The Aperlena Verdict
Open raceNo supplier dominates: 20 different companies have won the last 22 comparable contracts from this buyer over 5 years. This is a genuinely open race.
Based on 22 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryESCOTA is launching a multi-supplier framework agreement with subsequent contracts for repair works on civil engineering structures, retaining walls, tunnels and hydraulic crossing structures across its concessional motorway network, covering the A8, A50, A500, A501, A51, A52 and A57 motorways in the Provence and Alpes-Maritimes areas. The agreement covers routine maintenance and repair of structures and rehabilitation of hydraulic crossings with openings under 2 metres, with separate lots for the Provence sector and the Alpes-Maritimes sector. Excluded works: additional prestressing reinforcement, specialised work on cable structures such as cable-stayed or suspension bridges, complete repainting of metal structures, and repair of metal pipes over 2 metres in diameter.
Description
4 lots
- Lot 1
- Ouvrages d'art, tunnels et murs - Secteur Provence 24 months
- Lot 2
- Ouvrages d'art, tunnels et murs - Secteur Alpes Maritimes 24 months
- Lot 3
- Ouvrages de traversées hydrauliques - Secteur Provence 24 months
- Lot 4
- Ouvrages de traversées hydrauliques - Secteur Alpes Maritimes 24 months
- Tenders go to
- consultations-escota.omnikles.com
As the official notice states them.
Bid or no-bid?
Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.
Can I bid?
- Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
- The notice is written in French.
- Certificates from another EU country? Check the equivalents on eCertis
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 18 hours ago
What this buyer has paid before
Based on 21 comparable contracts this buyer awarded in this sector over the last 4 years.
- Median award
- €2.0M
- Middle half of past awards
- €1.1M to €5.5M
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.
Most recent awards
- Travaux de revêtement d'autoroutes - Programme 2026 - Rénovation des chaussées sur A50/A52: section entre la Ciotat et Aubagne €4,195,818
- Travaux d'assainissement - Accord cadre à bons de commande pour des travaux d’entretien et de curage des ouvrages hydrauliques inférieurs à 2 mètres sur le réseau ESCOTA €1,960,000
- Ouvrages d'art et de génie civil - Travaux de renforcement et réparation du viaduc de Carei Nord sur Autoroute A8 €3,889,188
- Murs de soutènement - Conception - Réalisation du confortement des murs tirantés sur l'autoroute A8, Saint-Laurent du Var - Cagnes-sur-Mer €15,271,053
- Travaux de construction de bassins d'eaux pluviales - Accord cadre à bons de commande pour les travaux de curage des bassins autoroutiers du réseau ESCOTA €1,900,000
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileESCOTA SOCIETE DES AUTOROUTES ESTEREL, COTE D'AZUR, PROVENCE, ALPES
- notices in the register
- 93
- awards
- 32
- awarded in total
- €109.5M
Who wins its contracts
Many suppliers- different companies won its awards
- 30
- of the awards went to the three most frequent winners
- 16%
- of its calls state an estimated value
- 26%
Based on 32 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 4.1
- of those lots received a single tender
- 7%
- of the awards went to companies based in another country
- 0%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| GTM SUD | 2 | €2.1M | Aug 2026 |
| EON GENIE CIVIL | 2 | €1.6M | Aug 2026 |
| NGE FONDATIONS; EGIS; SOLETANCHE BACHY | 1 | €15.3M | Nov 2025 |
| TRABET | 1 | €14.8M | May 2026 |
| COLAS FRANCE TERRITOIRE SUD EST; EIFFAGE ROUTE GRAND SUD-EST COTE D AZUR; EUROVIA PACA; NGE ROUTES; GUINTOLI | 1 | €9.0M | Aug 2025 |
Based on 22 awards with a linked company profile over the last 5 years.
6 open tenders right now
- Various maintenance and repair services - Framework agreement with purchase orders for routine maintenance and repair of motorway fences across the ESCOTA network 11 days left
- Civil engineering structures and structures of art - Framework agreement for repair works on structures, walls, tunnels and hydraulic crossings on the entire ESCOTA motorway network 18 days left
- Electrical equipment works - LED renovation of tunnel lighting on the A8 and A51 motorways 25 days left
Market context
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.
- open now in Construction work
- 19,943
- median open notice
- €533,524
Who wins in this market
Many suppliersFrance · Construction work
- different companies won awards here
- 18,661
- of the awards went to the three most frequent winners
- 3%
- winners of the last 12 months were new here
- 11,363 of 15,495
- buyers awarded contracts here
- 8,477
Based on 52,938 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners. New: no award from the same buyer or market in the two years before.
Competition
- tenders per lot on average (open and restricted procedures)
- 4.0
- of those lots received a single tender
- 8%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 8%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Awarded before
Never miss a tender like this
593 new notices in Construction work in France in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Engineering works and construction works: an email when new tenders arrive under it, no account needed.