Aller au contenu
Aperlena

Ireland - Architectural, construction, engineering and inspection services - UCC Kane Science Building Redevelopment - Construction Consultancy Team - Prequalification Stage

Attribué Avis d'attribution Aucune date limite publiée
Suivre ce marché

Nous vous écrivons si la date limite change ou si un rectificatif est publié. Gratuit. Se connecter

  1. Attribué
  2. Publié

Description

This tender is to appoint an Architect led Construction Consultancy Team for UCC Kane Science Building Redevelopment . This stage involves the shortlisting of Candidates on the basis of the selection criteria set out in this document. The intention is that a maximum of Six Candidates will be shortlisted and invited to the Tender Stage of the competition. The successful tenderer will be required to provide the full range of consultancy services for the delivery of the Contract including but not limited to the following a) Architectural Services (including DAC, Planning and Landscaping Design Services), b) Civil,Structural Engineering Services (including Transport, Mobility, Environmental and Façade Engineering Services)c) Fire Engineering Services d) Mechanical and Electrical Engineering Services (Including BREEAM, Sustainability Specialist and Process Engineering), e)Project Supervisor Design Process (PSDP), f)Employers Representative (Dedicated Role) g)Information Manager. Note Quantity Surveying Services will be by separate appointment by UCC . The existing Kane Science Building is a multi storey building consisting of 5 floors above ground, including plant area and 1 basement level below ground. The total floor area of the building is circa 14,150 sq m.The Kane Science Building, located centrally on the main campus of University College Cork (UCC), has been the heart of Science, Technology, Engineering and Mathematics (STEM) in Cork since 1971. The Kane Science Building opened in 1971 and, despite some localised refurbishment over the last 50 years, is in need of urgent and significant investment in its fabric and core infrastructure.The refurbishment of the Kane Science Building is identified as a key priority in the University’s Strategic Plan 2023 to 2028 Securing our Future.The primary purpose for the Kane Science Building Refurbishment is to reduce the energy consumed and emissions by the current building and services, to repurpose areas, to upgrade selected areas, and to extend the life of an existing building.

Source officielle

Source : TED - Tenders Electronic Daily (Publications Office of the EU)

Vérifiez toujours les détails dans l'avis officiel.

Dernière vérification auprès de TED - Tenders Electronic Daily (Publications Office of the EU) il y a 4 jours

Plus de cet acheteur

Profil complet de l'acheteur

2 marchés ouverts actuellement

Attributions récentes

Marchés similaires

Contexte de marché

Appel ouvert moyen · Services d'architecture & d'ingénierie
9 389 483 €
15 527 ouverts en Europe actuellement 71% en dessous de la moyenne du secteur
Historique de l'acheteur sur Aperlena
487 avis suivis · 375 attribués
143 996 730 € de contrats attribués

Ne manquez plus aucun marché comme celui-ci

Recevez un e-mail pour les nouveaux marchés : Services d'architecture & d'ingénierie · Irlande. Gratuit.

Créer mon alerte

Raccourcis clavier

Parcourir une liste sans toucher la souris. Les raccourcis restent inactifs pendant la saisie dans un champ.

j
Résultat suivant
k
Résultat précédent
Entrée
Ouvrir le résultat
n
Page suivante
p
Page précédente
c
Comparer ce résultat
s
Ajouter ce résultat à la présélection
/
Aller au champ de recherche
?
Afficher ces raccourcis
Échap
Fermer