Awarded to
Zakład Robót Komunikacyjnych - DOM w Poznaniu sp. z o.o.; TorKol sp. z o.o.
- Awarded value
- €91,135,769
- Bids received
- 10
- Record with this buyer
- 1 first contract from this buyer in the register
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 week ago
What this buyer has paid before
Based on 85 comparable contracts this buyer awarded in this sector over the last 4 years.
- This award
- €91.1M
- Median award
- €24.1M
- Middle half of past awards
- €5.8M to €91.1M
The award sits inside the usual range.
Most recent awards
- Roboty budowlane - „Zaprojektowanie i wykonanie robót w ramach zadania pn.:” Prace na linii kolejowej numer 404 na odcinku Białogard - Kołobrzeg wraz z robotami towarzyszącymi realizowanego w ramach projektu „poprawa bezpieczeństwa i likwidacja zagrożeń eksploatacyjnych na sieci kolejowej -ETAP II” €7,922,984
- Roboty budowlane - Remont sieci trakcyjnej w dwóch lokalizacjach: 1. Remont sieci trakcyjnej poprawa stanu infrastruktury kolejowej na linii kolejowej nr 714 w km 0,000 - 4,323 w wybranych lokalizacjach wraz z robotami towarzyszącymi; 2. Poprawa parametrów eksploatacyjnych sieci trakcyjnej na linii kolejowej nr 139 odcinek Czechowice Dziedzice - Bielsko-Biała €638,136
- Roboty budowlane - Remont sieci trakcyjnej w dwóch lokalizacjach: 1. Remont sieci trakcyjnej poprawa stanu infrastruktury kolejowej na linii kolejowej nr 714 w km 0,000 - 4,323 w wybranych lokalizacjach wraz z robotami towarzyszącymi; 2. Poprawa parametrów eksploatacyjnych sieci trakcyjnej na linii kolejowej nr 139 odcinek Czechowice Dziedzice - Bielsko-Biała €638,136
- Roboty budowlane - Wymiana szyn z ciągłą wymianą podkładów na odcinku Jabłonowo Pomorskie - Mełno w km 79,085-101,400 linii kolejowej nr 208 Działdowo-Chojnice wraz z robotami towarzyszącymi. €9,241,715
- Construction works - Design documentation and construction works for the modernisation of railway line no. 16 Łęczyca - Kutno €70,213,238
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profilePKP Polskie Linie Kolejowe S.A.
- notices in the register
- 888
- awards
- 237
- awarded in total
- €24.5B
Who wins its contracts
Many suppliers- different companies won its awards
- 137
- of the awards went to the three most frequent winners
- 7%
- of its calls state an estimated value
- 2%
Based on 184 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 4.4
- of those lots received a single tender
- 23%
- of the awards went to companies based in another country
- 3%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Awards most often to
31 open tenders right now
- Construction works - Design and execution of works on railway line no. 101 under the project 'Improving the quality and safety of cross-border rail connections through works on line no. 101 in Werchrata and at the railway station in Lviv' 1 day left
- Construction supervision services - Supervision for design and execution of works on railway line No. 68, Stalowa Wola Rozwadow - Przeworsk, including author's supervision, Stage I 1 day left
- Telecommunications equipment maintenance services - Maintenance of railway radio communication equipment in 2027-2028 2 days left
Market context
- open now in Construction work
- 19,748
- median open notice
- €550,000
Who wins in this market
Many suppliersPoland · Construction work
- different companies won awards here
- 13,540
- of the awards went to the three most frequent winners
- 2%
- buyers awarded contracts here
- 6,160
Based on 28,280 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 5.0
- of those lots received a single tender
- 12%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 3%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Change history
Every time an official source republished this notice with different content. We watch every source we index, including regional copies of the same notice.
-
- Scope and criteria
- The description was expanded. Re-read it before you bid.
- Award value
-
Was:
€91,593,064 - Now: €91,135,769
Follow this tender and we email you the moment it changes. Create account
Similar tenders
Open now
1
day left
€1,634,046
est. value
Awarded before
-
Roboty budowlane - Otwarta €37.4M
Never miss a tender like this
2,268 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Construction work: an email when new tenders arrive under it, no account needed.