Awarded to
Przedsiębiorstwo Robót Elektrycznych i Budowlanych MIPA Leon Stankiewicz
- Awarded value
- €144,644 43% under the estimate of €252,811
- Award date
- Bids received
- 3
- Back on the market
- Jan 2027 How we know
When this contract comes back
estimated from the stated durationThis contract runs about 5 months, so it is back on the market around January 2027.
Every contract expiring, on the radarSummary
Machine-generated summaryThe City of Bialystok awarded a contract for construction of a bicycle path along Mikolaj Kopernik Street in Bialystok, from Depowa Street to the entrance in front of the prison. The works included about 239 m of two-way bicycle path, about 26 m of shared pedestrian and cycle path, about 255 m of footpath, a bus bay, rebuilding of the low-voltage street lighting cable network, shrub plantings, vertical and horizontal road signs, a traffic organisation project for the construction period and 2 single-sided memorial information boards. Przedsiebiorstwo Robot Elektrycznych i Budowlanych MIPA Leon Stankiewicz won, for about EUR 144,644.23, converted from PLN at the ECB reference rate, 43% below the estimate. Award date: 2026-08-12. Duration: 5 months, ending about 2027-01-11, when it returns to market.
Description
Terms of the procedure
- How tenders are scored
- Price: 60 percent; Quality: 40 percent
As the official notice states them.
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 day ago
What this buyer has paid before
Based on 16 comparable contracts this buyer awarded in this sector over the last 4 years.
- This award
- €144,644
- Estimated value
- €252,811
- Median award
- €534,146
- Middle half of past awards
- €380,475 to €850,094
The award is smaller than three in four past awards.
Most recent awards
- Construction works related to school buildings - Extension and thermal modernisation of Municipal Kindergarten No. 47, Bialystok, Sw. Wojciecha 14 €1,330,806
- Roboty budowlane w zakresie ścieżek rowerowych - Budowa drogi dla rowerów w Białymstoku wzdłuż ul. S. Żeromskiego na odcinku od ul. Transportowej do ul. K. Pułaskiego. €420,632
- Roboty budowlane w zakresie ścieżek rowerowych - Budowa drogi dla rowerów w Białymstoku wzdłuż ul. Zwycięstwa oraz wzdłuż ul. Kolejowej i ul. Knyszyńskiej €442,961
- Roboty w zakresie budowy dróg - Rozbudowa ul. Pińskiej (drogi gminnej) w Białymstoku oraz budowa drogi gminnej KD-7D - ul. Bydgoskiej w Białymstoku €518,956
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileMiasto Białystok
- notices in the register
- 385
- awards
- 157
- awarded in total
- €152.9M
Who wins its contracts
Many suppliers- different companies won its awards
- 105
- of the awards went to the three most frequent winners
- 12%
- of its calls state an estimated value
- 0%
Based on 137 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 3.1
- of those lots received a single tender
- 34%
- of the awards went to companies based in another country
- 0%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Awards most often to
- BBGM Sp. z o.o.
- Przedsiębiorstwo Robót Elektrycznych i Budowlanych MIPA Leon Stankiewicz
- Przedsiębiorstwo Eksploatacji Ulic i Mostów sp. z o.o.
8 open tenders right now
- Modernisation of the football pitch at the Technical Schools complex, 14 Broniewskiego Street 2 days left
- Routine repairs of road surfaces, pavements and cycle paths using paving materials in the city of Bialystok, Part I - Northern District, Part II - Southern District 8 days left
- Planting services and green area maintenance - Planting, plant care and maintenance of flower beds and comprehensive greenery care in selected locations in the city of Bialystok 8 days left
Market context
- open now in Construction work
- 19,943
- median open notice
- €533,524
Who wins in this market
Many suppliersPoland · Construction work
- different companies won awards here
- 13,454
- of the awards went to the three most frequent winners
- 2%
- buyers awarded contracts here
- 6,146
Based on 28,089 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 5.0
- of those lots received a single tender
- 12%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 3%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Awarded before
Never miss a tender like this
2,245 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Cycle path construction work: an email when new tenders arrive under it, no account needed.