Przejdź do treści
Aperlena

Ireland - Architectural, construction, engineering and inspection services - UCC Kane Science Building Redevelopment - Construction Consultancy Team - Prequalification Stage

Udzielony Ogłoszenie o udzieleniu zamówienia Nie opublikowano terminu
Obserwuj ten przetarg

Napiszemy, jeśli zmieni się termin lub pojawi się sprostowanie. Za darmo. Zaloguj się

  1. Udzielony
  2. Opublikowano

Opis

This tender is to appoint an Architect led Construction Consultancy Team for UCC Kane Science Building Redevelopment . This stage involves the shortlisting of Candidates on the basis of the selection criteria set out in this document. The intention is that a maximum of Six Candidates will be shortlisted and invited to the Tender Stage of the competition. The successful tenderer will be required to provide the full range of consultancy services for the delivery of the Contract including but not limited to the following a) Architectural Services (including DAC, Planning and Landscaping Design Services), b) Civil,Structural Engineering Services (including Transport, Mobility, Environmental and Façade Engineering Services)c) Fire Engineering Services d) Mechanical and Electrical Engineering Services (Including BREEAM, Sustainability Specialist and Process Engineering), e)Project Supervisor Design Process (PSDP), f)Employers Representative (Dedicated Role) g)Information Manager. Note Quantity Surveying Services will be by separate appointment by UCC . The existing Kane Science Building is a multi storey building consisting of 5 floors above ground, including plant area and 1 basement level below ground. The total floor area of the building is circa 14,150 sq m.The Kane Science Building, located centrally on the main campus of University College Cork (UCC), has been the heart of Science, Technology, Engineering and Mathematics (STEM) in Cork since 1971. The Kane Science Building opened in 1971 and, despite some localised refurbishment over the last 50 years, is in need of urgent and significant investment in its fabric and core infrastructure.The refurbishment of the Kane Science Building is identified as a key priority in the University’s Strategic Plan 2023 to 2028 Securing our Future.The primary purpose for the Kane Science Building Refurbishment is to reduce the energy consumed and emissions by the current building and services, to repurpose areas, to upgrade selected areas, and to extend the life of an existing building.

Oficjalne źródło

Źródło: TED - Tenders Electronic Daily (Publications Office of the EU)

Zawsze weryfikuj szczegóły w oficjalnym ogłoszeniu.

Ostatnia weryfikacja w TED - Tenders Electronic Daily (Publications Office of the EU) 3 dni temu

Więcej od tego zamawiającego

Pełny profil zamawiającego

3 otwarte przetargi w tej chwili

Ostatnie udzielenia

Podobne przetargi

Kontekst rynkowy

Śr. otwarty przetarg · Usługi architektoniczne i inżynieryjne
9 170 195 €
15 547 otwartych teraz w Europie 70% poniżej średniej sektora
Historia zamawiającego w Aperlena
487 zarejestrowanych ogłoszeń · 375 udzielonych
143 996 730 € w udzielonych zamówieniach

Nie przegap przetargów takich jak ten

Otrzymuj e-mail o nowych przetargach: Usługi architektoniczne i inżynieryjne · Irlandia. Za darmo.

Ustaw mój alert

Skróty klawiszowe

Przeglądaj listę bez sięgania po mysz. Skróty nie działają podczas pisania w polu.

j
Następny wynik
k
Poprzedni wynik
Enter
Otwórz wynik
n
Następna strona
p
Poprzednia strona
c
Porównaj ten wynik
s
Dodaj ten wynik do krótkiej listy
/
Przejdź do pola wyszukiwania
?
Pokaż te skróty
Esc
Zamknij