The Aperlena Verdict
Open raceNo supplier dominates: 74 different companies have won the last 220 comparable contracts from this buyer over 5 years. This is a genuinely open race.
Based on 220 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryThe works aim to maintain and secure the function of the Northern Main Line through the Bollnäs operating site, a key part of the Swedish rail network carrying both freight and passenger trains. At Bollnäs the double track becomes single track northwards and the single-track line towards Edsbyn-Furudal connects at the site. The existing track sections are in poor condition and pose traffic and safety risks. The works include installing 17 new switches, demolishing existing ones and repositioning them as the site is extended southwards, demolishing about 2,000 metres of track and laying about 2,000 metres of new track. Cables, signalling, electrical power, overhead line and civil installations will be adapted to the switch relocation and track renewal.
Description
Terms of the procedure
- How tenders are scored
- Price
As the official notice states them.
Bid or no-bid?
Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.
Can I bid?
- Negotiated procedure: the buyer negotiates the terms with the suppliers it admits. Above the EU threshold: open to companies from any EU country.
- The notice is written in Swedish.
- Certificates from another EU country? Check the equivalents on eCertis
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 3 days ago
Expected award price
- likely award for this notice, from its published estimate of €7,163,644
- €5.9M to €8.7M
This buyer's comparable awards in this sector came in at a median of 100% of their published estimate, half of them between 82% and 121%, based on 28 awards of the last 3 years.
Each award is compared with the estimate of the same lots, framework agreements excluded. A published estimate may include options and renewals, so an award under it is not always a discount.
What this buyer has paid before
Based on 216 comparable contracts this buyer awarded in this sector over the last 4 years.
- This notice
- €7.2M
- Median award
- €5.8M
- Middle half of past awards
- €2.6M to €15.5M
The estimate sits inside the usual range.
Most recent awards
- Sverige - Diverse entreprenader inom särskilda fackområden - Systemdemo nollutsläpp - Väg 168 Tjuvkil utförandeentreprenad €7,697,810
- Sverige - Bygg- och anläggningsarbeten: rörledningar, kommunikations- och kraftledningar, huvudvägar, vägar, flygplatser och järnvägar; mark- och grundarbeten - Markarydsbanan bdl 931, Knäred ny mötesstation, entreprenad UE €6,642,848
- Sverige - Byggnation av bro - Bro över Viskasundet i Fredrika #14257# €3,680,746
- Sverige - Anläggningsarbete - E-län väg 881 Ny GC-väg längs Djurövägen €5,887,853
- Sverige - Anläggningsarbete - OPTO 2.0 Entreprenad Hallsberg-Frövi, Östansjö-Skövde €4,403,734
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileTrafikverket Myndighet
- notices in the register
- 2,027
- awards
- 966
- awarded in total
- €6.3B
Who wins its contracts
Many suppliers- different companies won its awards
- 438
- of the awards went to the three most frequent winners
- 13%
- of its calls state an estimated value
- 99%
Based on 954 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 3.9
- of those lots received a single tender
- 19%
- of the awards went to companies based in another country
- 2%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| Svevia AB (publ) | 19 | €271.8M | Apr 2026 |
| NCC Industry Aktiebolag | 14 | €102.3M | Mar 2026 |
| Infrakraft Sverige AB | 13 | €552.7M | Aug 2026 |
| Peab Anläggning AB | 13 | €331.2M | Sep 2026 |
| Peab Asfalt AB | 11 | €55.6M | Mar 2026 |
Based on 220 awards with a linked company profile over the last 5 years.
115 open tenders right now
- Civil engineering consultancy services and construction services - Preparation of FFU for Bastuträsk-Skellefteå, AT conversion and 22 kV auxiliary power 1 day left
- Vehicle recovery - Recovery, lifting and scrapping of vehicles and wrecks - Central region NY 1 day left
- Clothing, footwear, bags and accessories - Workwear for Driving Test Operations 1 day left
Market context
Larger than 81% of the open notices in Construction work across Europe.
- open now in Construction work
- 19,844
- median open notice
- €564,179
Who wins in this market
Many suppliersSweden · Construction work
- different companies won awards here
- 678
- of the awards went to the three most frequent winners
- 7%
- buyers awarded contracts here
- 348
Based on 1,116 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 4.9
- of those lots received a single tender
- 8%
- of the awards went to companies based in another country
- 2%
- of the tenders came from another country
- 5%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Change history
Every time an official source republished this notice with different content. We watch every source we index, including regional copies of the same notice.
-
Read before bidding
- Estimated value
-
Was:
€7,101,957 - Now: €7,163,644 +1%
- Submission deadline
- not stated
- Now: October 14, 2026, 21:59
Follow this tender and we email you the moment it changes. Create account
Similar tenders
Open now
27
days left
€44,165,710
est. value
34
days left
€893,336
est. value
6
days left
€4,435,967
est. value
37
days left
€8,833,142
est. value
2
days left
€14,238,296
est. value
Awarded before
Never miss a tender like this
70 new notices in Construction work in Sweden in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Construction work for buildings relating to railway transport: an email when new tenders arrive under it, no account needed.