The Aperlena Verdict
Open raceNo supplier dominates: 20 different companies have won the last 24 comparable contracts from this buyer over 5 years. This is a genuinely open race.
- Expected final price vs the published estimate
- -0.1%
Based on 24 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryDARS, the Slovenian motorway company, is procuring construction design services for mechanical and electrical installations in buildings. The contract covers the preparation of concept solutions and an economic and technical analysis, together with DGD/DNZO documentation, for the construction of solar power plants on DARS facilities. This is the third phase of the project. The works are located in Slovenia.
Description
Terms of the procedure
- How tenders are scored
- Price: 80 points; Quality: 20 points
- Small firms
- The buyer marks this procedure as suitable for small and medium-sized firms.
As the official notice states them.
Bid or no-bid?
Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.
Can I bid?
- Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
- The notice is written in Slovenian.
- Certificates from another EU country? Check the equivalents on eCertis
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 17 hours ago
What this buyer has paid before
Based on 31 comparable contracts this buyer awarded in this sector over the last 4 years.
- Median award
- €544,604
- Middle half of past awards
- €299,158 to €1.9M
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.
Most recent awards
- Slovenija - Inženirske storitve - Strokovno svetovalne storitve s področja upravljanja in rednega vzdrževanja AC in HC v upravljanju DARS €2,190,500
- Slovenija - Arhitekturne, gradbeniške, inženirske in inšpekcijske storitve - Izvedba zunanje kontrole kakovosti pri izgradnji nove cestne povezave od priključka Velenje jug do priključka Slovenj Gradec (2. odsek) Sklopa C in G €1,698,043
- Slovenija - Storitve gradbenega projektiranja - Izdelava dela PZI projektne dokumentacije za sanacijo zahodne cevi avtocestnega predora Karavanke vključno s pripadajočo infrastrukturo in spremembe PZI v času gradnje €3,549,212
- Slovenija - Inženirske storitve - Izvajanje strokovno svetovalnih storitev za AC odsek Koseze - Kozarje (razširitev v šestpasovnico) za fazo izdelave projekta DGD in PZI €312,200
- Slovenija - Storitve spremljanja in nadzora - Izvedba zunanje kontrole kakovosti pri investicijah na obstoječih AC in HC, s svetovalnimi storitvami za obdobje 2026 - 2028 €3,997,736
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileDRUŽBA ZA AVTOCESTE V REPUBLIKI SLOVENIJI D.D.
- notices in the register
- 536
- awards
- 170
- awarded in total
- €1.3B
Who wins its contracts
Many suppliers- different companies won its awards
- 122
- of the awards went to the three most frequent winners
- 7%
- of its calls state an estimated value
- 19%
Based on 138 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 1.8
- of those lots received a single tender
- 39%
- of the awards went to companies based in another country
- 2%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| IRGO CONSULTING d.o.o. | 3 | €6.1M | Jul 2026 |
| Zavod za gradbeništvo Slovenije | 2 | €4.3M | Sep 2026 |
| PROJEKT D.D. NOVA GORICA Podjetje za inženiring, geodezijo, urbanizem in projektiranje | 2 | €1.5M | Jan 2026 |
| IGMAT, Inštitut za gradbene materiale, d.d.; Zavod za gradbeništvo Slovenije | 1 | €4.0M | Sep 2026 |
| ELEA IC projektiranje in svetovanje d.o.o. | 1 | €3.5M | Mar 2026 |
Based on 24 awards with a linked company profile over the last 5 years.
15 open tenders right now
- Repair, maintenance and associated services related to road transport and other equipment - Routine maintenance of the new main road GC 1-2 Hajdina - Ormoz, section Markovci - Gorisnica - Ormoz 1 day left
- Architectural services relating to buildings - Preparation of DPP, DGD and PZI design documentation for the construction of a new motorway base in Slovenj Gradec 1 day left
- Electrical installation works - Renovation of ESO equipment in the Cenkova and Vodole tunnels and the covered cable trenches in Močna and Malečnik 3 days left
Market context
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.
- open now in Architecture & engineering services
- 7,761
- median open notice
- €300,000
Who wins in this market
Many suppliersSlovenia · Architecture & engineering services
- different companies won awards here
- 256
- of the awards went to the three most frequent winners
- 10%
- buyers awarded contracts here
- 127
Based on 431 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 2.6
- of those lots received a single tender
- 37%
- of the awards went to companies based in another country
- 4%
- of the tenders came from another country
- 2%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
8
days left
€3,600,000
est. value
Awarded before
Never miss a tender like this
22 new notices in Architecture & engineering services in Slovenia in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Engineering design services for mechanical and electrical installations for buildings: an email when new tenders arrive under it, no account needed.