Ireland - Architectural, construction, engineering and inspection services - UCC Kane Science Building Redevelopment - Construction Consultancy Team - Prequalification Stage

Aggiudicata Avviso di aggiudicazione Nessuna scadenza pubblicata
Segui questa gara

Ti scriviamo se cambia la scadenza o esce una rettifica. Gratis. Accedi

  1. Aggiudicata
  2. Pubblicata

Descrizione

This tender is to appoint an Architect led Construction Consultancy Team for UCC Kane Science Building Redevelopment . This stage involves the shortlisting of Candidates on the basis of the selection criteria set out in this document. The intention is that a maximum of Six Candidates will be shortlisted and invited to the Tender Stage of the competition. The successful tenderer will be required to provide the full range of consultancy services for the delivery of the Contract including but not limited to the following a) Architectural Services (including DAC, Planning and Landscaping Design Services), b) Civil,Structural Engineering Services (including Transport, Mobility, Environmental and Façade Engineering Services)c) Fire Engineering Services d) Mechanical and Electrical Engineering Services (Including BREEAM, Sustainability Specialist and Process Engineering), e)Project Supervisor Design Process (PSDP), f)Employers Representative (Dedicated Role) g)Information Manager. Note Quantity Surveying Services will be by separate appointment by UCC . The existing Kane Science Building is a multi storey building consisting of 5 floors above ground, including plant area and 1 basement level below ground. The total floor area of the building is circa 14,150 sq m.The Kane Science Building, located centrally on the main campus of University College Cork (UCC), has been the heart of Science, Technology, Engineering and Mathematics (STEM) in Cork since 1971. The Kane Science Building opened in 1971 and, despite some localised refurbishment over the last 50 years, is in need of urgent and significant investment in its fabric and core infrastructure.The refurbishment of the Kane Science Building is identified as a key priority in the University’s Strategic Plan 2023 to 2028 Securing our Future.The primary purpose for the Kane Science Building Refurbishment is to reduce the energy consumed and emissions by the current building and services, to repurpose areas, to upgrade selected areas, and to extend the life of an existing building.

Fonte ufficiale

Fonte: TED - Tenders Electronic Daily (Publications Office of the EU)

Verifica sempre i dettagli nell'avviso ufficiale.

Ultima verifica su TED - Tenders Electronic Daily (Publications Office of the EU) 2 giorni fa

Altro da questo committente

Profilo completo del committente

3 gare aperte in questo momento

Aggiudicazioni recenti

Gare simili

Contesto di mercato

Gara aperta media · Servizi di architettura e ingegneria
9.314.515 €
15.389 aperte ora in Europa 70% sotto la media del settore
Storico della stazione appaltante su Aperlena
487 avvisi tracciati · 375 aggiudicati
143.996.730 € in contratti aggiudicati

Non perderti nessuna gara come questa

Ricevi un'email per le nuove gare: Servizi di architettura e ingegneria · Irlanda. Gratis.

Crea il mio avviso

Scorciatoie da tastiera

Scorri un elenco senza toccare il mouse. Le scorciatoie restano inattive mentre scrivi in un campo.

j
Risultato successivo
k
Risultato precedente
Invio
Apri il risultato
n
Pagina successiva
p
Pagina precedente
c
Confronta questo risultato
s
Aggiungi questo risultato alla shortlist
/
Vai al campo di ricerca
?
Mostra queste scorciatoie
Esc
Chiudi