Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 3 days ago Contract award

Poland - Construction of a bridge over the Odra River in Nowa Sól on provincial road No. 315, under a design and build system

Original Polska - Roboty budowlane w zakresie wznoszenia kompletnych obiektów budowlanych lub ich części oraz roboty w zakresie inżynierii lądowej i wodnej - Budowa mostu przez rzekę Odrę w m. Nowa Sól w ciągu drogi woj. nr 315 - w systemie „zaprojektuj i wybuduj"

Awarded Poland Lubuskie Construction work

Buyer Województwo Lubuskie - Zarząd Dróg Wojewódzkich

€9.6M awarded value · €9,638,885

Key facts

Published
Procedure
Open procedure
  1. Published
  2. Awarded pending

TED - Tenders Electronic Daily (Publications Office of the EU) does not publish the date of this award. See the official notice

View the official notice Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

Awarded to

INTERCOR Sp. z o.o.; ADAMIETZ WARSZAWA Sp. z o.o.

Awarded value
€9,638,885
Bids received
9
Record with this buyer
1 first contract from this buyer in the register

Summary

Machine-generated summary

The provincial road authority of Lubuskie Voivodeship, Zarząd Dróg Wojewódzkich, awarded a design and build contract for the construction of a bridge over the Odra River in Nowa Sól, including access roads and demolition of the existing bridge, on provincial road No. 315. The works covered all necessary design documentation, permits, decisions and approvals, construction and assembly works, and obtaining the occupation permit. The contract was awarded to INTERCOR Sp. z o.o. and ADAMIETZ WARSZAWA Sp. z o.o. for about EUR 9,638,884.57, converted from PLN at the ECB reference rate.

Description

Przedmiotem zamówienia jest zaprojektowanie i budowa mostu przez rzekę Odrę w m. Nowa Sól wraz z dojazdami i rozbiórką istniejącego obiektu mostowego w ciągu drogi wojewódzkiej nr 315 (gmina Nowa Sól, powiat nowosolski). W zakres zamówienia wchodzi wykonanie wszystkich niezbędnych prac projektowych oraz robót budowlano montażowych, które umożliwią prawidłowe funkcjonowanie drogi wojewódzkiej, zgodnie z obowiązującymi przepisami prawa. W ramach zamówienia należy wykonać: 1) wszystkie niezbędne opracowania projektowe umożliwiające zrealizowanie Przedmiotu Umowy zgodnie z Wymaganiami Zamawiającego i Kontraktem zwanym zamiennie Umową. W ramach prac projektowych Wykonawca zobowiązany jest do uzyskania, w imieniu i na rzecz Inwestora, opinii, warunków technicznych, wszelkich uzgodnień, pozwoleń, zezwoleń, decyzji (w tym uzyskanie Decyzji o Środowiskowych Uwarunkowaniach) i zgód niezbędnych do złożenia wniosku w celu uzyskania decyzji o zezwoleniu na realizacje inwestycji drogowej (ZRID) lub innej decyzji pozwalającej na prowadzenie robót budowlanych i rozbiórkowych. Prace Projektowe należy prowadzić w oparciu o PFU, WWiOPP oraz odpowiednie przepisy prawa. 2) wszystkie niezbędne roboty budowlane w oparciu o dokumentację projektową opracowaną przez Wykonawcę i zatwierdzoną przez Zamawiającego, PFU, WWiORB, WWiORM oraz odpowiednie przepisy prawa. Ponadto uzyskać w imieniu i na rzecz Inwestora decyzje o pozwoleniu na użytkowanie lub inne dokumenty umożliwiające przystąpienie przez Zamawiającego do użytkowania obiektów budowlanych zgodnie z ustawą Prawo budowlane. Szczegółowy opis przedmiotu zamówienia określony został w Programie funkcjonalnoużytkowym w Rozdziale III SIWZ.

Terms of the procedure

How tenders are scored
cena (C) waga 60 %: 60 percent; Doświadczenie osób wyznaczonych do realizacji zamówienia – projektanta głównego branży mostowej (PM)- waga 20%: 20 percent; długość okresu gwarancji jakości robót budowlanych (G) – waga 20%: 20 percent

As the official notice states them.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 3 days ago

What this buyer has paid before

Based on 3 comparable contracts this buyer awarded in this sector over the last 4 years.

This award
€9.6M
Median award
€9.6M
Middle half of past awards
€8.4M to €26.0M

The award sits inside the usual range.

Most recent awards

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Województwo Lubuskie - Zarząd Dróg Wojewódzkich

Poland

notices in the register
149
awards
75
awarded in total
€63.1M

Who wins its contracts

Many suppliers
different companies won its awards
48
of the awards went to the three most frequent winners
18%
of its calls state an estimated value
0%

Based on 67 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

of the awards went to companies based in another country
0%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Awards most often to

  1. Eurovia Polska S.A. 5 awards
  2. Przedsiębiorstwo Wielobranżowe FAWAL Filip Walczak 4 awards
  3. EKOSERVICE Sp. z o.o. USŁUGI Sp. k. 3 awards €90,230

1 open tender right now

Market context

open now in Construction work
20,236
median open notice
€550,318

Who wins in this market

Many suppliers

Poland · Construction work

different companies won awards here
13,672
of the awards went to the three most frequent winners
2%
buyers awarded contracts here
6,185

Based on 28,664 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.0
of those lots received a single tender
12%
of the awards went to companies based in another country
1%
of the tenders came from another country
3%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

2,181 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Works for complete or part construction and civil engineering work: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language