Skip to content
Aperlena

HILMA - hankintailmoitukset.fi (Hansel Oy) verified 4 hours ago Contract notice

Technical basic renovation works of Maunula Church

Original Maunulan kirkon tekninen peruskorjausurakka

Open Finland Helsinki-Uusimaa Construction work

Buyer Helsingin seurakuntayhtymä

21 days left

Key facts

Closes
10:00 (UTC+2)
Procedure
Open procedure
  1. Published
  2. Today
  3. Deadline open for 21 days
  4. Awarded pending

Bidding window

20 days from publication to deadline

Usual length

Notices of this kind (Finland, open procedure, below the EU threshold) give a median of 21 days, half of them between 15 and 28 days, based on 10,945 notices of the last two years.

This buyer usually gives 24 days (median of its last 37 calls for tender).

View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

Summary

Machine-generated summary

The Helsinki Parish Union invites tenders for the technical renovation contract of Maunula Church at Metsäpurontie 15, Helsinki. The 1980 building has two floors, a floor area of 1314 sqm and a volume of 6360 m3. The works include removing two residential apartments at the eastern end of the second floor and converting the space into office and reception rooms for the Oulunkylä Parish. Contractors must attend a guided site visit arranged with the project leader before bidding. Cost estimating takes place in October 2026, contractor selection in November 2026, and works are provisionally planned for 01/2027 to 12/2027. The lowest price is the award criterion.

Description

Maunulan kirkon tekninen peruskorjausurakka Helsingin seurakuntayhtymä pyytää urakkatarjoustanne Maunulan kirkon teknisestä peruskorjausurakasta tämän tarjouspyynnön ja sen liitteiden mukaisesti. Rakennuttaja edellyttää, että urakoitsija on tutustunut rakennuspaikkaan ja siellä vallitseviin olosuhteisiin ennen tarjouksen antamista. Kohdekäynnistä on sovittava projektin johtajan, Matti Prihan kanssa (matti.priha@evl.fi). Tutustumiskäynti kohteeseen on edellytys tarjouksen tekemiselle. Tilaaja sulkee sellaisen tarjoajan, joka ei ole tutustunut ohjatusti kohteeseen, pois tarjouskilpailusta. Kohteen urakkalaskenta-aika on lokakuussa 2026, urakoitsijavalinta tehdään marraskuussa 2026 ja työt kohteessa toteutetaan alustavasti ajalla 01/2027-12/2027. Tarjoajia pyydetään varautumaan, että selonottoneuvottelu tullaan pitämään 5.11.2026 klo 10 Helsingin seurakuntayhtymän tiloissa, johon urakoitsijan on varauduttava tulemaan. Tarjousten vertailussa käytetään halvinta hintaa valintaperusteena koska oleelliset laatuun vaikuttavat seikat on huomioitu kattavasti hankinnan kohteen määrittelyssä sekä hankinnan vähimmäisvaatimuksissa. Rakennuskohde Maunulan kirkko on vuonna 1980 valmistu kaupunginosassa korttelissa 213, tontilla 1. Rakennuksen osoite on Metsäpurontie 15, 00630 Helsinki. Rakennuksen pinta-ala on 1314 brm2 ja tilavuus 6360m3. Rakennus käsittää kaksi kerrosta, joista suurin osa palvelee kirkon ja seurakunnan toimintaa. Rakennuksen itäpäädyssä toisessa kerroksessa on kaksi asuinhuoneistoa, jotka tässä urakassa poistetaan, ja tila muutetaan Oulunkylän seurakunnan toimisto- ja vastaanottotiloiksi. Kiinteistön omistaa Helsingin seurakuntayhtymä. Hanke on esitelty laajemmin korjaustyöselostuksessa.,

Bid or no-bid?

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. In your favour:

    Do we meet every eligibility criterion?

    Open procedure: any interested supplier may submit a bid.

  2. Your call:

    Can we deliver this with the team we have?

    The register holds nothing on this. The official documents will.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Construction work.

  4. In your favour:

    Is the deadline realistic for a proper offer?

    21 days left, 15 of them working days.

  5. Your call:

    Is there a margin at the likely winning price?

    In this country this kind of contract is usually awarded for between €620,000 and €10.3M.

  6. Your call:

    Do we know this buyer?

    The buyer has 64 notices in the register and no pattern of winners yet.

Can I bid?

Official source

Source: HILMA - hankintailmoitukset.fi (Hansel Oy)

Always verify details on the official notice.

Report an error in this notice

Last verified against HILMA - hankintailmoitukset.fi (Hansel Oy) 4 hours ago

The official portal may ask for a free registration before downloading.

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 497 awards for Construction work in Finland.

Median award
€4.2M
Middle half of past awards
€620,000 to €10.3M

HILMA - hankintailmoitukset.fi (Hansel Oy) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Helsingin seurakuntayhtymä

Finland

notices in the register
64
awards
7
awarded in total
€3.2M

Who wins its contracts

of its calls state an estimated value
6%

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

This buyer has no award history in this sector yet. Usual winners, Construction work - Finland

Company Wins Total awarded Last win
GRK Suomi Oy 15 €196.6M Jun 2026
Kreate Oy 12 €210.1M Aug 2026
VM Suomalainen Oy 11 €59.6M Jun 2026
Consti Korjausrakentaminen Oy 9 €546.3M Jul 2026
Caverion Suomi Oy 9 €61.6M Jun 2026

Based on 524 awards with a linked company profile over the last 2 years.

2 open tenders right now

Market context

HILMA - hankintailmoitukset.fi (Hansel Oy) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.

open now in Construction work
19,866
median open notice
€534,464

Who wins in this market

Many suppliers

Finland · Construction work

different companies won awards here
340
of the awards went to the three most frequent winners
7%
buyers awarded contracts here
201

Based on 524 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.5
of those lots received a single tender
5%
of the awards went to companies based in another country
1%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

64 new notices in Construction work in Finland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Construction work: an email when new tenders arrive under it, no account needed.

21 days left

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language