Engineering - design, construction and installation works and author's supervision during construction of: Energy renovation of a multi-family residential building at 2 Stefan Karadzha St., Radnevo

Original „Инженеринг - проектиране, строително - монтажни работи и упражняване на авторски надзор по време на строителството на обект: „Енергийно обновяване на многофамилна жилищна сграда с адрес ул. „Стефан Караджа“ № 2, гр. Раднево, община Раднево“

Awarded Bulgaria Yugoiztochen Construction work

Buyer ОБЩИНА РАДНЕВО

€1.1M awarded value · €1,140,900

Key facts

Awarded
Estimated value
€1.1M
€1,148,285
Procedure
Open procedure
  1. Awarded
  2. Published
View the official notice Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

Awarded to

ГОЧЕВ СТИЛ ЕООД

Awarded value
€1,140,900 1% under the estimate of €1,148,285
Award date
Record with this buyer
2 contracts from this buyer in the register, €2.1M in total

Summary

Machine-generated summary

The Municipality of Radnevo awarded a contract for engineering services covering design of a technical project, construction and installation works, and author's supervision during the energy renovation of a multi-family residential building at 2 Stefan Karadzha Street, Radnevo. The works must follow the approved investment project and Ordinance No 4/21.05.2001. The contract was won by Gochev Styl EOOD for EUR 1,140,900, which is 1% below the estimated value of EUR 1,148,284.87. The award date was 2026-08-19.

Description

„Инженеринг - проектиране, строително - монтажни работи и упражняване на авторски надзор по време на строителството на обект: „Енергийно обновяване на многофамилна жилищна сграда с адрес ул. „Стефан Караджа“ № 2, гр. Раднево, община Раднево“ Обхватът на обществената поръчка включва: •          Проектиране - изготвяне на инвестиционен проект във фаза технически проект; •          Извършване на строително-монтажни работи по реализиране на строителството на обекта съгласно одобрения инвестиционен проект; •          Упражняване на авторски надзор по време на строителството на обекта. Изготвеният технически проект следва да е с обхват и съдържание, съгласно изискванията на Възложителя и представените изходни данни (доклад от извършено обследване за енергийна ефективност, сертификат за енергийни характеристики на сграда в експлоатация, резюме на доклада от извършеното обследване за енергийни характеристики на сградата, архитектурно заснемане, доклад за резултатите от обследване за установяване на техническите характеристики на сградата по всички части, технически паспорт), с необходимите детайли и количествени и количествено-стойностни сметки за всяка от приложимите проектни части. Техническите проекти следва да изясняват проектните решения в степен, осигуряваща възможност за цялостно изпълнение на всички видове строително-монтажни работи (СМР), като включват само допустимите дейности за финансиране съгласно програмата. Обемът и съдържанието на проекта следва да бъдат в съответствие с изискванията на Наредба № 4/21.05.2001 г. за обхвата и съдържанието на инвестиционните проекти. Във връзка с точното спазване на инвестиционните проекти при изпълнението на СМР изпълнителят посредством отделни правоспособни лица, автори на приложимата проектна документация по части, ще осъществява авторски надзор съобразно изискванията на чл. 162 от ЗУТ и договора за изпълнение. Изпълнението на СМР се извършва в съответствие с част трета “Строителство” от ЗУТ и започва след издаване на разрешение за строеж. Строителят изпълнява СМР на обекта в съответствие с издадените строителни книжа и условията на договора за изпълнение.

Official source

Source: CAIS EOP - Bulgarian national e-procurement (Public Procurement Agency)

Always verify details on the official notice.

Report an error in this notice

Last verified against CAIS EOP - Bulgarian national e-procurement (Public Procurement Agency) 1 month ago

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 1,927 awards for Construction work in Bulgaria.

This award
€1.1M
Estimated value
€1.1M
Median award
€211,853
Middle half of past awards
€68,969 to €724,259

The award is larger than three in four past awards.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

ОБЩИНА РАДНЕВО

Bulgaria

notices in the register
30
awards
14
awarded in total
€3.0M

Who wins its contracts

Moderately concentrated
different companies won its awards
9
of the awards went to the three most frequent winners
50%
of its calls state an estimated value
100%

Based on 12 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.7
of those lots received a single tender
11%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Awards most often to

  1. ГРАНИТ - М ООД 3 awards €265,330
  2. ГОЧЕВ СТИЛ ЕООД 2 awards €2.1M
  3. Хлебопроизводство СЗ ООД; УИКЕНД ООД; НИК - ИНВЕСТ - КАЗАНЛЪК ЕООД 1 award €174,333

5 open tenders right now

Market context

open now in Construction work
19,844
median open notice
€557,512

Who wins in this market

Many suppliers

Bulgaria · Construction work

different companies won awards here
1,049
of the awards went to the three most frequent winners
4%
buyers awarded contracts here
416

Based on 2,468 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
2.7
of those lots received a single tender
33%
of the awards went to companies based in another country
1%
of the tenders came from another country
1%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

225 new notices in Construction work in Bulgaria in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Thermal insulation work: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language