Saltar al contenido
Aperlena

Ireland - Architectural, construction, engineering and inspection services - UCC Kane Science Building Redevelopment - Construction Consultancy Team - Prequalification Stage

Adjudicada Adjudicación de contrato Sin fecha límite publicada
Vigilar esta licitación

Te escribimos si cambia el plazo o se publica una corrección. Gratis. Iniciar sesión

  1. Adjudicada
  2. Publicada

Descripción

This tender is to appoint an Architect led Construction Consultancy Team for UCC Kane Science Building Redevelopment . This stage involves the shortlisting of Candidates on the basis of the selection criteria set out in this document. The intention is that a maximum of Six Candidates will be shortlisted and invited to the Tender Stage of the competition. The successful tenderer will be required to provide the full range of consultancy services for the delivery of the Contract including but not limited to the following a) Architectural Services (including DAC, Planning and Landscaping Design Services), b) Civil,Structural Engineering Services (including Transport, Mobility, Environmental and Façade Engineering Services)c) Fire Engineering Services d) Mechanical and Electrical Engineering Services (Including BREEAM, Sustainability Specialist and Process Engineering), e)Project Supervisor Design Process (PSDP), f)Employers Representative (Dedicated Role) g)Information Manager. Note Quantity Surveying Services will be by separate appointment by UCC . The existing Kane Science Building is a multi storey building consisting of 5 floors above ground, including plant area and 1 basement level below ground. The total floor area of the building is circa 14,150 sq m.The Kane Science Building, located centrally on the main campus of University College Cork (UCC), has been the heart of Science, Technology, Engineering and Mathematics (STEM) in Cork since 1971. The Kane Science Building opened in 1971 and, despite some localised refurbishment over the last 50 years, is in need of urgent and significant investment in its fabric and core infrastructure.The refurbishment of the Kane Science Building is identified as a key priority in the University’s Strategic Plan 2023 to 2028 Securing our Future.The primary purpose for the Kane Science Building Refurbishment is to reduce the energy consumed and emissions by the current building and services, to repurpose areas, to upgrade selected areas, and to extend the life of an existing building.

Fuente oficial

Fuente: TED - Tenders Electronic Daily (Publications Office of the EU)

Verifica siempre los detalles en el anuncio oficial.

Última verificación con TED - Tenders Electronic Daily (Publications Office of the EU) hace 4 días

Más de este comprador

Perfil completo del comprador

2 licitaciones abiertas ahora mismo

Adjudicaciones recientes

Licitaciones similares

Contexto de mercado

Licitación abierta media · Servicios de arquitectura e ingeniería
9.482.496 €
15.411 abiertas ahora en Europa 71% por debajo de la media del sector
Historial del comprador en Aperlena
489 anuncios registrados · 376 adjudicados
143.996.730 € en contratos adjudicados

No te pierdas ninguna licitación como esta

Recibe un email con las nuevas licitaciones de: Servicios de arquitectura e ingeniería · Irlanda. Gratis.

Crear mi alerta

Atajos de teclado

Recorre una lista sin tocar el ratón. Los atajos no actúan mientras escribes en un campo.

j
Resultado siguiente
k
Resultado anterior
Intro
Abrir el resultado
n
Página siguiente
p
Página anterior
c
Comparar este resultado
s
Añadir este resultado a la lista corta
/
Ir al cuadro de búsqueda
?
Mostrar estos atajos
Esc
Cerrar