The Aperlena Verdict
Open raceNo supplier dominates: 12 different companies have won the last 13 comparable contracts from this buyer over 5 years. This is a genuinely open race.
- Expected final price vs the published estimate
- -7.5%
Based on 13 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryThe contract covers construction works to widen voivodeship road No. 536 in Iława, Warmian-Masurian voivodeship, Iława county, by building a road tunnel providing a safe, conflict-free crossing under railway line No. 9. The works include retaining walls and approach roads to the tunnel, with the road lowered below ground level over a significant section. Scope and technical parameters follow the attached design documentation, which received a final road investment permit decision on 13.12.2025, included in the tender documents. Unloadable soil replacement is settled via bill items for excavations and embankments. The buyer requires milestone-based delivery, with a minimum milestone within 7 months excluding winter, of at least 15% of the accepted contract value excluding general costs. Hazardous waste, such as demolition materials, must be removed and disposed of at the contractor's cost.
Description
Terms of the procedure
- How tenders are scored
- Price: 60 percent; Quality: 40 percent
As the official notice states them.
Bid or no-bid?
Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.
Can I bid?
- Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
- The notice is written in Polish.
- Certificates from another EU country? Check the equivalents on eCertis
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 day ago
What this buyer has paid before
Based on 13 comparable contracts this buyer awarded in this sector over the last 4 years.
- Median award
- €960,286
- Middle half of past awards
- €470,297 to €2.5M
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.
Most recent awards
- Road repair works - Resurfacing of road sections administered by RDW Olecko in 2026, divided into parts - II procedure €960,286
- Roboty w zakresie nawierzchni dróg - Remont nawierzchni drogi wojewódzkiej nr 542 Rychnowo - Działdowo w lok od km 37+800 do km 40+800 (Burkat - Filice). €642,062
- Roboty w zakresie nawierzchni dróg - Remont dróg wojewódzkich na terenie administracji RDW Nidzica z podziałem na 3 części: Część 1 - Remont drogi wojewódzkiej nr 538 (Rybno) Część 2 - Remont drogi wojewódzkiej nr 542 (Dąbrówno) Część 3 - Remont drogi wojewódzkiej nr 598 (Zazdrość) €652,843
- Roboty w zakresie naprawy dróg - Remont nawierzchni dróg wojewódzkich administrowanych przez Rejon Dróg Wojewódzkich w Kętrzynie z podziałem na 5 części €1,849,584
- Roboty w zakresie naprawy dróg - Odnowa nawierzchni odcinków dróg administrowanych przez RDW Olecko w 2026r. z podziałem na części - I postępowanie €974,086
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileWojewództwo Warmińsko - Mazurskie - Zarząd Dróg Wojewódzkich
- notices in the register
- 158
- awards
- 60
- awarded in total
- €65.4M
Who wins its contracts
Many suppliers- different companies won its awards
- 47
- of the awards went to the three most frequent winners
- 13%
- of its calls state an estimated value
- 10%
Based on 54 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 4.7
- of those lots received a single tender
- 14%
- of the awards went to companies based in another country
- 0%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| Strabag Sp. z o.o. | 2 | €7.3M | Oct 2025 |
| Budimex S.A. | 1 | €15.4M | Jul 2025 |
| INTOP S.A. | 1 | €6.3M | Jul 2025 |
| Mabau Polska Sp. z o.o.; STRABAG Sp. z o.o. | 1 | €2.5M | Jun 2026 |
| Przedsiębiorstwo Robót Drogowych Sp. z o.o. w Lidzbarku Warmińskim; Przedsiębiorstwo Budowy i Utrzymania Dróg Sp. z o.o. Ostrów Mazowiecka; „Przedsiębiorstwo Drogowo-Mostowe” w Piszu Sp. z o.o. | 1 | €1.8M | May 2026 |
Based on 13 awards with a linked company profile over the last 5 years.
6 open tenders right now
- Insurance services - Liability insurance for the ZDW in Olsztyn for administering voivodeship roads in the Warmian-Masurian Voivodeship and for property ownership 1 day left
- Insurance services - Liability insurance for the ZDW in Olsztyn for the administration of voivodeship roads in the Warmian-Masurian Voivodeship and for property ownership 7 days left
- Road surface works - Widening of provincial road No. 600 in the village of Orzyny 18 days left
Market context
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.
- open now in Construction work
- 19,748
- median open notice
- €550,000
Who wins in this market
Many suppliersPoland · Construction work
- different companies won awards here
- 13,540
- of the awards went to the three most frequent winners
- 2%
- buyers awarded contracts here
- 6,160
Based on 28,280 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 5.0
- of those lots received a single tender
- 12%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 3%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Awarded before
Never miss a tender like this
2,225 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Single carriageway construction work: an email when new tenders arrive under it, no account needed.