The Aperlena Verdict
Open raceNo supplier dominates: 28 different companies have won the last 30 comparable contracts from this buyer over 5 years. This is a genuinely open race.
Based on 30 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryWorks package for the decongestion and renovation project of the Neuilly Plaisance RER station on Line A. Lot 2 covers modification of the main access of Passenger Building 1 (BV1) and the platforms along their full length in both directions: demolition and re-laying of 1800 m2 of asphalt, supply and installation of 425 m2 of glazing, 1000 m2 of metal cladding, repainting of 1700 m2 and rearrangement of 170 m2 of rooms. Lot 3 concerns Passenger Building 2 (BV2): demolition of the existing access, creation of new accesses and a commercial premises, 470 m3 of demolition, 440 ml of piles and 700 ml of micropiles, 1100 m3 of concrete and 190 tonnes of steel structure. Work takes place in an urban site and an operating station, mostly at night, with a social integration clause.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 4 days ago
What this buyer has paid before
Based on 22 comparable contracts this buyer awarded in this sector over the last 4 years.
- Median award
- €6.5M
- Middle half of past awards
- €3.0M to €11.2M
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.
Most recent awards
- Electrical equipment works - Adaptation of lines for the MF19 rollout and automation of line 13. Modification of the 750V DC traction power supply, rail heating and alarm warning loops on the main and secondary tracks €11,000,000
- Travaux de construction - Accord cadre à bons de commande Opération MF19 Aménagement des locaux techniques des lignes de Métro 3 - 7 - 8 - 10 - 12 et 13 Lot AC LT02 - AMENAGEMENT DE LOCAUX TECHNIQUES Travaux Tous corps d’état (TCE) €5,000,000
- Travaux de câblage et d'installations électriques - Métro L12 - Atelier de Maintenance des Trains (AMT) de Vaugirard - Phase 2 Modification des infrastructures de la ligne 12 du métro - Adaptation pour la mise en circulation du MF19 - Lot Tx2.06b - Travaux de Traction €2,073,547
- Travaux d'étanchéification - Traitement d'infiltrations et réfection d'enduits sur les réseaux Métro - RER & Tramway €7,500,000
- Door installation - Preventive, corrective maintenance and renewal of automatic doors at RATP industrial buildings, workshops, technical facilities, commercial agencies, stations and stops €9,605,959
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileRATP
- notices in the register
- 367
- awards
- 110
- awarded in total
- €784.2M
Who wins its contracts
Many suppliers- different companies won its awards
- 102
- of the awards went to the three most frequent winners
- 6%
Based on 106 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- of the awards went to companies based in another country
- 4%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| Groupement CEGELEC PARIS VENTILATION - SDEL CONTROLE COMMANDE | 2 | €33.5M | Oct 2025 |
| ECONOVIA ENERGIES | 2 | €4.8M | May 2026 |
| Groupement solidaire CHANTIERS MODERNES CONSTRUCTION (Mandataire ) / DEMATHIEU BARD GENIE CIVIL / SOGEA IDF | 1 | €42.3M | Mar 2026 |
| Groupement conjoint BOUYGUES BATIMENT IDF / FAYAT FONDATIONS / BREZILLON | 1 | €33.0M | Apr 2026 |
| COMPAGNIE DES SIGNAUX | 1 | €15.2M | Aug 2025 |
Based on 30 awards with a linked company profile over the last 5 years.
248 open tenders right now
- Health and social services - Medical home controls for insured persons of the RATP Social Insurance Coordination Fund (CCAS) 10 days left
- Railway traffic control software development services - Study, development, commissioning and deployment of a next-generation centralised control room core product (Coeur Produit PCC NG) No deadline published
- Specialised construction works - Framework agreement: masonry, painting, metalwork, plumbing and signage works on Paris metro line 14 structures No deadline published
Market context
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.
- open now in Construction work
- 29,718
- median open notice
- €783,629
Who wins in this market
Many suppliersFrance · Construction work
- different companies won awards here
- 18,790
- of the awards went to the three most frequent winners
- 3%
- winners of the last 12 months were new here
- 11,470 of 15,597
- buyers awarded contracts here
- 8,474
Based on 52,964 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners. New: no award from the same buyer or market in the two years before.
Competition
- tenders per lot on average (open and restricted procedures)
- 4.0
- of those lots received a single tender
- 8%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 8%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Awarded before
Never miss a tender like this
1,083 new notices in Construction work in France in the last 7 days. Get an email when new ones appear. Free.
Set up my alert