Skip to content
Aperlena

Weyside Urban Village - Phase 4 Enabling Works and Infrastructure

Upcoming Prior information notice No deadline published
Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

Summary

Machine-generated summary

Guildford Borough Council is procuring works for Phase 4 of the Weyside Urban Village regeneration programme in Guildford (Slyfield area, GU1 1QG), on land of the existing Thames Water sewage treatment works. Two contracts are planned: enabling works covering demolition of the existing sewage treatment works, vegetation clearance, topsoil stripping, archaeological, ground and topographic investigations; and main contract works covering remediation, site platform creation, drainage, attenuation basins, utilities, highways, street lighting and connections. Contracts will use a JCT 24 Standard Contract with employer amendments, with the contractor providing Principal Designer services post contract. Procurement of the enabling works is planned to commence in September 2026, with contract award in May 2027 and start on site in November 2027. No estimated value is stated.

Description

The Project: • Works packages form part of the wider 'Weyside Urban Village' (WUV) programme, delivering c. 1,550 dwellings; local centre comprising retail, healthcare, community, and nursery; flexible community facilities; flexible employment space; new Council Depot; and associated road infrastructure, landscaping, and amenity space. • Current Works already underway or completed are Phase 2 Infrastructure works, Phase 1-3 Infrastructure works, Off Site Highways works, New Council Depot and the relocation of the Sewerage Treatment Works. Location • Area named Ph 4, Weyside Urban Village (Slyfield regeneration Programme), land of existing Thames Water Sewage Treatment facilities, Guildford, GU1 1QG. Description of works • The works for this area involves two separate contracts, relating to the Weyside Urban Village, Phase 4. The Works under each contract comprise of: Ph 4 Enabling Works Package Scope: • Demolition of the existing sewage treatment works (ESTW) • Vegetation clearance and tree felling • Topsoil stripping • Archaeological Investigations • Ground Investigation Works • Other Necessary surveys and investigations i.e. topographic survey Contract: Let Under a JCT 24 Standard Contract (with Employers amendments) based on the Employers Requirements Contractor to provide 'post contract' Principal Designer's services. Programme dates: Enabling Works Agree Contracting & Procurement Strategy Aug 26 Commence procurement of Enabling Works Sept 26 Enter into Contract for Enabling Works May 27 Start on Site Nov 27 Ph 4 Main Contract Works Package Scope: • Sitewide remediation of contamination • Site platform creation and levelling • Drainage infrastructure, pipework, manholes, attenuation tanking, petrol interceptors • Swales and attenuation basins (including any landscaping) • Utility infrastructure, ducting, chambers, pipework • Highway formations - extent of roads • Street lighting • Phase 2 SMC /Slyfield connection • Non-Motorised User (NMU) • S278 Junction Works • Other Necessary surveys and investigations Contract: Let Under a JCT 24 D&B Contract (with Employers amendments) based on the Employers Requirements Contractor to provide 'post contract' Principal Designer's services. Programme dates: Main Contract Agree Contracting & Procurement Strategy Aug 26 Commence procurement of Main Contract Works Mar 27 Enter into Main Works Contract Mar 28 Receive ground investigation information from Enabling Works contract to firm up PS From June 28

Official source

Source: Find a Tender Service (UK Cabinet Office / Crown Commercial Service)

Always verify details on the official notice.

Last verified against Find a Tender Service (UK Cabinet Office / Crown Commercial Service) 1 month ago

Documents on Find a Tender Service (UK Cabinet Office / Crown Commercial Service) (English)

More from this buyer

Full buyer profile

2 open tenders right now

This buyer has no award history in this sector yet. Usual winners, Construction work - United Kingdom

Company Wins Total awarded Last win
Tarmac Trading Limited 27 €37.9M Aug 2026
HOLCIM UK LIMITED 27 €28.8M Aug 2026
LINDUM GROUP LIMITED 14 €28.7M Jul 2026
FM Conway Ltd 14 €22.3M Jul 2026
THOMAS BOW LTD 12 €4.0M Aug 2026

Based on 670 awards with a linked company profile over the last 2 years.

Similar tenders

Market context

Avg. open tender · Construction work
€33,464,336
30,404 open across Europe right now
Buyer track record on Aperlena
6 notices tracked · 3 awarded

Never miss a tender like this

149 new notices in Construction work in United Kingdom in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close