Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 3 days ago Contract notice

Finland - Installation of electricity distribution equipment - Rytisuo 110/20 kV substation contract

Original Suomi - Sähkönjakelulaitteiden asennustyöt - Rytisuon 110/20 kV sähköasemaurakka

Open Finland Pohjois- ja Itä-Suomi Construction work

Buyer Kajave Oy

€7.0M estimated value · €7,000,000

Key facts

Published
Procedure
Negotiated procedure
  1. Published

TED - Tenders Electronic Daily (Publications Office of the EU) does not publish a closing date for this notice. See the official notice

View the official notice Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

Summary

Machine-generated summary

Kajave is procuring the Rytisuo 110/20 kV substation as a design and build (KVR) contract and is inviting requests to participate in a forthcoming tender competition. The substation comprises a 110 kV air-insulated switchgear with two main busbars, busbar voltage transformers, an auxiliary busbar, two transformer bays, five cable feeder bays and a busbar circuit breaker bay, eight bays in total, plus a 20 kV double-busbar switchgear of 17 panels including a bus-tie panel and metering panels on both busbars. The substation building will house the 20 kV switchgear as well as control and protection equipment, and an earth fault current compensation system is included. The main transformers are not part of the contract, but their foundations, bunkers and connections are. The works cover all design, material and equipment procurement, earthworks, construction and installation, testing, commissioning and final documentation. The substation lies about 30 km southwest of Kajaani in the Otanmaki area and must be complete and operational by 30 November 2027.

Description

Kajave tulee hankkimaan KVR-hankintana Rytisuon 110/20 kV sähköaseman. Pyydämme osallistumishakemuksia tulevaan tarjouskilpailuun, jossa kyseinen sähköasemaurakka tullaan kilpailuttamaan. Hankinnan kohteena on Rytisuon 110/20 kV sähköasema, joka koostuu 110 kV avokytkinlaitoksesta, päämuuntajista, sekä 20 kV kojeistosta tarvittavine apujärjestelmineen ja rakennuksineen. 110 kV 2PK+AK kytkinlaitos käsittää kaksi pääkiskoa, kiskojännitemuuntajat pääkiskoille, apukiskon, kaksi muuntajakenttää, viisi kaapelilähtökenttää ja kiskokatkaisijakentän. 110 kV kytkilaitoksen laajuus on siten yhteensä kahdeksan kenttää. 20 kV kaksipääkiskokojeiston laajuus on yhteensä 17 kennoa sisältäen kiskokatkaisijakennon ja mittauskennot molemmille kiskoille. Sähköasemarakennukseen sijoitetaan 20 kV kojeiston lisäksi sähköaseman ohjaus- ja suojauslaitteet. Urakkaan sisältyy myös maasulkuvirran kompensointilaitteisto. Päämuuntajien hankinta ja toimitus eivät kuulu urakkaan, mutta muuntajaperustukset ja bunkkerit sekä muuntajien liittäminen pää- ja apujärjestelmiin kuuluvat urakkalaajuuteen. Urakan toimituslaajuuteen sisältyvät kaikki tarvitta suunnittelu, materiaali- ja laitehankinnat, maanrakennus-, rakennus- ja asennustyöt, koestus ja käyttöönotto sekä loppudokumentointi. Tarkempi työlaajuus ja sisältä määritellään tarjouspyyntöasiakirjoissa. Rakennettavan sähköaseman tulee olla valmis ja käyttöönotettuna 30.11.2027 mennessä. Rytisuon sähköasema sijoittuu noin 30 km Kajaanista lounaaseen Otanmäen alueelle.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 3 days ago

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 492 awards for Construction work in Finland.

This notice
€7.0M
Median award
€4.2M
Middle half of past awards
€614,725 to €10.3M

The estimate sits inside the usual range.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Kajave Oy

Finland

notices in the register
37
awards
20
awarded in total
€15.7M

Who wins its contracts

Many suppliers
different companies won its awards
12
of the awards went to the three most frequent winners
31%
of its calls state an estimated value
0%

Based on 13 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

of the awards went to companies based in another country
0%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

This buyer has no award history in this sector yet. Usual winners, Construction work - Finland

Company Wins Total awarded Last win
GRK Suomi Oy 15 €196.6M Jun 2026
Kreate Oy 12 €210.1M Aug 2026
VM Suomalainen Oy 11 €59.6M Jun 2026
Consti Korjausrakentaminen Oy 9 €546.3M Jul 2026
Caverion Suomi Oy 9 €61.6M Jun 2026

Based on 519 awards with a linked company profile over the last 2 years.

3 open tenders right now

Market context

Larger than 73% of the open notices in Construction work across Europe.

open now in Construction work
28,913
median open notice
€877,718

Who wins in this market

Many suppliers

Finland · Construction work

different companies won awards here
337
of the awards went to the three most frequent winners
7%
buyers awarded contracts here
200

Based on 519 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.5
of those lots received a single tender
5%
of the awards went to companies based in another country
1%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

665 new notices in Construction work in Finland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language