Awarded to
Konsorcjum firm: SKANSKA S.A. - Lider, SKANSKA a.s. - Partner
- Awarded value
- €21,055,368
- Award date
- Record with this buyer
- 1 first contract from this buyer in the register
- Back on the market
- Sep 2027 How we know
When this contract comes back
estimated from the stated durationThis contract runs about 24 months, so it is back on the market around September 2027.
Every contract expiring, on the radarDescription
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 week ago
What this buyer has paid before
Based on 12 comparable contracts this buyer awarded in this sector over the last 4 years.
- This award
- €21.1M
- Median award
- €8.6M
- Middle half of past awards
- €4.5M to €21.1M
The award sits inside the usual range.
Most recent awards
- Roboty budowlane w zakresie budowy linii energetycznych - Rozbudowa DW 544 gr. woj. - Mława - Przasnysz - Ostrołęka prowadzącej do terenów inwestycyjnych Przasnyskiej Strefy Gospodarczej w Sierakowie - odcinek 1-4 od km 98+954,00 do km 111+954,00”, w ramach którego realizowane będą: Zadanie 1. Rozbudowa DW 544 - odcinek 1-3, Zadanie 2. Rozbudowa DW 544 - odcinek 4 - nr postępowania 256/25 €11,843,114
- Roboty budowlane w zakresie ścieżek pieszych - Remont istniejących ciągów pieszych, pieszo-rowerowych i rowerowych zlokalizowanych w pasie dróg wojewódzkich administrowanych przez Mazowiecki Zarząd Dróg Wojewódzkich w Warszawie z podziałem na 25 zadań - nr postępowania 296/25 €4,853,178
- Roboty w zakresie budowy dróg - „Rozbudowa drogi wojewódzkiej nr 583 na odcinku od km 7+627 do km 14+000 na terenie gminy Pacyna” - nr postępowania 276/25 €12,835,735
- Roboty w zakresie nawierzchni dróg - Rozbudowa drogi wojewódzkiej nr 573 od km 26+625 do km 29+625 na odcinku od m. Budy Kaleńskie do m. Kaleń na terenie gm. Szczawin Kościelny - nr postępowania 168/25 €3,204,607
- Main road construction works - 'Expansion of voivodeship road No. 544 on the section from km 138+200 to km 140+700 Bagienice Szlacheckie - Amelin' - procedure No. 148/25 €3,667,076
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileMazowiecki Zarząd Dróg Wojewódzkich w Warszawie
- notices in the register
- 447
- awards
- 227
- awarded in total
- €165.7M
Who wins its contracts
Many suppliers- different companies won its awards
- 133
- of the awards went to the three most frequent winners
- 11%
- of its calls state an estimated value
- 0%
Based on 211 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 5.9
- of those lots received a single tender
- 5%
- of the awards went to companies based in another country
- 0%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Awards most often to
- Przedsiębiorstwo Robót Drogowo-Budowlanych S.A.
- Strabag Sp. z o.o.
- Szpańscy Jerzy, Jacek, Dawid "Czystość" Spółka Jawna
16 open tenders right now
- Road construction works - Widening of provincial road no. 559 from km 45+060 to approx. km 46+730 in Maszewo Duże, Stara Biała municipality - procedure no. 148/26 1 day left
- Supervision of construction works - Performing the role of site inspector for the expansion of voivodeship road No. 559, Maszewo Duże 2 days left
- Development of design documentation for the expansion of voivodeship road 580 in Sochaczew, from the junction with Młynarska Street to the junction with Warzywna Street 2 days left
Market context
- open now in Construction work
- 19,748
- median open notice
- €550,000
Who wins in this market
Many suppliersPoland · Construction work
- different companies won awards here
- 13,540
- of the awards went to the three most frequent winners
- 2%
- buyers awarded contracts here
- 6,160
Based on 28,280 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 5.0
- of those lots received a single tender
- 12%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 3%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Change history
Every time an official source republished this notice with different content. We watch every source we index, including regional copies of the same notice.
-
- Award date
-
Was:
September 30, 2025 - Now: September 30, 2025
- Scope and criteria
- The description was expanded. Re-read it before you bid.
- Award value
-
Was:
€21,161,018 - Now: €21,055,368
Follow this tender and we email you the moment it changes. Create account
Similar tenders
Open now
Awarded before
Never miss a tender like this
2,268 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Road construction works: an email when new tenders arrive under it, no account needed.