Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 5 days ago Contract notice

Germany - Demolition of buildings and general demolition and earthworks - Demolition, dismantling, hazardous substance remediation

Original Deutschland - Abbruch von Gebäuden sowie allgemeine Abbruch- und Erdbewegungsarbeiten - Abbruch, Rückbau, Schadstoffsanierung

Open Germany Lüneburg Construction work

Buyer Stadtwerke Achim AG

€160,000 estimated value

Key facts

Published
Procedure
Negotiated procedure
  1. Published

TED - Tenders Electronic Daily (Publications Office of the EU) does not publish a closing date for this notice. See the official notice

View the official notice Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

Summary

Machine-generated summary

Demolition and remediation works for construction phase 3. The works cover the demolition of a three-storey flat-roofed building with a basement, built in 1978. As a head building, it is connected to the preserved central building via the ground floor and first floor. The facade consists of clinker brick with partial metal panels. Part of the basement will remain standing to carry the loads of the central building, and a separate demolition concept has been prepared for this. The existing building is contaminated with hazardous substances, described in the 2022 investigation report of the Bremer Umweltinstitut. Demolition, dismantling and remediation of a gross floor volume of approximately 2,500 m³.

Description

Abbruch- und Sanierungsmaßnahmen für Bauabschnitt 3 Der Bauabschnitt 3 umfasst den Abbruch eines dreigeschossigen Gebäudes mit Flachdach inklusive Keller aus dem Jahr 1978. Dieser ist als Kopfbau über das Erdgeschoss und 1.Obergeschoss mit dem zu erhaltenden Mittelbau verbunden. Das Gebäude hat eine Außenfassade aus Klinker sowie anteilig Metallfelder. Von dem Untergeschoss wird ein Teil stehen bleiben, um die Lasten aus dem Mittelbau abzufangen. Ein gesondertes Abbruchkonzept liegt dazu vor. Der Altbau ist mit Schadstoffen belastet, detailliertere Angaben dazu finden sich im Untersuchungsbericht des Bremer Umweltinstituts von 2022. Nähere Informationen sind in den jeweiligen Leistungsverzeichnissen bzw. den Plänen angegeben. Abbruch-, Rückbau und Schadstoffsanierung BGF - Ca. 2500 m³

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 5 days ago

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 2,000 awards for Construction work in Germany.

This notice
€160,000
Median award
€274,906
Middle half of past awards
€118,863 to €717,961

The estimate sits inside the usual range.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Stadtwerke Achim AG

Germany

notices in the register
21
award
1

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

This buyer has no award history in this sector yet. Usual winners, Construction work - Germany

Company Wins Total awarded Last win
Fliesen Röhlich GmbH 96 €15.6M Oct 2026
Lindner SE 89 €155.8M Sep 2026
LEONHARD WEISS GmbH & Co. KG 80 €183.0M Sep 2026
STRABAG AG 70 €162.7M Oct 2026
KONE GmbH 66 €16.6M Sep 2026

Based on 27123 awards with a linked company profile over the last 2 years.

13 open tenders right now

Market context

Larger than 22% of the open notices in Construction work across Europe.

open now in Construction work
29,727
median open notice
€783,629

Who wins in this market

Many suppliers

Germany · Construction work

different companies won awards here
12,813
of the awards went to the three most frequent winners
1%
buyers awarded contracts here
2,980

Based on 27,123 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
6.3
of those lots received a single tender
7%
of the awards went to companies based in another country
1%
of the tenders came from another country
1%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

1,813 new notices in Construction work in Germany in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Building demolition and wrecking work and earthmoving work: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language