Nederland - Bouwwerkzaamheden voor zwembad - Nieuwbouw Recreatiecentrum De Fakkel Ridderkerk

Key facts

Awarded
Procedure
Restricted procedure
  1. Awarded
  2. Published
  3. Contract ends, estimated July 2030
View the official notice Watch this tender

This contract runs about 48 months, so it is back on the market around July 2030. Log in

Awarded to

van der Horst bouw en onderhoud B.V.

Award date
Bids received
3
Record with this buyer
1 first contract from this buyer in the register
Back on the market
Jul 2030 How we know

When this contract comes back

estimated from the stated duration

This contract runs about 48 months, so it is back on the market around July 2030.

Every contract expiring, on the radar

Description

Dit project omvat het ontwerpen, ontwikkelen en realiseren van een recreatiecentrum op basis van een UAV-gc overeenkomst (Design & Buid). De vraagspecificatie die in de volgende fase van de aanbesteding (gunningsfase) met de uitnodiging tot inschrijving zal worden meegestuurd bestaat naast het Programma van Eisen onder andere uit een inpassingsstudie en een concept VO-plattegrond. Het functioneel ontwerp zal dus in basisvorm worden meegegeven. Het nieuwe recreatiecentrum dient het bestaande complex volledig te vervangen op dezelfde locatie. Aangezien het uitgangspunt is de bestaande zwembaden en sporthal open te houden tijdens de nieuwbouw, is er besloten de locatie van het overdekte bad en de buitenbaden om te wisselen. Door de realisatie gefaseerd uit te voeren kan het overdekte deel gebouwd worden op de locatie van de buitenbaden. Na het gereedkomen hiervan wordt het oude gebouw gesloopt, waarna daar de buitenbaden worden gerealiseerd. Het nieuwe recreatiecentrum omvat circa 8.900 m2 bvo en bestaat op hoofdlijnen uit de volgende functies: • Centrale hal met horeca; • Een overdekt zwembad met een wedstrijdbad, doelgroepenbad en recreatiebad; • Een multifunctionele sporthal van 29 x 44 m; • Een turnhal; • Diverse buitenbaden; • Buitengebied binnen de plangrenzen; • Een multifunctionele ruimte voor gebruik door verschillende groepen (zoals verenigingsgebruik); • Facilitaire functies. Het complex dient van een hoogwaardig niveau te zijn qua uitstraling en inrichting, en zeer duurzaam uitgevoerd te worden. Het dient een energieneutraal gebouw te worden met een EPC-waarde van 0,0. Uitgangspunt is een all-electric complex zonder gasaansluiting. Vanwege de netcongestie dient het all-electric systeem tijdelijk (tot circa 2035) uitgebreid te worden tot een hybride systeem met bijvoorbeeld toevoeging van een gasketel of warmtekrachtkoppeling (WKK-installatie). Het huidige zwembad heeft reeds een gasaansluiting en WKK-installatie. Vanwege de locatie mag er geen warmtekoudeopslag systeem (WKO) toegepast worden. De locatie voor de nieuwbouw is binnen de huidige perceelsgrenzen van het bestaande complex. Het is gelegen aan de Sportlaan 8 te Ridderkerk, zoals op onderstaande kaart weergegeven. Zie selectieleidraad Zie selectieleidraad

Terms of the procedure

How tenders are scored
Prijs: 70 points; Kwaliteit: 30 points

As the official notice states them.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 hour ago

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 550 awards for Construction work in Netherlands.

Median award
€7.5M
Middle half of past awards
€3.5M to €16.5M

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

De Bedrijfsvoeringspartner (Barendrecht, Albrandswaard, Ridderkerk, De Bedrijfsvoeringspartner)

Netherlands

notices in the register
68
awards
30
awarded in total
€18.7M

Who wins its contracts

Many suppliers
different companies won its awards
20
of the awards went to the three most frequent winners
23%
of its calls state an estimated value
3%

Based on 22 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
2.5
of those lots received a single tender
25%
of the awards went to companies based in another country
0%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Awards most often to

  1. GKB Realisatie B.V. 2 awards €2.1M
  2. Volkswagen Pon Financial Services B.V. 2 awards €41,115
  3. J. van Huizen Groenvoorzieningen B.V. 1 award €2.8M

7 open tenders right now

Market context

open now in Construction work
20,238
median open notice
€554,000

Who wins in this market

Many suppliers

Netherlands · Construction work

different companies won awards here
493
of the awards went to the three most frequent winners
5%
buyers awarded contracts here
296

Based on 760 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
3.5
of those lots received a single tender
12%
of the awards went to companies based in another country
1%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

57 new notices in Construction work in Netherlands in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Construction work for swimming pool: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language