Austria - Pipeline, telecom and power line construction works for motorways, roads, airfields and railways; earthworks - L204 cable collector Dornbirn construction stage 2026-2027

Original Österreich - Bauarbeiten für Rohrleitungen, Fernmelde- und Stromleitungen, für Autobahnen, Straßen, Flugplätze und Eisenbahnen; Nivellierungsarbeiten - Tiefbauarbeiten, L204 Kabelkollektor Dornbirn Bauetappe 2026-2027

Awarded Austria Construction work

Buyer Vorarlberger Energienetze GmbH

€1.1M awarded value · €1,063,937

Key facts

Awarded
Procedure
Negotiated procedure
  1. Awarded
  2. Published
  3. Contract ends November 2027
View the official notice Watch this tender

This contract runs about 13 months, so it is back on the market around November 2027. Log in

Awarded to

Rhomberg Bau GmbH

Awarded value
€1,063,937
Award date
Record with this buyer
2 contracts from this buyer in the register, €2.1M in total
Back on the market
Nov 2027 How we know

When this contract comes back

This contract runs about 13 months, so it is back on the market around November 2027.

Every contract expiring, on the radar

Summary

Machine-generated summary

Vorarlberger Energienetze GmbH is building a cable collector in Dornbirn. The construction project connects to construction lot 3 and covers the area from Birkenseeweg via Achmähder, Werbenhof and Möckle to the entrance of the UW Werben substation. The works are carried out in eight construction sections, running in two working parties in parallel, starting in sections 1 and 8. The contract was awarded to Rhomberg Bau GmbH on 2026-07-21 for EUR 1,063,937.10. Details on bids, contract duration and future publication dates are not included here.

Description

Die Vorarlberger Energienetze GmbH plant die Errichtung eines Kabelkollektors in Dornbirn. Das Bauvorhaben schließt an Baulos 3 an und umfasst den Bereich vom Birkenseeweg über Achmähder, Werbenhof und Möckle bis zur Einfahrt des UW Werben. Die Durchführung erfolgt in acht Bauabschnitten, die mit zwei Arbeitspartien parallel beginnend in Abschnitt 1 und 8 abgewickelt werden (siehe Leistungsbeschreibung).

Terms of the procedure

How tenders are scored
Preis: 90 percent; Schlüsselpersonal: 4 percent; Verkürzung der Ausführungszeit: 4 percent; Umweltmanagementsystem: 2 percent

As the official notice states them.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 day ago

What this buyer has paid before

Based on 5 comparable contracts this buyer awarded in this sector over the last 4 years.

This award
€1.1M
Median award
€1.1M
Middle half of past awards
€464,579 to €1.1M

The award sits inside the usual range.

Most recent awards

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Vorarlberger Energienetze GmbH

Austria

notices in the register
30
awards
18
awarded in total
€25.8M

Who wins its contracts

Many suppliers
different companies won its awards
15
of the awards went to the three most frequent winners
29%

Based on 17 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Awards most often to

  1. Rhomberg Bau GmbH 2 awards €2.1M
  2. Madlener Bau GmbH 2 awards €550,270
  3. IFK GesmbH 1 award €10.7M

5 open tenders right now

Market context

open now in Construction work
20,149
median open notice
€549,804

Who wins in this market

Many suppliers

Austria · Construction work

different companies won awards here
1,255
of the awards went to the three most frequent winners
8%
winners of the last 12 months were new here
994 of 1,120
buyers awarded contracts here
330

Based on 2,546 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners. New: no award from the same buyer or market in the two years before.

Competition

tenders per lot on average (open and restricted procedures)
5.4
of those lots received a single tender
10%
of the awards went to companies based in another country
2%
of the tenders came from another country
0%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

192 new notices in Construction work in Austria in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language