Awarded to
- Bids received
- 9 over 3 lots
- Winner's country
- Austria
- Record with this buyer
- 1 first contract from this buyer in the register
Summary
Machine-generated summaryRete Ferroviaria Italiana S.p.A. awarded a contract for the supply, under a Full Maintenance Service regime, of switch tampers (rincalzatrici da scambi) used to keep the national railway infrastructure in efficient condition. The contract is divided into three lots, each covering the supply of these switch tampers under the same full maintenance arrangement. The contract was awarded to a temporary grouping of companies (ATI) composed of PLASSER & THEURER, EXPORT VON BAHNBAUMASCHINEN, GESELLSCHAFT M.B.H. as lead member and PLASSER ITALIANA S.r.l. as partner. The estimated value of the contract is EUR 161,476,189.33. No awarded price, duration or return-to-market date is given in the notice.
Description
3 lots
- Lot 1
- LOTTO 1 estimated €58,249,810 · 114 months
- Lot 2
- LOTTO 2 estimated €58,249,810 · 114 months
- Lot 3
- LOTTO 3 estimated €44,976,569 · 90 months
- How tenders are scored
- Quality
As the official notice states them.
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 4 days ago
What this buyer has paid before
Based on 37 comparable contracts this buyer awarded in this sector over the last 4 years.
- This notice
- €161.5M
- Median award
- €2.2M
- Middle half of past awards
- €1.0M to €15.9M
The estimate is larger than three in four past awards.
Most recent awards
- Attrezzature ferroviarie - DAC.0267.2025-FORNITURA DI Sostanze Igniritardanti - Cat./Prog. 006/0030 €6,918,750
- Attrezzature ferroviarie - DAC.0275.2026-GPA-Fornitura di “Traverse in CAVP con Attacco Premontato per Sperimentazione” €598,682
- Attrezzature ferroviarie - DAC.0909.2025-GPA-Fornitura di “Barre per aghi” €11,139,606
- Railway equipment - DAC.0742.2025 - Open procedure for the supply of 'Measuring relays and protection devices for functions 50/51/50N/51N/50BF' €1,101,750
- Attrezzature ferroviarie - DAC.0005.2026_Fornitura di DISPOSITIVI PORTATILI DI MESSA A TERRA E IN CORTO CIRCUITO €2,226,625
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileRete Ferroviaria Italiana S.p.A.
- notices in the register
- 206
- awards
- 106
- awarded in total
- €2.4B
Who wins its contracts
Many suppliers- different companies won its awards
- 84
- of the awards went to the three most frequent winners
- 8%
- of its calls state an estimated value
- 100%
Based on 90 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 3.7
- of those lots received a single tender
- 23%
- of the awards went to companies based in another country
- 8%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Awards most often to
- Progress Rail Signaling S.p.A.
- RTI Margaritelli Ferroviaria S.p.A. (mandataria) e Overail S.r.l. (mandante); Consorzio Stabile Traver.Sud; RTI I.Ce. P. S.p.A. INDUSTRIA CEMENTI PREFABBRICATI(mandataria) e Wegh Group S.p.A. (mandante)
- COSEDIL S.p.A.
5 open tenders right now
- Railway equipment - Supply of electrical continuity devices 5 days left
- Railway equipment - Framework agreement for supply and calibration and maintenance service of portable detectors, trolleys and probes for ultrasonic and induced current non-destructive testing (NDT) on rails and turnouts of the national railway infrastructure managed by RFI 8 days left
- Railway equipment - Supply of substation transformers 5760 kVA 11 days left
Market context
- open now in Transport equipment & vehicles
- 4,447
- median open notice
- €249,975
Who wins in this market
Many suppliersItaly · Transport equipment & vehicles
- different companies won awards here
- 558
- of the awards went to the three most frequent winners
- 7%
- buyers awarded contracts here
- 388
Based on 894 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 2.2
- of those lots received a single tender
- 29%
- of the awards went to companies based in another country
- 2%
- of the tenders came from another country
- 0%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
11
days left
€41,691,835
est. value
12
days left
€758,500,000
est. value
46
days left
€758,500,000
est. value
Awarded before
Never miss a tender like this
43 new notices in Transport equipment & vehicles in Italy in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Railway maintenance or service vehicles: an email when new tenders arrive under it, no account needed.