Poland - Construction works - Construction of power supply infrastructure for the Port Polska investment, including RPZ buildings (110 kV/15 kV), GPO-C substation building (110 kV/15 kV), generator substation buildings and 110 kV cable lines connecting Port Polska to the national power grid

Original Polska - Roboty budowlane - Budowa infrastruktury zasilającej inwestycję Port Polska, w tym budynki RPZ (110 kV/15 kV), budynek stacji GPO-C (110 kV/15 kV), budynki stacji agregatów prądotwórczych oraz linie kablowe 110 kV łączące inwestycję Port Polska z krajową siecią elektroenergetyczną

Open Poland Warszawski stołeczny Construction work

Buyer Centralny Port Komunikacyjny sp. z o.o.

Key facts

Published
No deadline published
Competition
Narrow field
  1. Published

TED - Tenders Electronic Daily (Publications Office of the EU) does not publish a closing date for this notice. See the official notice

View the official notice Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

The Aperlena Verdict

Narrow field

BUDIMEX S.A. leads with 42.9% of the last 7 comparable contracts, but 5 different suppliers have won here in 5 years. Worth a serious look.

Expected final price vs the published estimate
-23.1%

Based on 7 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.

Summary

Machine-generated summary

The contract covers the construction of power supply infrastructure for the Port Polska investment. It includes buildings of RPZ supply points (110 kV/15 kV), a GPO-C substation building (110 kV/15 kV), buildings for generator substation, and 110 kV cable lines connecting Port Polska to the national power grid. The scope is divided into 7 tasks, all covered by a single contract. The tasks include construction works and design work for connections to the PGE 110/110 kV substation with 110 kV lines on the east and south sides of the airport, four RPZ stations (RPZ-1 to RPZ-4) each with a SCADA system, connection to the PSE 400/110 kV substation with lines on the west and north sides, and the GPO-C station. Details are set out in the Description of Needs and Requirements.

Description

Przedmiotem zamówienia jest: „Budowa infrastruktury zasilającej inwestycję Port Polska, w tym budynki RPZ (110 kV/ 15 kV), budynek stacji GPO-C (110 kV/ 15 kV), budynki stacji agregatów prądotwórczych oraz linie kablowe 110 kV łączące inwestycję Port Polska z krajową siecią elektroenergetyczną”. Przedmiot zamówienia został podzielony na 7 Zadań, przy czym wszystkie Zadania będą przedmiotem jednej Umowy. Szczegółowy przedmiot zamówienia został opisany w Opisie Potrzeb i Wymagań (OPW). I. Przedmiotem zamówienia jest: „Budowa infrastruktury zasilającej inwestycję Port Polska, w tym budynki RPZ (110 kV/ 15 kV), budynek stacji GPO-C (110 kV/ 15 kV), budynki stacji agregatów prądotwórczych oraz linie kablowe 110 kV łączące inwestycję Port Polska z krajową siecią elektroenergetyczną”. Przedmiot zamówienia został podzielony na 7 Zadań, przy czym wszystkie Zadania będą przedmiotem jednej Umowy. II. Podział Zamówienia na Zadania: 2.1. Zadanie 1 - wykonanie robót budowlanych i niezbędnych prac projektowych dla przyłącza do Stacji 110/110 kV PGE wraz z liniami 110 kV po wschodniej i południowej stronie lotniska; 2.2. Zadanie 2 - wykonanie robót budowlanych i niezbędnych prac projektowych dla stacji Rozdzielczego Punktu Zasilającego: RPZ-1 wraz z systemem SCADA; 2.3. Zadanie 3 - wykonanie robót budowlanych i niezbędnych prac projektowych dla stacji Rozdzielczego Punktu Zasilającego: RPZ-2 wraz z systemem SCADA; 2.4. Zadanie 4 - wykonanie robót budowlanych i niezbędnych prac projektowych dla stacji Rozdzielczego Punktu Zasilającego: RPZ-3 wraz z systemem SCADA; 2.5. Zadanie 5 - wykonanie robót budowlanych i niezbędnych prac projektowych dla stacji Rozdzielczego Punktu Zasilającego: RPZ-4 wraz z systemem SCADA; 2.6. Zadanie 6 - wykonanie robót budowlanych i niezbędnych prac projektowych dla przyłącza do Stacji 400/110 kV PSE wraz z liniami 110 kV po zachodniej i północnej stronie lotniska; 2.7. Zadanie 7 - wykonanie robót budowlanych i niezbędnych prac projektowych stacji GPO-C wraz z przyłączem do sieci 110 kV i systemem SCADA. III. Szczegółowy przedmiot zamówienia został opisany w OPW.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 week ago

What this buyer has paid before

Based on 6 comparable contracts this buyer awarded in this sector over the last 4 years.

Median award
€26.0M
Middle half of past awards
€22.6M to €31.5M

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.

Most recent awards

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Centralny Port Komunikacyjny sp. z o.o.

Poland

notices in the register
173
awards
44
awarded in total
€875.5M

Who wins its contracts

Many suppliers
different companies won its awards
30
of the awards went to the three most frequent winners
23%
of its calls state an estimated value
0%

Based on 35 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
4.8
of those lots received a single tender
13%
of the awards went to companies based in another country
3%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Who usually wins this buyer's contracts in this sector

Company Wins Total awarded Last win
Budimex S.A. 3 €46.3M Oct 2026
PORR S.A.; PORR Bau GmbH 1 €494.9M Apr 2025
TRACK TEC CONSTRUCTION sp. z o.o.; UNIBEP Spółka Akcyjna 1 €33.3M Oct 2025
TRAKCJA S.A. 1 €25.6M Oct 2025
DUNA POLSKA S.A. 1 €21.6M Sep 2025

Based on 7 awards with a linked company profile over the last 5 years.

18 open tenders right now

Market context

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.

open now in Construction work
20,149
median open notice
€559,898

Who wins in this market

Many suppliers

Poland · Construction work

different companies won awards here
13,606
of the awards went to the three most frequent winners
2%
buyers awarded contracts here
6,176

Based on 28,474 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.0
of those lots received a single tender
12%
of the awards went to companies based in another country
1%
of the tenders came from another country
3%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Change history

Every time an official source republished this notice with different content. We watch every source we index, including regional copies of the same notice.

  1. Scope and criteria
    The description was expanded. Re-read it before you bid.

Follow this tender and we email you the moment it changes. Create account

Similar tenders

Open now

Awarded before

Never miss a tender like this

2,240 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Construction work: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language