The Aperlena Verdict
Narrow fieldBUDIMEX S.A. leads with 42.9% of the last 7 comparable contracts, but 5 different suppliers have won here in 5 years. Worth a serious look.
- Expected final price vs the published estimate
- -23.1%
Based on 7 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryThe contract covers the design and construction of high-speed railway lines no. 85 and 86 in the fields of railway traffic control systems (KSRK), teletechnics and non-traction power supply. The procurement is divided into two parts. Part 1 covers the base layer, including complete design documentation and construction works for the sections Warszawa Zachodnia - Kotowice, Kotowice - Lódz Fabryczna, Podg. Retkinia - Sieradz Polnocny (non-guaranteed scope) and Sieradz Polnocny - Kepno - Bierutow, including connections to the existing PKP PLK network. Part 2 covers the design, supply, installation, integration and commissioning of a railway traffic management system (TMS-D) with remote control layer (CTC).
Description
2 lots
- Lot 1
- Część 1 - Zaprojektowanie, budowa i wyposażenie (dostawa i instalacja systemów i urządzeń) linii kolejowych dużych prędkości nr 85 i 86 w zakresie branż KSRK, teletechnika oraz branż towarzyszących
- Lot 2
- Część 2 - Zaprojektowanie, budowa i wyposażenie (dostawa i instalacja systemów i urządzeń) linii kolejowych dużych prędkości nr 85 i 86 w zakresie branż KSRK, teletechnika oraz branż towarzyszących
- How tenders are scored
- Cena za zakres podstawowy; Cena za Opcję; Wydłużenie okresu gwarancyjnego; Ocena „Planu osiągnięcia zgodności funkcjonalnej platform produktowych" zgodnego z wymaganiami Zamawiającego; Cena The lots are scored differently: the official notice gives each lot its own criteria.
As the official notice states them.
Bid or no-bid?
Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.
Can I bid?
- Competitive dialogue: suppliers ask to take part, and the buyer discusses solutions with those it selects before they bid. Above the EU threshold: open to companies from any EU country.
- The notice is written in Polish.
- Certificates from another EU country? Check the equivalents on eCertis
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 day ago
What this buyer has paid before
Based on 6 comparable contracts this buyer awarded in this sector over the last 4 years.
- Median award
- €26.0M
- Middle half of past awards
- €22.6M to €31.5M
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.
Most recent awards
- Construction of complete buildings or parts thereof and civil and water engineering works - Relocation of the PG-31 ditch channel with reconstruction of drainage facilities and construction of a dry flood-retention reservoir on the final section of the relocated PG-3 ditch €19,928,559
- Roboty budowlane - Zaprojektowanie i wykonanie budowy bocznicy kolejowej i robót towarzyszących dla projektu pn. „Budowa Centralnego Portu Komunikacyjnego wraz z urządzeniami i obiektami niezbędnymi do jego funkcjonowania - budowa bocznicy kolejowej na odcinku linia kolejowa nr 3 - Centralny Port Komunikacyjny €33,255,906
- Roboty w zakresie budowy autostrad, dróg - Budowa korytarzy transportowych dojazdowych przy budowie Centralnego Portu Komunikacyjnego - ETAP 3 €25,648,837
- Roboty w zakresie budowy autostrad, dróg - Budowa korytarzy transportowych dojazdowych przy budowie Centralnego Portu Komunikacyjnego - ETAP 1 €21,599,267
- Roboty budowlane - Budowa tunelu dalekobieżnego w Łodzi w ciągu linii kolejowej nr 85, od komory Retkinia do komory Fabryczna wraz z infrastrukturą niezbędną do budowy oraz funkcjonowania tunelu, komór i linii kolejowej. €494,875,845
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileCentralny Port Komunikacyjny sp. z o.o.
- notices in the register
- 172
- awards
- 44
- awarded in total
- €875.5M
Who wins its contracts
Many suppliers- different companies won its awards
- 30
- of the awards went to the three most frequent winners
- 23%
- of its calls state an estimated value
- 0%
Based on 35 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 4.8
- of those lots received a single tender
- 13%
- of the awards went to companies based in another country
- 3%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| Budimex S.A. | 3 | €46.3M | Oct 2026 |
| PORR S.A.; PORR Bau GmbH | 1 | €494.9M | Apr 2025 |
| TRACK TEC CONSTRUCTION sp. z o.o.; UNIBEP Spółka Akcyjna | 1 | €33.3M | Oct 2025 |
| TRAKCJA S.A. | 1 | €25.6M | Oct 2025 |
| DUNA POLSKA S.A. | 1 | €21.6M | Sep 2025 |
Based on 7 awards with a linked company profile over the last 5 years.
19 open tenders right now
- Baggage screening equipment - Design, delivery, installation, commissioning and servicing of security screening equipment for the airport under the Port Polska investment programme 3 days to request
- Construction works - Development of design documentation and execution of construction works for the 'Energy' subsystem - overhead catenary on railway line No. 85, Warsaw - Lodz section 4 days to request
- Software packages and IT systems - Purchase of subscription to design platform and software with support and development services 8 days left
Market context
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.
- open now in Construction work
- 19,935
- median open notice
- €547,553
Who wins in this market
Many suppliersPoland · Construction work
- different companies won awards here
- 13,454
- of the awards went to the three most frequent winners
- 2%
- buyers awarded contracts here
- 6,146
Based on 28,089 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 5.0
- of those lots received a single tender
- 12%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 3%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Awarded before
Never miss a tender like this
2,237 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Construction work: an email when new tenders arrive under it, no account needed.