The buyer marks this procedure as suitable for small and medium-sized firms.
- Tenders go to
- dtvp.de/Satellite/notice/CXP4YURMV5R
As the official notice states them.
Bid or no-bid?
Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.
Can I bid?
- Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
- The notice is written in German.
- Certificates from another EU country? Check the equivalents on eCertis
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 2 days ago
What this buyer has paid before
Based on 14 comparable contracts this buyer awarded in this sector over the last 4 years.
- Median award
- €119,340
- Middle half of past awards
- €52,570 to €230,289
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.
Most recent awards
- Construction work - Tender for roof waterproofing works - Main measure (trade 321B) for the new building of the AKK €412,242
- Construction work - Tender for wastewater facilities in outdoor areas (trade 551) for the new building of the AKK €31,781
- Construction works - Tender for thermal insulation composite systems WDVS (trade 323B) for the new building of the AKK €492,684
- Construction works - Tender for extended structural works (300B) for the new building of the AKK €3,052,860
- Bauarbeiten - Ausschreibung von Schloßer/ Stahlbauarbeiten (317) für den Neubau des AKK €151,846
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileAKK Altonaer Kinderkrankenhaus gGmbH
- notices in the register
- 46
- awards
- 16
- awarded in total
- €5.0M
Who wins its contracts
Moderately concentrated- different companies won its awards
- 12
- of the awards went to the three most frequent winners
- 36%
- of its calls state an estimated value
- 0%
Based on 14 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 4.3
- of those lots received a single tender
- 7%
- of the awards went to companies based in another country
- 0%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| HADI Haustechnik GmbH | 3 | €293,827 | Mar 2026 |
| Helmut Kallage Bauunternehmen GmbH | 1 | €3.1M | Sep 2026 |
| Easy Bau nevzat yildiz | 1 | €492,684 | Sep 2026 |
| Holl Flachdachbau GmbH & Co.KG | 1 | €412,242 | Sep 2026 |
| Jürgen Martens GmbH & Co. KG | 1 | €256,437 | Mar 2026 |
Based on 14 awards with a linked company profile over the last 5 years.
7 open tenders right now
- Construction works - Tender for electrical, telecommunications and information technology (Lot 440/450) for the new AKK building 13 days left
- Construction works - Insulation works on technical installations (trade 490) for the new AKK building 13 days left
- Construction works - Tender for ventilation systems (trade 430) for the new AKK building 14 days left
Market context
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.
- open now in Construction work
- 20,149
- median open notice
- €549,804
Who wins in this market
Many suppliersGermany · Construction work
- different companies won awards here
- 12,348
- of the awards went to the three most frequent winners
- 1%
- buyers awarded contracts here
- 2,989
Based on 27,245 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 6.3
- of those lots received a single tender
- 7%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 1%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Open elsewhere in Europe
Matched by meaning across languages, from the notices' own words: the same kind of contract, open now in another country.
Awarded before
Never miss a tender like this
1,817 new notices in Construction work in Germany in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Construction work: an email when new tenders arrive under it, no account needed.