Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 5 days ago Contract award

România - Lucrări de construcţii - Lucrări de întreținere și reparaţii curente defalcate pe 4 loturi în cazărmile 389 București - UM 01575 București, 763 Ploiești - UM 01410 Ploiești, 1360 Predeal - UM 01090 Predeal, 2628 Pitești - UM 01643 Pitești

Awarded Romania Sud-Muntenia Construction work

Buyer U.M. 02031 Bucuresti

€952,558 awarded value

Key facts

Published
Procedure
Open procedure
  1. Published
  2. Awarded pending

TED - Tenders Electronic Daily (Publications Office of the EU) does not publish the date of this award. See the official notice

View the official notice Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

Awarded to

EDCO PREST BUILDING SRL; RAWTECH CONSTRUCT; MAG CONSTRUCT

Awarded value
€952,558
Bids received
17 over 4 lots

Description

Lucrări de întreținere și reparații curente, defalcate pe 4 loturi: - LOTUL NR. 1: Lucrări de întreținere și reparații curente la Pavilionul D-47 - Comandament din Cazarma 389 București - UM 01575 Bucureștii; - LOTUL NR. 2: Lucrări de întreținere și reparații curente la Pavilionul A- Administrativ din Cazarma 763 Ploiești - UM 01410 Ploiești; - LOTUL NR. 3: Lucrări de întreținere și reparații curente la Pavilionul C - Comandament din Cazarma 1360 Predeal - UM 01090 Predeal; - LOTUL NR. 4: Lucrări de întreținere și reparații curente la Pavilionul D - Remiză Auto din Cazarma 2628 Pitești - UM 01643 Pitești; NOTA 1. In conformitate cu prevederile art. 160 alin. (1) din Legea nr. 98/2016, termenul limită până la care orice operator economic interesat are dreptul de a solicita clarificări sau informaţii suplimentare în legătură cu documentaţia de atribuire este de maxim 17 zile înainte de data limită de depunere a ofertelor. NOTA 2: În conformitate cu prevederile art. 160 alin. (2) din Legea nr. 98/2016, autoritatea contractantă va răspunde în mod clar şi complet tuturor solicitărilor de clarificare/informaţilor suplimentare în a 11-a zi dinainte de termenul limită stabilit pentru depunerea ofertelor, ţinând cont şi de prevederile Notificării ANAP cu privire la modalitatea de punere în aplicare a dispoziţiilor art. 160 alin. (2) din Legea nr. 98/2016. Orice solicitare de clarificare transmisă după data menţionată la nota 1, va pune autoritatea contractantă în imposibilitatea de a oferi un răspuns în termenul menţionat la nota 2 şi drept urmare solicitarea se va considera TARDIVĂ. Cantitatile si natura lucrarilor de reparatii curente sunt cele prevazute in caietul de sarcini si listele de lucrari.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 5 days ago

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 1,588 awards for Construction work in Romania.

This award
€952,558
Median award
€5.5M
Middle half of past awards
€1.9M to €11.3M

The award is smaller than three in four past awards.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

U.M. 02031 Bucuresti

Romania

Who wins its contracts

Moderately concentrated
different companies won its awards
9
of the awards went to the three most frequent winners
40%
of its calls state an estimated value
92%

Based on 10 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
4.9
of those lots received a single tender
12%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Recent awards

1 open tender right now

Market context

open now in Construction work
29,727
median open notice
€783,629

Who wins in this market

Many suppliers

Romania · Construction work

different companies won awards here
1,160
of the awards went to the three most frequent winners
6%
buyers awarded contracts here
406

Based on 1,671 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
3.5
of those lots received a single tender
19%
of the awards went to companies based in another country
2%
of the tenders came from another country
8%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

188 new notices in Construction work in Romania in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Construction work: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language